API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.

Slides:



Advertisements
Similar presentations
Balloting/Handling Negative Votes. General Overview of Different Levels of Balloting Subcommittee New Standards Major Revisions Provisional Standards.
Advertisements

Meeting Agenda Preparation and Negative Resolution Scott Orthey.
NACE Direct Assessment Standards Office of Pipeline Safety (OPS) Public Meeting November 4, 2003.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
MEMBERS’ INFORMATION SESSION McMaster Association of Part-time Students May 12 7pmMUSC 234& via WebEx Presentation Electronic Referendum May 13-16,
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
API Subcommittee 17 Industry Standards for Subsea Equipment
Letter of intent By to predefined format (Word file, see guidelines) Chair Scientific Committee Coordination EO To all members of.
1 David Miller, PE, F.ASCE Director, Standards API ECS Reorganization Update.
API 17V By Christopher Curran January 2013 API 17V – Subsea Safety API Winter 2013.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
Yong-Yi Wang, Chair API 1104 Committee Meeting Washington, DC June 30, 2010 Report of Fracture Mechanics Subcommittee.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Copyright © 2011 Deloitte Development LLC. All rights reserved. 0Footer Weekly Update: 11/14 Total Negatives (606) Negatives Resolved (127) Minor (65)
San Francisco, CA. SC8 Liaison Report
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
SAB Secretary Report Debbie Brown February 3, 2016 Standards Activities Board.
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
API 17X Subsea Boosting January 13, 2015
TG Chair: Mark Brinsden Shell
API SC 10, Work Group 3 Update:
Task Group 19LH Liner Hanger Equipment
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
TG Chair: Darrin Willauer Baker Hughes
Accredited Standards Committee C63® - EMC
drainage lymphatique - 6Sense
IEEE 802 JTC1 Standing Committee July 2017 (Berlin) closing report
API RP 17A - Discussion Points
Research Participant Satisfaction
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
API 16F June 2017 Specification for Marine Drilling Riser Equipment
Status Update on API 16Q / 16R / 16F
Please check below to let us know whether you would like to participate in this project. Yes, see my contact info below No, thank you Name (s): ____________________________________.
API 17X Subsea Boosting August 27, 2015
Specification on float equipment
International Subsea Standardization
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
First 8 slides are what was presented in San Fransisco…
March 2002 November 2002 SEC Overview of WG Proposal to Amend a to address Japanese bands and rules PAR and 5 criteria Bruce Kraemer, Intersil.
API SC-16 task group for Specification 16D
API SC 10, Work Group 3 Update:
API 17H TASK GROUP January 15, 2013.
2016 Exploration & Production Summer Standards Conference
Standards Break Out Session
July 2010 doc.: IEEE /0xxxr0 IEEE 802 JTC1 Standing Committee September 2017 (Hawaii) closing report 14 September 2017 Authors: Name Company Phone.
API Standard 53 Update June 2017
TGs LA Closing Report Date: Author: January 2011
Specification on float equipment
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
Discussion Points API RP 17A Task Group Members
2nd Edition: 2019 Winter Standards Meeting
TGp Closing Report Date: Author: September 2007 Month Year
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
IEEE P Wireless Personal Area Network
IEEE ac – May 2013 First Sponsor ballot closed on May 5, 2013.
Emulsion Task Force (ETF) Meeting
Task Group Status January 2013
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
API RP 16AS January 2019 Standard for BOP Systems
Accredited Standards Committee C63® - EMC
API 17P TASK GROUP June 26, 2013.
Presentation transcript:

  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment January 2014-Report

Report The status of the RP 17U is as follows: Work group participation in initial preparation of RP– Concluded RP circulated for balloting- concluded Formatting changes , addressing SC 17 group comments –Concluded Reconciliation of negative votes- in process We have contacted via Email SC 17 group member that gave negative votes (2) addressing their queries and waiting for their for their responses.

Thank you