Short-term uncertainty in investment models

Slides:



Advertisements
Similar presentations
WinDS-H2 MODEL Wind Deployment Systems Hydrogen Model Workshop on Electrolysis Production of Hydrogen from Wind and Hydropower Walter Short Nate Blair.
Advertisements

Concentrating Solar Deployment Systems (CSDS) A New Model for Estimating U.S. Concentrating Solar Power Market Potential Nate Blair, Walter Short, Mark.
Electrical Engineering Department, Amirkabir University of Technology, Tehran, Iran M. Poursistani N. Hajilu G. B. Gharehpetian M. Shafiei CHP Systems.
Ireland’s Energy Outlook Lawrence Staudt Centre for Renewable Energy, Dundalk IT.
1 John J. Conti Acting Director Office of Integrated Analysis and Forecasting Prepared for the Energy Technology System Analysis Program (ETSAP) Florence,
8-May Electricity portfolio management -A dynamic portfolio approach to hedging economic risk in electricity generation Stein-Erik.
Integrated Gas and Electricity Modelling Paul Deane Gas - Electricity Interactions Workshop June 2014 *
Olje- og energidepartementetwww.oed.dep.no The energy sector and policy challanges in Europe. Viewpoints from Norway Johan Vetlesen Deputy Director General.
Climate policies in the power market The effect of start-up costs of power plants YSSP Midsummer Workshop July 21, 2005 Orvika Rosnes Dep. of Economics.
Slide 1 Harnessing Wind in China: Controlling Variability through Location and Regulation DIMACS Workshop: U.S.-China Collaborations in Computer Science.
Anna Krook Riekkola, Energy Systems Technology Tying Europe together – long-term effects on green electricity production in the Nordic countries from cross-border.
The impacts of hourly variations of large scale wind power production in the Nordic countries on the system regulation needs Hannele Holttinen.
20% by 2030 The future of wind energy in New Zealand Eric Pyle, Chief Executive.
EMPIRE- modelling the future European power system under different climate policies Asgeir Tomasgard, Christian Skar, Gerard Doorman, Bjørn H. Bakken,
RES Integration for Increasing of Energy Supply Security in Latvia: ENVIRONMENTAL AND ECONOMICAL FACTORS NEEDS FORUM 2 “Energy and Supply Security – Present.
© Fraunhofer ISE 2015 Headquarter of Fraunhofer ISE, Freiburg, Germany The Leading Role of Cities: The Frankfurt Energy Scenario Gerhard Stryi-Hipp Coordinator.
RENEWABLE ENERGY POTENTIALS Projections to 2050 BASED ON THE PRESENTATION of Mohamed El-Ashry Chairman REN 21 3rd Ministerial Meeting in Gleneagles Dialogue,
Key developments and challenges in the Nordic region - Eurelectric Members’ Day Oluf Ulseth CEO, Energy Norway Brussels, February 6, 2012.
Demand Response – A New Option for Wind Integration ?
Prof. H.-J. Lüthi WS Budapest , 1 Hedging strategy and operational flexibility in the electricity market Characteristics of the electricity.
Impacts of wind power on energy balance of a hydro dominated power system EWEC 2006, Athens MSc Juha Kiviluoma, VTT PhD Hannele Holttinen, VTT.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Alaa Alhamwi, David Kleinhans, Stefan Weitemeyer, Thomas Vogt 3rd European Energy Conference - E2C 2013 October 29 th, 2013 Optimal Mix of Renewable Power.
Diagram from the publication
The Impact of Intermittent Renewable Energy Sources on Wholesale Electricity Prices Prof. Dr. Felix Müsgens, Thomas Möbius USAEE-Conference Pittsburgh,
EG, EPS, Rome, EU-wide studies on the integration of renewable energies in the electricity grid F. Wagner, IPP Greifswald 1 Exemplified first.
Wind Production intermittency Cross border compensation: what to expect in Western Europe? Analysis of Winter 2010/2011 Hubert Flocard and Jean-Pierre.
Ingeborg Graabak NTNU, Supervisor professor Magnus Korpås NORWEGIAN HYDROPOWER CENTRE Balancing of wind and solar production in Northern Europe with Norwegian.
Heat Plan Denmark Low Carbon Urban Heating Anders Dyrelund, market manager Rambøll Denmark.
1 Perspectives of CCS power plants in Europe under different climate policy regimes Tom Kober, Markus Blesl Institute of Energy Economics and the Rational.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Multiscale energy models for designing energy systems with electric vehicles André Pina 16/06/2010.
© OECD/IEA 2016 The global energy outlook and what it means for Portugal Dr. Fatih Birol Executive Director, International Energy Agency Portugal IDR launch.
GRID INTEGRATION COST OF PHOTOVOLTAIC POWER GENERATION G. Strbac, D. Pudjianto, P. Djapic, J. Dragovic Energy Futures Lab.
The Risks around Renewables? March 2012 Campbell Dunford.
CEESA PROJECT WP 3. FUTURE ELECTRIC POWER SYSTEMS
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Dr. Gabrial Anandarajah, Dr. Neil Strachan King’s College London
Energy Year 2016 Electricity
Contents Introduction Focus area Wind scenarios
Operation of power systems with high shares of wind power
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
Dominik Franjo Dominković. , I. Bačeković, D. Sveinbjörnsson, A. S
GENESYS Redevelopment Strawman Proposal
KEY MESSAGES FROM WEC CESI REPORT JUST LAUNCHED
Matthew Wittenstein Electricity Analyst, International Energy Agency
Assess variability from year to year: 2010, 2012, 2013, 2015
Basics of energy modelling III: Time representation and considerations
Sustainable Energy Planning for Autonomous Power System of Crete
Global energy-related CO2 emissions
6.5 Stochastic Prog. and Benders’ decomposition
System Control based Renewable Energy Resources in Smart Grid Consumer
Olli Kauppi Helsinki School of Economics & Hecer Matti Liski
penetration of wind power
Assess variability from year to year: 2010, 2012, 2013, 2015
Evaluating flexibility and adequacy in future EU power systems: model coupling and long-term forecasting Sylvain Quoilin, Wouter Nijs and Andreas Zucker.
Energy Year 2017 Electricity
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
MIT tour of the California ISO Control Center March 31, 2015
Additional clarifications on economic and adequacy running hours
Energy Year 2017 Electricity
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
Energy Year 2018 Electricity
New England Electricity Restructuring Roundtable September 18, 2009
Energy Year 2018 Electricity
Arslan Ahmad Bashir Student No
6.5 Stochastic Prog. and Benders’ decomposition
Jim Mcintosh Director, Executive Operations Advisor California ISO
FUNDAMENTALS OF 100%RES POWER SYSTEM
Ciara O’Dwyer Damian Flynn ESRI/UCD conference 17/09/2019
Presentation transcript:

