City Connect 2 LEEDS CITY CENTRE IMPROVEMENT JOHN WHITE – PROJECT LEAD

Slides:



Advertisements
Similar presentations
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Advertisements

Limerick City Green Routes Corridor Selection Study Presentation to Limerick City Council 14 th February 2008.
CityCo, Piccadilly Hoteliers Forum
1 Camden Cycling Campaign, February 2014 Clerkenwell Boulevard Bloomsbury Way -Theobalds Road - Clerkenwell Road - Old Street roundabout for Camden officers.
London's superhighways and the 'Go Dutch' Campaign Gerhard Weiss Cycling Development Officer London Cycling Campaign Over 11,500 paid up members About.
Mainstreaming Cycling for All Nick Vaughan Transport for Greater Manchester Eleanor Roaf Sustrans Local Sustainable Transport Fund National Conference.
Phil Noble Senior Professional Officer Strategic Planning (Transport) 20 August 2012 Active Travel Action Plan Briefing.
West London Transit – One Track Mind or Broad Vision?
Walking and cycling routes Local facilities Streets Open space Public transport Supporting infrastructure Creating ‘commons’ Local planning.
Measure 26 Strategic Traffic Management Katerina Oktabcova Usti nad Labem Municipality.
Cycle Skills Network Audit Mark Strong Managing Consultant Transport Initiatives LLP 145 Islingword Road Brighton BN2 9SH
Nottingham’s Cycling Action Plan to 2015 Keith Morgan Transport Strategy Nottingham City Council.
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
The Bikers Convention By David Wilson Maintenance Officer.
Roads & Traffic Department College Green Public Transport Priority measure.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Scrutiny Presentation Local Transport Plan and Active Travel Strategy 24 th October 2013 Andy Summers and David Burt.
21st October 2015 Stillorgan Village Area Movement Framework Plan PUBLIC CONSULTATION INFORMATION PERIOD DOCUMENT.
Fostering Mobility in a Compact City – Hong Kong’s Experience Professor Anthony B.L. Cheung Secretary for Transport and Housing Hong Kong, China.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
SOUTH TYNESIDE INTEGRATED TRANSPORT STRATEGY Presentation to Riverside Community Area Forum, 7 th February 2008 Transport Futures.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
Raumati Road Corridor Consultation and Corridor Assessment
Existing MOVA Control Existing Layout Operational Issues Including: Controlling each junction approach ‘in turn’ can result in long ‘wait times’ for both.
Intelligent Transportation System
East Sussex Strategic Partnership Transport Update 25 April 2017
West of England Joint Transport Study
Implementing SAFE Junctions for walkers and cyclists
LLEP Local Growth Fund Theory of Change
Peckham & Nunhead Community Council: Important Issues For Pedestrians
Dartmouth Road Public Realm Enhancements – Preliminary Design
Bristol’s 20 mph experience Peter Mann Service Director, Transport
Milton Road LLF Design Engagement Paul van de Bulk 12 September 2017.
Creating a successful bikeshare scheme in the West Midlands Transport for West Midlands Emma Beech (Cycling Development Officer)
Traffic safety for cyclists and pedestrians
Strategic Transport Forum Friday 15th September 2017
Cambourne to Cambridge Better Bus Journeys
Delivering transport and growth
Sources of Road Danger and a Vision Zero approach
TAITH NORTH WALES REGIONAL TRANSPORT STRATEGY
Milton Road – Bus Stop and Crossings Workshop WSP
Cycling in Edinburgh – 2016 Current position and potential
Western Orbital Local Liaison Forum 11TH September 2017.
Leeds Social Value Charter
Streets for Everyone: The Enjoy Waltham Forest Programme Mark Bland – Programme Manager LB Waltham Forest.
A New Vision for Camberwell
JMP EDA Transport Study South Marston Samantha Howell Principal Transport Planner Strategic Growth and Regeneration Team.
Fishermans Bend Draft Framework Transport Recommendations
Cambourne to Cambridge Better Bus Journeys East of M11 Workshop Summary 13 November 2018.
Midblock Crossings Lesson 12 Publication No. FHWA-HRT
Eliminating Left & Right Secondary X-roads where only 2 lanes possible without delaying traffic , nor cycles , nor pedestrians LCC July’15.
Better mobility for older people
City of Wilmington Bike Plan Update
Developing a Pedestrian -Bicycle Safety Action Plan
Hazard Awareness and Vulnerable Road Users
Road Infrastructure Design for Older Road Users
Delivering a World Class Heartland:
Designated Funds: Helping to Transform Roads
The road user perspective
KEYNOTE STAGE SPONSOR.
HE Designated Funds Cycling Safety and integration (CSI)
Glossary of regularly used cycling terms
3 November 2017 Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: STAG Part 1 Plus Bob Nicol: Project Director David Murtagh: Project Manager.
Manchester airport transport FORUM
Cambourne to Cambridge Better Bus Journeys: On Road Option
Western Orbital: M11 J11 Park and Ride Provision
TRAFFIC AND ROAD SAFETY
Histon Road LLF Resolutions and Programme
Road Safety Talk.
Presentation transcript:

