P802.11z conditional approval report to ExCom

Slides:



Advertisements
Similar presentations
Doc.: /04 Submission August 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on meeting the terms of Conditional.
Advertisements

Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v report to EC on request for conditional approval to proceed.
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z conditional approval report to ExCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2010
November 2008 doc.: IEEE /1437r1 November 2010
November 2008 doc.: IEEE /1437r1 August 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Editor Report Sept 2008 Date: Authors:
Motion via Ballot IEEE motion Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot.
Motion via Ballot Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot Motion Start: May.
July 2009 Closing Plenary Motions
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2011
P802.11aq Report to EC on approval to forward draft to RevCom
January 2012 doc.: IEEE /0179r1 Jan 2012
P802.11j Sponsor Ballot Procedure 10
Presentation transcript:

P802.11z conditional approval report to ExCom August 2010 doc.: IEEE 802.11-10/0993r2 August 2010 P802.11z conditional approval report to ExCom Date: 2010-08-30 Authors: Name Company Address Phone Email Menzo Wentink Qualcomm Straatweg 66, Breukelen, the Netherlands +31 65 283 6231 mwentink@qualcomm.com Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA 95054 +1 (321) 427-4098 bkraemer@marvell.com This document contains the P802.11z report to ExCom Regarding completion of Clause 14 conditions to submit to RevCom M.M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Introduction This document contains the P802.11z report to ExCom August 2010 doc.: IEEE 802.11-10/0993r2 August 2010 Introduction This document contains the P802.11z report to ExCom Regarding completion of Clause 14 conditions to submit to RevCom M.M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Meeting the terms of conditional approval, as per LMSC OM Clause 14 August 2010 doc.: IEEE 802.11-10/0993r2 August 2010 August 2010 Meeting the terms of conditional approval, as per LMSC OM Clause 14 Recirculation ballot is completed. Generally, the recirculation ballot and resolution should occur in accordance with the schedule presented at the time of conditional approval. The ballot occurred in accordance with the schedule presented to the EC in document 11-10/0993r0. An additional recirculation ballot was held in order to recirculate an approved change that the editor had omitted to implement. After resolution of the recirculation ballot is completed, the approval percentage is at least 75% and there are no new valid DISAPPROVE votes. The approval percentage is 97%. There are no new valid disapprove votes. No technical changes, as determined by the WG Chair, were made as a result of the recirculation ballot. No technical changes were made as a result of the recirculation ballot. No new valid DISAPPROVE comments on new issues that are not resolved to the satisfaction of the submitter from existing DISAPPROVE voters There were no comments received, there are no new disapprove comments. Slide 3 M.M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Meeting the terms of conditional approval - continued August 2010 doc.: IEEE 802.11-10/0993r2 August 2010 August 2010 Meeting the terms of conditional approval - continued If the WG Chair determines that there is a new invalid DISAPPROVE comment or vote, the WG Chair shall promptly provide details to the Sponsor. None The WG Chair shall immediately report the results of the ballot to the Sponsor including: the date the ballot closed, vote tally and comments associated with any remaining disapproves (valid and invalid), the WG responses and the rationale for ruling any vote invalid. The ballot closed on 2010-8-29 The comments associated with remaining disapproves and the WG responses are attached to slide 10. Slide 4 M.M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