Short-term uncertainty in investment models Pernille Seljom & Asgeir Tomasgard CREE 3rd research workshop 16.09.2013 30.11.2018

Introduction Research project founded by the Research Council of Norway (2011 – 2014) “The future Norwegian energy system in an European context” Long-term TIMES model of Northern Europe Some research questions: How will the different global and European energy scenarios affect Norway? What will be the future role of Norwegian hydropower? Important premise Proper modelling of unpredictable wind power = short-term uncertainty of supply Research project at IFE, PhD position at NTNU Today – Work from 1st paper presented – unpredictable characteristics of wind power in a case study of the Danish heat and electricity sector 30.11.2018

Introduction Short-term uncertainty = availability of wind power Mismatch supply and demand Back-up capacity, transmission, storage Long-term investment models as TIMES More wind power = more short-term uncertainty How to model? Stochastic modelling of short-term uncertainty Operational models - state of the art Investment models - not as common We use stochastic programming Case study: TIMES model of the Danish heat and electricity sector Operational models = Unit Commitment 30.11.2018

Denmark- some energy facts Wind power Combines Heat and Power (CHP) Highly interconnected Data: Energistyrelsen Interconnected to Norway, Sweden, Germany Two physical separated grids until August 2010 were the two Nord Pool regions were connected (600 MW) In EU, Denmark largest share if electricity production from CHP – 49 % in 2010, 12 % EU average Denmark is the country with largest share of electricity production from wind power, 28 % in 2011 Figure: Nord Pool Spot 07.06.2013 30.11.2018

Model description TIMES (The Integrated MARKAL-EFOM system) Modelling tool developed by ETSAP, an implementing agreement of IEA Used by individuals/ teams in 63 countries Work Shop twice a year Model support and continuous development Investment model of the Danish heat and electricity sector Linear Programming model Model regions Denmark East (DK-E) and Denmark West (DK-W) Model horizon 2010 – 2050 Model periods 2010, 2015, 2020, 2030, 2040, 2050 Period split 4 seasons, 12 two-hour periods Obj. function minimize total energy system costs Perfect foresight IEA – International Energy Agency Work shop : Share experiences and discuss needs for further improvement 30.11.2018

