Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Capstone Design Mechanical, Industrial, and Manufacturing Engineering.

Slides:



Advertisements
Similar presentations
Summer Internship Program Outline
Advertisements

The Re-Start Meeting Warren County School Strategic Planning Process Action Team Leaders September 25, 2013.
Dr. Parmigiani, This is Will Rogers. I had a couple of your classes most recently senior design (Autonomous Underwater Vehicle). The company I'm working.
MIME Capstone Design Remaining Course Deliverables
Computing & Software Systems
ECE 4334: Capstone Design Fall 2009 Welcome ! Facilitator: Dr. Len Trombetta.
Introduction CSCI102 - Systems ITCS905 - Systems MCS Systems.
Writing an Effective Proposal for Innovations in Teaching Grant
HIT241 - Project Scope Management Introduction
ME 4054W Design Projects Spring Semester 2010 Course Logistics Prof. Brad Bohlmann January 19, 2010 U NIVERSITY OF M INNESOTA.
Presentations 118 March, 2003 Project Team Presentations.
Assessing Student Learning in EPICS
Introduction IACT 924 Corporate Network Design and Implementation.
ME 4054 Advisor Meeting September 4, 2008 Prof. Thomas R. Chase Mechanical Engineering University of Minnesota.
Bus 411 DAY 15. Agenda Assignment #4 Corrected  4 A’s, 1 B, 1 C and 2 Non-submits Templates available in WebCT Mid-term Sent in WebCT  Handed out Mar.
Evaluating and Revising the Physical Education Instructional Program.
Adjusting EPLC to your Project Colleen Robinson & Teresa Kinley Friday, February 6, 2009.
COMP4710 Senior Design Richard Chapman. Outline What is Senior Design? What is Senior Design? Course Structure Course Structure End of Cycle Binder End.
1 Major changes Get ready! Changes coming to Review Meetings Considering Potential FY2010 funding and beyond: New 1-9 Scoring System Scoring of Individual.
Advanced Project Management Project Plan Templates
Chapter 4 Designing Significant Learning Experiences II: Shaping the Experience.
Project Management Phases Class 6. Initiation & Planning – Agenda Overview of the project management phases Midterm paper details.
UNIT 1 SEMINAR CM107 INSTRUCTOR: Carol A. Smith, RN, BSN, MA.
INFO 330 Class Project Do it for real. Overview of the Class Project Scope – Approximately the same as the sample project – Standard starting place Marketing.
Chemistry B.S. Degree Program Assessment Plan Dr. Glenn Cunningham Professor and Chair University of Central Florida April 21, 2004.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Open minds. Open doors. TM Capstone Design Mechanical, Industrial, and Manufacturing Engineering.
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
IENG 471 Facilities Planning
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
Overview of ME 195 SENIOR DESIGN PROJECTS 2009/2010 San Jose State University Department of Mechanical and Aerospace Engineering Instructors: Section 1:
Preparing for the Launch Mohammed El- Affendi. Launch Major Tasks  The Launch is performed according to script “LAU1”, table 3.1 in the book (page 39),
10/10/2015 IENG 471 Facilities Planning 1 IENG Lecture END Project Report Requirements & Project Presentation Information.
InTeGrate Assessment David Steer, University of Akron Ellen Iverson, Carleton College May 2012.
Design Project Experience: Goals n The goal is to provide our students with a significant design experience which incorporates several technical subject.
Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Capstone Design Mechanical, Industrial, and Manufacturing Engineering.
Electrical and Computer Engineering Senior Design John Peeples, Ph. D., P.E. Professor and Department Head.
1 Welcome to Senior Design 4106 Fall 2005 Section B: Dr. Marc Goetschalckx Dr. Spyros Reveliotis Webpage: Acknowledgement:
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
".... good news...we were actually able to deploy the Seeker on a real life mission we had on Tuesday. This mission was a search warrant for armed robbery.
Global Textiles and Apparel Industries MDSE 4010 Instructor: Tatyana Grant Contact:Blackboard Message – I check these messages daily Last minute emergencies.
Global Textiles and Apparel Industries MDSE 4010 Spring 2014 Instructor: Lauren Vasquez Virtual Office Hours:Monday, Wednesday,
CEN 4010 First Lecture January 9, 2006 CEN 4010 Introduction to Software Engineering Spring 2006 Instructor: Masoud Sadjadi
Student Growth Measures in Teacher Evaluation Using Data to Inform Growth Targets and Submitting Your SLO 1.
Establishing an Assessment Process for a Computing Program Cheryl Aasheim, Georgia Southern University Art Gowan, Georgia Southern University Han Reichgelt,
Dr. Parmigiani, I thought I'd send you a message and let you know where I've ended up since college… … As you may recall I took senior project from you.
NEW SOUTH WALES TECHNICAL AND FURTHER EDUCATION COMMISSION 17136Q Marketing simulation SYLLABUS 5-Jan-2009.
Grading Guidelines for Secondary Schools
Agenda: 1/2 Welcome back Final project overview and schedule – Clarification & questions Restriction analysis challenge Samples – gene cloning Homework:
Fair and Appropriate Grading
Chair of Software Engineering Exercise Session 6: V & V Software Engineering Prof. Dr. Bertrand Meyer March–June 2007.
Fall 2015 ECEn 490 Lecture #8 1 Effective Presentations How to communicate effectively with your audience.
Workshop #1: Introduction to Graduation Project Wednesday September 2 nd at 10 am Capstone Committee Department of Computer Science.
Changes is NIH Review Process and Grant Application Forms Shirley M. Moore Professor of Nursing and Associate Dean for Research Frances Payne Bolton School.
Facilitators: Dr. Wanda Zagozdzon-Wosik Dr. Dr. Jung-Uk Lim ECE 4336: CAPSTONE DESIGN II.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
Open minds. Open doors. TM Capstone Design Mechanical, Industrial, and Manufacturing Engineering.
Marquette University Jay R. Goldberg, PhD, PE Forum on Innovation and Entrepreneurship in Biomedical Engineering Education.
BTEC IT Unit 01 Whole Unit Guidance Mr C Johnston ICT Teacher
Chapter 3: The Project Management Process Groups: A Case Study Information Technology Project Management, Fourth Edition Project Execution & Closing Thursday,
Open minds. Open doors. TM Senior Project Mechanical, Industrial, and Manufacturing Engineering.
REMINDER: If you haven’t yet passed the Gateway Quiz, make sure you take it this week! (You can find more practice quizzes online in the Gateway Info menu.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Lab Day – Controller Lab 1 Brief Follow-up from Wednesday Grading.
Welcome... Hello Class, I want to remind you that I am here to assist you with any questions or concerns you have about the class. Feel free to contact.
Course Overview Stephen M. Thebaut, Ph.D. University of Florida Software Engineering.
Introduction to Student Achievement Objectives
Capstone Presentation Title (Template)
Brainstorming & Project Management
Presentation transcript:

