David Salazar, Chief Facilities Executive

Slides:



Advertisements
Similar presentations
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
Building for tomorrows leaders Place Campus logo here 11/08/13 – R8 [year] Facilities Master Plan Update [College Name Here] 201X Draft Facilities Master.
Hubbard County, Minn. Classification and Compensation Study Update GREG MANGOLD| AUGUST 5, 2014.
Bond Program Planning Imperatives Study Session October 12, 2004.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District August 8, 2011 EDUCATE  ENGAGE  EMPOWER 1.
St. Joseph’s (Thamesford) Accommodation Review Committee Public Meeting St. Joseph’s Catholic Elementary School April 30, 2013.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 25, 2012 EDUCATE  ENGAGE  EMPOWER 1.
1 Agenda District Board of Church Location and Building Meeting Objective To bring District up to date with renovation of Annex (complete) To receive constructive.
Lutheran Church of the Good Shepherd Building Committee Update May 2014.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
1 David Saenz 1 Hutch Construction in FEH June 08, 2009 Hutch Construction in Far Experimental Hall David Saenz – Project Manager.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
Delivery Methodology.
Project Management – The Project Charter
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
Capital Project Process
Health Planning Council Meeting 4 Madeleine Biondolillo, MD Director, Bureau of Health Care Safety and Quality Department of Public Health August 27, 2013.
G ROW GLOBE ! CONCEPTUAL PLANNING AND DESIGN UPDATED MAY 4, 2014 PTCC MASTER PLANNING PAC.
Building for tomorrow’s leaders Los Angeles Community College District Program Management Office Master Planning and FMP&OC Policy and Procedures Sample.
Preparing the Bid Package (A Developers Perspective)
Bond Construction Update Citizens Oversight Committee Long Beach Community College District October 24, 2011 EDUCATE  ENGAGE  EMPOWER 1.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District July 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
ESPLOST Update Savannah-Chatham County Public Schools January 9, 2008.
Construction Management At Risk Process
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
Capital Facilities Program Update San Rafael City Schools 10 May 2016.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
DAVIS SR. HIGH SCHOOL ALL-STUDENT CENTER (MULTIPURPOSE BUILDING) PROGRAMMING OPTIONS August 6, 2015.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education August 4, 2014 Stakeholder Engagement and Communications Services.
PROPOSED STRATEGIC PLANNING PROCESS DECEMBER 3, 2014 Port of Port Angeles.
Agenda Item #10 Revised Process for State Expenditure Plan and Approval of Next Steps Doug Robison, PWS Gulf Consortium Meeting April 21, 2016 Hillsborough.
June 13, 2016 Doug Grout, Housing and Redevelopment Authority Kate Fogarty, Fourth Judicial District Court Michael Noonan, Hennepin County Real Estate.
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | Murch.
Rob Connatser NSS Instrument Work Packages and XLPM.
ASHLAND TOWN HALL May 10, Ashland Town Hall  Dedicated April 12, 1955  Plan for the next 50+ years  Strategic Plan:  Initiative – Develop.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
Capital Facilities Program Update San Rafael City Schools August 8, 2016.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 28,
Mt. San Jacinto Community College District Five Year Construction Plan
Presentation Overview
Camera PDR/CD1 Planning 19 September 2008
LNBA Subgroup: Avoided Transmission Value
SONOMA COUNTY JUNIOR COLLEGE DISTRICT Measure H update for the Governing Board April 11, 2017.
Cottonwood Recycled Water Pipeline (West)
Capital Facilities Program Update San Rafael City Schools
Campus Master Plan.
Pre-Construction Services
Capital Facilities Program Update San Rafael City Schools
City-wide LED Street Light Conversion Program
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
How to Build a Great Team
BOND PROGRAM- Door Lock & Building Access
College of Alameda Integrated Planning and Budgeting Process
Long Range Facilities Plan
Board of Regents Capital Projects Review & Approval Process
DBIA Manual of Practice
M E A S U R E ‘G’ P R O G R A M U P D A T E
CONVENTIONAL FACILITIES LCLS Office Space Procurement
Measure – V Facilities Update April 8th, 2019
North Augusta High School – Phase 2A and 2B
Capital Facilities Program Update San Rafael City Schools
Central Valley Water Board Meeting of 29 March 2012
The Database Development Process
Presentation transcript:

David Salazar, Chief Facilities Executive SPACE ANALYSIS & PRE-PROGRAMMING MEASURE CC IMPLEMENTATION District Citizens’ Oversight Committee David Salazar, Chief Facilities Executive Rob’s Slide June 8, 2018

SPACE ANALYSIS & PRE-PROGRAMMING AGENDA Benefits of Space Analysis and Pre-Programming Project Development Process Space Analysis Deliverables Pre-Programming Deliverables Resource Plan Timeline Rob’s Slide

BENEFITS OF SPACE ANALYSIS & PRE-PROGRAMMING Justifies Space Requests & Requirements Identifies Square Footage Surplus Facilitates Updates to Facilities Master Plans/EIRs Supports Sequencing & Phasing Plans REFINES PROJECT JUSTIFICATION BASED ON NEED Rob hand off to David

PROJECT DEVELOPMENT PROCESS PROJECT INITIATION REQUEST Preliminary Scope Preliminary Estimate Approvals SPACE ANALYSIS & PRE-PROGRAMMING Space Utilization Planning Phasing Revised Project Scope Revised Estimate PROGRAMMING & CRITERIA DOCUMENTS BASELINE BUDGET & BID PACKAGE DEVELOPMENT BID & AWARD (Request for Qualifications/Request for Proposals) PROJECT EXECUTION 1 2 3 4 5

SPACE ANALYSIS DELIVERABLES Evaluates: 5-Year Construction Plans Enrollment Projections (FTES) Capacity Load Ratios Class Scheduling vs Capacity Deliverables: Forecasted Enrollment Availability of Existing Space Options for Consolidation Defines Building Size Based on Need

PRE-PROGRAMMING DELIVERABLES Evaluates: Space Analysis Data Building Siting Scenarios Swing Space Needs Phasing and Sequencing Demolition Options Deliverables: Conceptual Drawings Site Analysis Conceptual Building Plans and Elevations Revised Cost Estimates Information to Support Facility Master Plans

RESOURCE PLAN Program Management Office and Consultants Coordination and Management – Doug Graham, PMO Space Analysis – ALMA Strategies Pre-Programming Architectural Services Consultants Region 1 - EAST, CITY, WEST - STIR Architects Region 2 - TRADE, SOUTHWEST, HARBOR - Steinberg/Hart Region 3 - MISSION, VALLEY, PIERCE - West Edge Architects

TIMELINE – SPACE ANALYSIS & PRE-PROGRAMMING April-June 2018: Space Analyses & Pre-Programming Stakeholder Meetings June-July 2018: Findings & Recommendations Development of Conceptual Plans July-August 2018: Final Reports FPP Submittals

QUESTIONS Rob & David