Model description 30.11.2018

Model description Traditionally in TIMES, wind power is modelled with a deterministic electricity peak reserve constraint Sufficient capacity such that wind power only can contribute to a part of peak electricity demand Possible wind contribution to the peak electricity demand 30 % typical value used 0 % most conservative value What is the right value ??? Deterministic electricity prices in external trading regions Germany, Sweden and Norway This constraint can ensure sufficient capacity. The right value is dependent on the energy system characteristics – how much wind power, how the wind power is correlated, and so on……. 30.11.2018

Model description We do Stochastic modelling of wind availability Stochastic modelling of electricity prices in trading regions Not previously done in TIMES! Future scenarios based on hourly historical data (2006- 2011) Hourly wind power production in DK-E and DK-W Wind turbine capacity in DK-E and DK-W Electricity prices in Germany, Sweden and Norway Stochastic sub-annual trade prices - Wind power data – include both onshore and offshore production and capacity data Danish electricity prices are endogenous generated in the model but the electricity prices outside Denmark are exogenously given Projected prices for biomass, fossil fuels, CO2 and annual electricity prices are from a Energinet study We use historical data to present possible future scenarios – not necessarily a valid assumption but it is considered the best available basis Not sufficient with annual electricity prices since the price tend to vary with season and time of day 30.11.2018

Modelling uncertainty Optimal investments given short-term uncertainty Wind availability = wind production / max theoretical production 1 stage= investment decisions wind availability and electricity price unknown 2 stage = operational decisions wind availability and electricity price in known Max theoretical production: 1 MW turbine can max produce 1 MWh in a given hour Two-stage scenario tree Scenario tree – discrete description of the outcomes of the uncertain parameter Stage – where new information is revealed Path – possible realisations of the uncertain parameter Model returns scenario independent investment decisions and scenario dependent operational decisions 30.11.2018

Wind power characteristics Average wind availability (2006 - 2011) Winter and spring shown in figure. Average is highest in winter and smallest in summer for both regions. Wind availability tend to be higher in the middle of the day compared to at night for all seasons except winter where the availability is more flat throughout the day. Figure spring show large variations within a season. 30/11/2018

Wind power characteristics Variance in wind availability (2006 - 2011) Variance show that wind availability is not predictable!!! 30.11.2018

Wind power characteristics Figure – Hourly wind availability of the first week of 2008 – 2011. Figure show 1. The wind is highly stochastic; 2. The wind is correlated in time; 3 The wind is correlated between the two model regions 30.11.2018

Electricity trade prices Average sub- annual electricity prices Germany (2006 - 2011) Price vary significant with time of day with peaks in the middle of the day and in the afternoon 30.11.2018

Electricity trade prices Average sub- annual electricity prices Norway/ NO2 (2006 - 2011) Norway – The price profile is more flat throughout the day. Higher prices in Winter than Summer - The prices are also stochastic!!! 30.11.2018

Modelling uncertainty Every second hour from historical data is used A scenario consist of 12 chronological two-hour wind availability data for DK-E and DK-W Correlation in time Correlation between model regions A scenario consist of 12 chronological electricity price data for Germany, Norway and Sweden Consistent electricity price and wind data All historical data = computational challenges Select a subset of historical data 1 day = 24 h and 1 model period = 12 daily periods Same period selected for wind and electricity price data - automatic correlation Subset – represent possible future scenarios! 30.11.2018

Scenario generation Model input: Subset of historical data Scenario reduction = solvable model T scenario trees are randomly generated Model input = best scenario tree Least deviation of the four moments between sub-set and the historical data on wind availability Scenario generation stability Stability on number of scenarios/ size of sub-set Sub-set selection, partly random process In-sample stability Out-if sample stability 30.11.2018

Results – model options 30.11.2018

Result 1 – In-sample stability Show ???? 30.11.2018

Result 2 – Electric capacity 2030 30.11.2018

Result 3 – Electric capacity 2050 30.11.2018

Result 4 – Electric trade 2050 30.11.2018

Result 5 – Exp. fuel consump. 2050 30.11.2018

Results 6 – Value of Stochastic solution « Cost of disregarding uncertainty» Fixed investment - Det_30 → Infeasible Fixed investment - Det_0 → More costly solution Stoch 5.0 % Stoch* 7.7 % VSS = (RP – EEV)/ EEV 30.11.2018

Conclusions Competiveness of wind power depend on the method used to model the unpredictable characteristics of wind power Deterministic model approach overestimate competiveness of wind power Deterministic investment decisions Can give infeasible solutions Or give more costly solutions Stochastic modelling of short-term uncertainty gives cost effective investment decisions Proper modelling of unpredictable wind power is essential to model the value of Norwegian hydro power 30.11.2018