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Capstone Design Mechanical, Industrial, and Manufacturing Engineering IE/ME 498

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering MIME Capstone Design Welcome Back Traylor Brothers Inc. Break Course Schedule (Parmigiani) Petition Process Review Team Charter Review Mid-Course Writing Goals Status Meetings

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Course Overview The Design Process Successful completion of design projects follow a well-established procedure. Details vary, but the fundamental process is as follows: 1. Identify customer needs. 2. Perform background research / benchmarking. 3. Generate project goals and performance specs. 4. Generate a list of potential solutions. 5. Analyze these solutions and select the most viable. 6. Complete a detailed design. 7. Implement and test the design. To help you succeed and to allow better evaluation of your work, we use this procedure as the MIME Capstone Design template. Your course grades for fall and winter are based on 1. How well the design process is followed 2. How well the design meets requirements

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Status Meetings (1-6) One-on-one meetings between team and instructor Focus on progress on specific steps of the design process and specific course deliverables Held during normal class-meeting time * Not all course deliverables and meetings are shown, see syllabus Eval. 2 & Final Rep. Teams, Projects Oral Rep.2 Final Prop. Fall Term (ME / IE 497) RESEARCH & DESIGN F Eval. 1 Winter Term (ME / IE 498) IMPLEMENT & TEST F Status Mtg.2 Prelim. Prop. Final Pres. Oral Rep.3 Status Mtg.1 Status Mtg.3 Back.. Rep. Oral Rep.1 Status Mtg.4 Status Mtg.6 Status Mtg.5 Course Overview Course Structure

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Evaluation 1 Team meeting with instructor (time and location TBD with instructor) Team meeting with instructor (time and location TBD with instructor) Scored based on extent to which the initial implementation (build) is complete and ready to test. Given the time, should be able to run test in instructors presence. Scored based on extent to which the initial implementation (build) is complete and ready to test. Given the time, should be able to run test in instructors presence. Evaluated by Instructor for team grade 25% of winter term grade Not all course deliverables and meetings are shown, see syllabus Eval. 2 & Final Rep. Teams, Projects Oral Rep.2 Final Prop. Fall Term (ME / IE 497) RESEARCH & DESIGN F Eval. 1 Winter Term (ME / IE 498) IMPLEMENT & TEST F Status Mtg.2 Prelim. Prop. Final Pres. Oral Rep.3 Status Mtg.1 Status Mtg.3 Back.. Rep. Oral Rep.1 Status Mtg.4 Status Mtg.6 Status Mtg.5 Course Overview Course Structure

