Nonconformance Tracking

Slides:



Advertisements
Similar presentations
Quality Assurance U. S. ITER Project Office U.S. ITER Project 1 November 15, 2006 U. S. ITER QUALITY ASSURANCE Gail Okulczyk, Presenter U. S. ITER Quality.
Advertisements

“The Honeywell Web-based Corrective Action Solution”
CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
IQA Implementation As-Is Status May, 2009 Jed Heyes.
Quality Management System
ISO 9000 Certification ISO 9001 and ISO
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
Computer Literacy BASICS: A Comprehensive Guide to IC 3, 5 th Edition Lesson 14 Sharing Documents 1 Morrison / Wells / Ruffolo.
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
1 Permits, Licenses and Inspections Regional Project Introductions: Home Builders & Remodelers Association of Cape Cod State Project Sponsor & Technical.
Press the F5 key to continue Project Manager is a web based Project Management Tool. All your work is done and information stored on the internet cloud.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
LHC Quality Assurance Working Group - M. Mottier September 2000.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
MTF - Travellers 28/2/2001 S. Mallon + P. Martel EDMS Doc Id Contents Problem and scope Timing of MTF usage Definition of a standard MTF Creation.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
WebAuditor Training Kit. Introduction-WebAuditor  Process Automation tool for automating all internal quality audit activities.  Web based tool with.
1 Lesson 14 Sharing Documents Computer Literacy BASICS: A Comprehensive Guide to IC 3, 4 th Edition Morrison / Wells.
DHHS COE Meeting Agenda November 14, 2012 Welcome Introductions Contract Compliance Reporting Questions and Answers DIRM Vendor Management.
Review of the processes released in the framework of the MMP Goran Perinić.
Non-Conformities: The Weakest Link TDI-Brooks International Sep 2014.
Quality Assurance for LHC Gas Systems Stefan Haider / EP-TA1.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
Chapter 25 – Configuration Management 1Chapter 25 Configuration management.
Compliance Management System. Intelex System Overview Focus Modules: –Permits Management –Monitoring & Measurement –Training Management –Document Control.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Corporate Presentation
Software Application Overview
Module 6 Corrective Action Request (CAR) Overview
Legal requirements and contractual duties
Teacher: Alison Roberts Northern Sydney Institute of TAFE
Global Grid Forum GridForge
ELECTRONIC PROPOSAL SUBMISSION SYSTEM
Basic Web-based Emissions Inventory Reporting (Web-EI)
ISO 9000.
Lesson 9 Sharing Documents
Need for ISO 9000 & other Q Systems Swamynathan.S.M AP/ECE/SNSCT
Lesson 9 Sharing Documents
Reliance Supplier Corrective Action Process
Staff Training Travel Authorization electronic approvals
Quality Management Systems – Requirements
ISO 9001 Awareness Training.
Lesson 14 Sharing Documents
Agenda Review homework Final Exam requirments ISO 9000 Baldridge
Engineering Processes
Release Highlights Last Updated for September Monthly Release.
DOCUMENT AUTHORITY CONTROL
GLAST Large Area Telescope:
Carrier Qualifications & On-Boarding
Reliance Supplier Corrective Action Process
UNDERSTANDING FOR STANDARD
GLAST Large Area Telescope:
Order Processing and Requisition Accelerator
Audit Findings Process
Lesson 14 Sharing Documents
E. Manola-Poggioli 05 December 2001 EDMS doc
Supplier Nonconforming Material Report (SNCR) Process
AS 9100 Awareness Training.
QA Reviews Lecture # 6.
ENTERGY SERVICES, INC. February 23, 2006
ESSI CHANGE AND nonconformity control SYSTEM
QMS Deployment Kickoff Meeting
DOE Review of the LCLS Project October 2006
Understanding the Process of Documenting Informed Consent
HRb SG Status and Information
Diversity management system (DMS)
Quality Systems ISO 9000 Series QS-9000 TE-9000 AS9000
Presentation transcript:

Nonconformance Tracking LHC Quality Assurance Working Group - M. Mottier September 2000

Objectives To provide an on-line system to report, analyze,and correct non conformities as required by ISO 9001 and the LHC Quality Assurance Plan: To enable the reporting of non conformities, on-site and off-site, detected in production, assembly and installation. To provide a comprehensive view of the state of non conformities at part level, equipment level, and project level. To provide for searching, reporting and statistical analysis. LHC Quality Assurance Working Group - M. Mottier September 2000

Method Use the EDMS and its web interface. Use a document, the nonconformance report. Use a specific document type, QN. The nonconformance report (NCR) is used to document the history from detection to implementation of the solution. The document status is used to display the main steps in the nonconformance evolution LHC Quality Assurance Working Group - M. Mottier September 2000

Completes first part of NCR Stores NCR in EDMS NC Status Initiates NC process Completes first part of NCR Stores NCR in EDMS OPEN (IN WORK) Inspector There is a problem Waiting for a solution Makes analysis Proposes solution, including corrective action Production Manager UNDER APPROVAL There is a problem Solution found Waiting for approval Project Engineer Project Management Verifies and Approves solution ACCEPTED (RELEASED) There is a problem Solution approved Correction in-progress Implements solution Production Manager CLOSED (OBSOLETE) Production Manager Project Engineer Implementation complete Stops NC process There was a problem It has been corrected LHC Quality Assurance Working Group - M. Mottier September 2000

NC process step by step Inspector (on production site) Discovers a non-conformity. Completes the IDENTIFICATION part of the NCR. Stores the NCR in EDMS (status OPEN). Production Manager (on production site) Makes analyses and proposes a solution. Updates NCR, point 13, possibly point 16. Changes NCR status to UNDER APPROVAL. Project Engineer/Project Management (at CERN) Verifies and approves or rejects the proposed solution. Decides whether management approval is required. Finally changes status to ACCEPTED or REJECTED. Production Manager (and PE if necessary) Implements the solution. Changes status to CLOSED when complete. LHC Quality Assurance Working Group - M. Mottier September 2000

Confidentiality Inspector and Production Manager Project Engineer May only see NC’s related to their contract Project Engineer May see NC’s related to all his contracts and to all related equipment Project Management May see all NC’s related to the project LHC Quality Assurance Working Group - M. Mottier September 2000

Web interface Specific form to store and search for NC’s: To clearly segregate NC’s, as processes, from documents. To display NC status and hide the NCR document status. To automatically assign the doc type. Pre-defined search as for ECR’s Search by status, like ECRs. LHC Quality Assurance Working Group - M. Mottier September 2000

Production sites without Internet (1) Inspector: Fills points 1 to 12 of the form and sends it to Production Manager Production Manager: Fills point 13 of the form and faxes to PE at CERN PE (or secretary) Completes point 14 or 15 of the form and faxes it to Production Manager Creates an empty (no file attached) NC Report Changes the status of NC to IN-PROGRESS When Implementation is completed: Scans the completed form and stores it in EDMS Change status to CLOSED Contractors must have a Web access! LHC Quality Assurance Working Group - M. Mottier September 2000

Production sites without Internet (2) In cases where it has been demonstrated that communication via the web is not possible: Use the nonconformance report as a paper document. Communicate via telephone, fax and mail. Scan and store the nonconformance report when the nonconformance has been resolved, with the status OBSOLETE. LHC Quality Assurance Working Group - M. Mottier September 2000

LHC-PM-QA-509.00 LHC Quality Assurance Working Group - M. Mottier September 2000