City Connect 2 LEEDS CITY CENTRE IMPROVEMENT JOHN WHITE – PROJECT LEAD

CC1 DESIGN APPROACH 1 Segregated cycle track and junctions similar to matched in quality to best practice standard in Europe 2 Maximising safety at side roads 3 Maximising safety and priority at signalised junction while reducing delays 4 Minimising conflict points, with all other users 5 Optimising impact on future maintenance 6 Connecting the main route to local networks and key attractors 7 Integrate with proposals along the corridor, especially for city centres

CIty Connect 2 LEEDS CITY CENTRE objectives The overall CityConnect2 programme aim is for more people to cycle more often The objectives are as follows; To increase walking and cycling so that it becomes part of residents healthy living plan To make cycling a natural and popular choice for short journeys To make cycling accessible to all low income and vulnerable groups Improve access to employment, skills and training Reduce CO2 and improve local air quality Create a safe environment for active modes

CC2 - objectives Types of Users

Design Philosophy Provide high quality segregated cycle links into Leeds city centre, from CS1 and CS2 from the south of the City, links to the Education Quarter, and a ‘City Cycle Loop’ around the City centre. Signed routes on quiet streets to provide additional connectivity; Increased cycle permeability at key junctions into the City centre; Potential for extending existing cycle use within pedestrian areas to ensure end to end journeys, Manage cycle/pedestrian interactions through innovative design, Retain and where possible improve pedestrian crossing facilities.

Design Philosophy Maximising opportunities with other planned schemes, To deliver elements of the scheme and complimentary measures. Also exploring wider City ambitions to downgrade routes in the City centre, to identify possible opportunities to provide a step change in cycle facilities. CC2 scheme in Leeds can be seen as a catalyst for wider change along the corridors it will be provided on.

DESIGN ISSUES Pedestrian crossings of cycleway Experience from London suggests these work Strong support from Cycle Forum and Access & Usability group ‘Hinted Zebra’ for locations where pedestrian volumes are the right order

Baldwin Street - Bristol

DESIGN ISSUES Bus Stop By-passes Acute tapers/transitions Narrow widths for all users Potential conflicts between users Poor visibility round shelter particularly for alighting bus passengers. AECOM POWERPOINT TEMPLATE FOOTER

DESIGN ISSUES New detail developed Option for shared use bus boarder arrangement at quiet stops

DESIGN ISSUES Two-way cycleway (Bi-directional) Opportunities Challenges Where buildings, active uses and side roads are entirely or largely on only one side (a waterside location, for example). Where kerbside activity or side road access may be reconfigured so as to take place largely on one side. Arterial roads such as wide dual carriageways with infrequent crossings. One-way systems and gyratories. Can be unintuitive and generate risks associated with motorists and pedestrians not looking both ways when crossing a track. Complex arrangements at junctions and side roads, often with some confusion about priorities. Complex transitions from one-way, with-flow to two-way cycle provision. Connectivity for cyclists to and from the track can be difficult to manage Need for substantial signal control, for the above reasons.  

DESIGN ISSUES Two-way cycleway – Two stage right and left turn

BEST PRACTICE National Guidance – (LTN 2/08) Specific Guidance – (LCDS) Cycle Cities Ambition Group – Regular meetings Designer visits – LCC Visit to TfL