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Final Presentation Team presentation. Content Entire project experience Suitable for general audience min. presentation Graded by instructor and peers Not all course deliverables and meetings are shown, see syllabus Eval. 2 & Final Rep. Teams, Projects Oral Rep.2 Final Prop. Fall Term (ME / IE 497) RESEARCH & DESIGN F Eval. 1 Winter Term (ME / IE 498) IMPLEMENT & TEST F Status Mtg.2 Prelim. Prop. Final Pres. Oral Rep.3 Status Mtg.1 Status Mtg.3 Back.. Rep. Oral Rep.1 Status Mtg.4 Status Mtg.6 Status Mtg.5 Course Overview Course Structure

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Not all course deliverables and meetings are shown, see syllabus Final Report Written report, template provided Team assignment Content Implementation and testing results Complete written record of project Graded by MIME Advisor Eval. 2 & Final Rep. Teams, Projects Oral Rep.2 Final Prop. Fall Term (ME / IE 497) RESEARCH & DESIGN F Eval. 1 Winter Term (ME / IE 498) IMPLEMENT & TEST F Status Mtg.2 Prelim. Prop. Final Pres. Oral Rep.3 Status Mtg.1 Status Mtg.3 Back.. Rep. Oral Rep.1 Status Mtg.4 Status Mtg.6 Status Mtg.5 Course Overview Course Structure

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Not all course deliverables and meetings are shown, see syllabus Evaluation 2 Team meeting with instructor (time and location TBD with instructor) Team meeting with instructor (time and location TBD with instructor) Scored based on extent to which design meets requirements Evaluated by Instructor for team grade. Criterion: convince a skeptical instructor that the tests have been passed. Evaluated by Instructor for team grade. Criterion: convince a skeptical instructor that the tests have been passed. 25% of winter term grade Eval. 2 & Final Rep. Teams, Projects Oral Rep.2 Final Prop. Fall Term (ME / IE 497) RESEARCH & DESIGN F Eval. 1 Winter Term (ME / IE 498) IMPLEMENT & TEST F Status Mtg.2 Prelim. Prop. Final Pres. Oral Rep.3 Status Mtg.1 Status Mtg.3 Back.. Rep. Oral Rep.1 Status Mtg.4 Status Mtg.6 Status Mtg.5 Course Overview Course Structure

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Course Overview Winter Term Deliverables / Evaluations Show syllabus schedule

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Petition Process Overview An approved petition can change any course requirement Common petitions: Changes to HoQ Changes to Due Dates Outcome of a petition is Approve Approve w/ penalty* Refuse Petition process is powerful, but students must be proactive! A petition form is provided … * Penalty is at the discretion of the instructor. A common guideline is 10% per week of delay (e.g. change TP in week 3 of winter term = 30% deduction)

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Petition Process Petition Form

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Petition Process Procedure Fall Term Petition form not required for HoQ changes (just get approval signatures, including instructor) For other changes, submit form to instructor Winter Term Petition required for all changes Submit form to instructor (If petition involves HoQ, must have approvals)

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Petition Process Criteria for Decision Approve and waive penalty No significant fault / negligence due to student team Due to factor(s) beyond teams control. Team took appropriate and timely action to correct Scope of project remains appropriate for Capstone Design Original intent of project remains intact

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Petition Process Criteria for Decision Approve and impose penalty Some fault / negligence due to student team Teams reaction may have been delayed or (at least initially) inappropriate. Scope of project remains appropriate for Capstone Design (HoQ) Sufficient time remains to complete other deliverables (due date) Original intent of project remains intact

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Petition Process Criteria for Decision Refuse Cause of problem was within teams control. Team did not take appropriate and timely response. Scope of project would become inappropriate Original intent of project fundamentally changed Inappropriate effect (e.g. attempt to circumvent testing failure)

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Team Charter The purpose of a team charter is to: Identify the Project Manager Define the teams goals& strategies to achieve them Identify the teams strengths and potential weaknesses Specify strategies for overcoming challenges that may arise Formalize and document team members agreements and commitments Guidelines & Template on web site Bring revised charter to Status Meeting 4

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Mid-Course Writing Goals Review The purpose of this mid-course goals review is to: Help you re-focus on communication content of Capstone Design Provide guidance in assessing your progress on the goals you set in your CCI. As you begin the second half of MIME Capstone Design, allow you the choice of (a)Recommitting to your CCI goals as originally written. (b)Refining your original goals to make them more specific and achievable. (c)Setting entirely different goals for the second half of MIME Capstone Design. Assignment available on course web site

Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Status Meetings Status Meeting Schedule: Same as last term but Tuesday meetings move to Monday, Thursday to Wednesday. (Except Status Meeting 4: Monday meetings on 1 st Wednesday of term, Wednesday Meetings on 2 nd Wednesday of term.) Come to meeting prepared to discuss the following Status Meeting 4: Implementation plan, design changes, revised team charter (bring copy of charter) Status Meeting 5: Readiness for Evaluation 1 Status Meeting 6: Readiness for Evaluation 2