IEEE 802 Sponsor Ballot Results – P802.11z August 2010 doc.: IEEE 802.11-10/0993r2 August 2010 IEEE 802 Sponsor Ballot Results – P802.11z Draft Opened Closed Days Ballot Type Pool Approve Disapprove Abstain Return D6.0 2009-10-07 2009-11-06 30 Initial 144 103 87% 15 13% 7 5% 125 86% D7.0 2010-02-12 2010-02-27 Recirc 1 105 16 14% 9 6% 130 90% D8.0 2010-04-19 2010-05-04 Recirc 2 121 93% 8 7% 136 94% D9.0 2010-05-26 2010-06-10 Recirc 3 123 95% 6 D11.0* 2010-07-19 2010-08-04 Recirc 4 137 D12.0 2010-08-06 2010-08-16 10 Recirc 5 124 96% 5 4% D13.0 2010-08-19 2010-08-29 Recirc 6 126 97% 3 3% * D10.0 was not balloted due to an editorial error M.M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Comments by Ballot – P802.11z August 2010 August 2010 doc.: IEEE 802.11-10/0993r2 August 2010 Comments by Ballot – P802.11z Draft Ballot Not Required Satisfied Known Unsatisfied Assumed Unsatisfied Total D6.0 Initial 44 154 1 20 219 D7.0 Recirc 1 12 38 50 D8.0 Recirc 2 5 17 D9.0 Recirc 3 9 3 D11.0* Recirc 4 4 8 D12.0 Recirc 5 D13.0 Recirc 6 81 208 310 *D10.0 was not balloted due to an editorial error M.M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Unsatisfied Comments by Commenter August 2010 doc.: IEEE 802.11-10/0993r2 August 2010 Unsatisfied Comments by Commenter Commenter D6.0 D7.0 D8.0 D9.0 D11.0** D12.0 D13.0 Total R. Roy (SRA) 16* J. Epstein (Interdigital) 4* S. Trainin (Intel) 1 21 *Assumed unsatisfied, no response to repeated e-mails to commenter **D10.0 was not balloted due to an editorial error M.M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Mandatory coordination June 2009 August 2010 doc.: IEEE 802.11-09/0674r0 doc.: IEEE 802.11-10/0993r2 August 2010 Mandatory coordination Coordination Entity Draft Date Status IEEE-SA Editorial (MEC) D6.0 July 09 “Meets all editorial requirements. “ Quantities, Units and Letter Symbols (SCC14) Not required Terms and Definitions (SCC10) Registration Authority Committee (RAC) M.M. Wentink (Qualcomm), B.Kraemer (Marvell) Page 8 Bruce Kraemer, Marvell Bruce Kraemer, Marvell; Adrian Stephens, Intel

Unsatisfied Comments – Topics August 2010 doc.: IEEE 802.11-10/0993r2 August 2010 Unsatisfied Comments – Topics Topic #Comments Editorial 12 Off-channel 4 Frame routing Encapsulation 1 Total 21 M.M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

August 2010 doc.: IEEE 802.11-10/0993r2 August 2010 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the ballot resolution committee during sponsor ballot is attached. Double click on the icon to the right to open this. A copy of the unsatisfied comments presented using MyBallot access database report format is attached. M.M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

TGz Timeline 6th Recirculation Sponsor Ballot Opened 2010-08-19 Closed August 2010 July 2010 doc.: IEEE 802.11-10/0872r1 doc.: IEEE 802.11-10/0993r2 August 2010 TGz Timeline 6th Recirculation Sponsor Ballot Opened 2010-08-19 Closed 2010-08-29 RevCom Submission* Revised RevCom submission** * The RevCom submission occured while the 6th recirculation sponsor ballot was in progress, in accordance with RevCom policy section 6. ** The revised RevCom submission has been submitted at least 25 days prior to the SB meeting, in accordance with RevCom policy section 6. M.M. Wentink (Qualcomm), B.Kraemer (Marvell) Page 11 Bruce Kraemer, Marvell Stephen McCann, RIM

Key August 2010 June 2009 August 2010 doc.: IEEE 802.11-09/0674r0 Coordination: comment supplied by a Mandatory coordination entity Not Required: comment indicated as not required to satisfy voter Satisfied: comment required to satisfy voter that is indicated as satisfied either by the voter indicating satisfaction with the specific comment, or by voting yes in a subsequent ballot Known Unsatisfied: a comment that is indicated to be “required” by the voter, and the voter is maintaining a “no” vote, and the voter has indicated they are unsatisfied with the comment resolution. Assumed Unsatisfied: comment not meeting any of the above criteria – i.e., a comment that is indicated to be “required” by the voter, and the voter is maintaining a “no” vote, and the voter has not responded when asked about their satisfaction with the comment resolution. M.M. Wentink (Qualcomm), B.Kraemer (Marvell) Page 12 Bruce Kraemer, Marvell Bruce Kraemer, Marvell; Adrian Stephens, Intel