REPUBLIC OF ARMENIA Seoul, Korea 04-06 September 2017.

Slides:



Advertisements
Similar presentations
Chisinau International Airport Modernization Project II.
Advertisements

TRACECA PROJECT EVALUATION. PROJECT Rehabilitation and Reconstruction of the Key Transit Highways Connecting the Centre of the Republic of Armenia to.
Bulgaria’s strategic road infrastructure challenges.
Meeting AECOM, AM SOP-T, CFR, JASPERS
The road transportation infrastructure program for Romania.
PPP Development Stage in Republic of Moldova Presented by: Ion Potlog Head of PPP Division CAPACITY BUILDING WORKSHOP ON PUBLIC PRIVATE PARTNERSHIPS (PPPs)
 «South Caucasus Railway» CJSC The perspectives of Armenia’s and South Caucasus Railway Integration into the Eurasian Transport System.
Rail Baltica RETURN TO EUROPE IN NEW QUALITY
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Implementation of Cohesion Fund Projects in Transport Sector Cohesion Fund Monitoring Committee 11 April.
DECREE OF THE PRESIDENT OF UZBEKISTAN «ON ADDITIONAL MEASURES TO STIMULATE ATTRACTING FOREIGN DIRECT INVESTMENTS» ON APRIL 10, 2012 #UP-4434 Ministry for.
22 February 2007 Analysis of European road organization and infrastructure funding CEDR Conference of European Directors of Roads Paris, 22 February 2007.
State company «Russian highways» General presentation June 2011.
TRACECA PROJECT EVALUATION. Mark the location of the project on the map with a plain, black line or dot. Constanta – Vama Veche Motorway section.
Financing Urban Public Infrastructure
June 2013 Building the New Silk Road: EBRD transport infrastructure investments in Central Asia Askar Namazbayev, Infrastructure Russia and Central Asia.
Imagine the result European Infrastructure Friedrich Schneider, Executive Board Member August 4, 2010.
Audit of Public Procurement
TRACECA PROJECT EVALUATION. LEVEL CROSSINGS ON GEORGIAN RAILWAY TRACECA ROUTE AUTOMATION OF 39 LEVEL CROSSINGS ON THE MAIN LINE FROM AZERBADJAN BORDER.
P UBLIC -P RIVATE P ARTNERSHIPS IN M ONGOLIA Now and Futures Prospects E.Enerelt, ADB June 6, 2014.
TRACECA PROJECT EVALUATION
The State Procurement Agency of the Republic of Azerbaijan Welcomes the participants of the 11 th Public Procurement Knowledge Exchange Forum “Procurement.
TRACECA PROJECT REPAIR AND REHABILITATION OF FERRY COMPLEX VARNA.
© International Road Transport Union (IRU) 2012 IRU Model Highway Initiative (MHI) TRACECA Investment Forum Brussels, 28 February 2012 TRACECA Investment.
1 «Public Procurement System of the Republic of Azerbaijan» Elshad Samedzade PhD Web-site:
THE PORTUGUESE EXPERIENCE WITH “EU” FUNDING MECHANISMS.
1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.
Presented by: TRAFFIC MANAGEMENT BRANCH, HIGHWAYS DIVISION MOWI.
STEPS FOR FUNDING ELI-NP March 11 st 2011 Dan Cutoiu.
A European Commission funded Regional Programme since Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation.
1 APPLICATION ON THE SPANISH CONCESSIONAL MODEL TO CENTRAL AND ESTERN EUROPE WORLD BANK WORKSHOP ON PPP IN HIGHWAYS: INSTITUTIONAL, LEGAL, FINANCIAL AND.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
POTENTIAL AND ADVANTAGES FOR FOREIGN INVESTMENTS IN SERBIA Centre for Development, Restructuring and Privatization 2013.
Project # 1 Rikoti-Zestaponi Highway May, Rikoti-Zestaponi Highway 11/29/2015Ministry of Regional Development & Infrastructure of Georgia 2 Poti.
International Logistics Centres for Western NIS and the Caucasus Georgia: Areas in the vicinity of Tbilisi airport Ministry of Economy and Sustainable.
Munich, 30 September 2010 Road Infrastructure in Bulgaria.
Oct Project Fund- An Instrument to Finance Infrastructure Projects Two Case Studies.
Ministry of Economic Development of the Russian Federation Andrey Sokolov Department of projects of regional economy development Ministry of Economic Development.
E LECTRIFICATION OF L ATVIAN RAILWAY NETWORK 1. O PERATIONAL P ROGRAMME FOR THE EU F UNDS P ROGRAMMING P ERIOD «G ROWTH AND EMPLOYMENT » 6.2.
9 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2002 BG 16 P PE 018 Shoumen Water Cycle Improvements.
CURRENT PLANS FOR EXISTING AND DEVELOPMENT OF NEW RAILWAYS IN UGANDA PRESENTED BY GRACE JAMES ITAZI DIRECTOR OF TRANSPORT MINISTRY OF WORKS AND TRANSPORT-
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
Rail Schemes and the PPP Model November Rail Schemes and the PPP Model  Rail Schemes  PPP model  Successful Projects  Lessons Learned  Conclusions.
INTRODUCTION OF THE SYSTEM OF ACCOUNTS AND SUB-ACCOUNTS ENERGY COMPANIES Mr. Armen Arshakyan Head of the Tariff Policy Department Public Services Regulatory.
An Introduction of Silk Road Fund Dan WANG Executive Vice President Algiers, September 2, 2015 Silk Road Fund - Promoting promoting One Belt and One Road.
RURAL CREDIT IN ROMANIA - PRE - ACCESION PERIOD- Brussels, January 27, 2011 MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Public – Private Partnership in Vietnam: A new approach Ho Chi Minh City – June 2010.
Chairman of Road Infrastructure Agency Management board
RAIL BALTICA RIGA STATION – ASPIRATION FOR THE FUTURE
Stage 2 Light Rail Transit Program “In the ground ready”
Minimum Set of Requirements for Suppliers
Minimum Set of Requirements for Suppliers
The South African National Roads Agency SOC Ltd
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Loan Project of Construction of Iran-Armenia 400kV third power transmission line (“ Noravan’’ 400/220/20 kV) and related substation.
GREECE-ALBANIA IPA CROSS BORDER COOPERATION PROGRAMME
MANDATE   The Housing Development Agency (HDA) has been established to facilitate and expedite the development of large scale integrated, sustainable human.
Jaroslav Straka, F4 Czech Republic and Slovakia, G.1 – Transport
Cross-border Infrastructure Projects
The European Investment Advisory Hub Support to CEF Blending
ROAD INFRASTRUCTURE DEVELOPMENT PROGRAMME ZIMBABWE
»Invest in Montenegro. Invest in the Region «
EU ENERGY & SUSTAINABLE DEVELOPMENT POLICY IN THE EU EXTERNAL PROGRAMMES FEMIP & NIF Energy projects Brussels, November 25th 2008.
Presentation Plan Overview of Kazakhstan’s small business sector
Energy Sector Overview
PRIORITY POJECTS OF THE TRANSPORT SECTOR OF THE REPUBLIC OF TAJIKISTAN
Cofindustria OVERVIEW OF THE WORLD BANK PROGRAM IN SERBIA
Proposal for Financing Balti - Criva road sector rehabilitation
The Role of Private Sector in Capital Budgeting
Presentation transcript:

REPUBLIC OF ARMENIA Seoul, Korea 04-06 September 2017

Capital: Yerevan Area: 29,743 km2 Population : 3,031,670 Official language: Armenian

Ministry of Transport, Communication and Information Technologies of the Republic of Armenia The Ministry is a republican body of executive authority that elaborates and implements the policy of the Government of the Republic of Armenia in the field of: Transport and road-construction communication information technologies

Priority Transport Projects in Republic of Armenia North-South Road Corridor Investment Program M6 Vanadzor-Alaverdi-Georgia interstate road

Poti (Black Sea) – Georgia – Armenia – Iran – Bandar Abbas (Persian Gulf) www.northsouth.am – North-South Road Corridor Investment Program

Brief Introduction of the North-South Road Corridor Investment Program North-South Road Corridor construction length shall be 463km. Design speed-100 km/h. Traffic duration- 4,5-5h. The length of the existing road -556 km. Traffic speed- 30-90 km/h. Traffic duration- 9,5-10h. Total investments- about 2,3 billion USD without VAT. Existing, agreed and considered. ADB financing- 500 million USD. EIB financing - 68 million + 136 million + 204 million USD. NIF Grant - 14 million + 14 million + 36 million USD. Netherlands grants - 68 million USD. EDB financing -150 million + 350 million USD. Total - 1.540 million USD. Remaining - 760 million USD. Implementation period-2010 – 2022. www.northsouth.am – North-South Road Corridor Investment Program

Description of the North-South Road Corridor Investment Program The North-South Road Corridor Investment Program is aimed at reconstruction of the 2nd-3rd category carriageway with a speed limit of 30-90 km/hour the length of which is 556 km from Bavra in Georgia to the border with Iran in Agarak , upgrading it up to 463 km-long 1st category high-speed carriageway section with a speed limit of 100-110 km/hour enabling to cross the mentioned section within the decreased 4.5-5 hours period instead of current 9.5-10 hours increasing the comfortability and safety by ensuring the fulfilment of the Project goal in regards of making the North-South Road a transit carriageway for passenger and cargo transportation from the East to the West within scope of TRACECA and Silk Road Projects. The preliminary estimated cost of the construction works of the North-South Road Corridor Investment Program is about 2,3 billion USD (excluding VAT and the cost of land acquisition and resettlement), 200 million USD of which shall be allocated for design, technical supervision and other consulting services, and 2,1 billion USD-for capital construction. www.northsouth.am - North-South Road Corridor Investment Program

Tranche 1, Yerevan-Artashat and Yerevan-Ashtarak Total length- 31 km. Construction completion– 2016, June. Construction cost- 70,4 million USD. Contractor- ISOLUX CORSAN /Spain/. Engineer/PMC- “Safege-Eptisa”JV /France/. Opened for traffic- December, 2015. Put into operation – June, 2016. Guarantee period– by September 2017. Capital repair, reconstruction and construction of 9 overpasses and bridges are carried out in scope of the saving measures. www.northsouth.am - North-South Road Corridor Investment Program

Tranche 2, Ashtarak-Talin Section length- 41,9 km. Construction completion- 2018. Construction cost- 179,6 million USD. Contractor- ISOLUX CORSAN /Spain/. Engineer/PMC- “Safege-Eptisa”JV /France/. Issues – LARP, Infrastructure, Archeological. www.northsouth.am - North-South Road Corridor Investment Program

Tranche 3, Talin-Gyumri The tender was announced in June, 2015. Section length-46,2 km. Talin-Gyumri section is divided between ADB and EIB: ADB – Talin-Lanjik- 18,7 km. EIB – Lanjik-Gyumri- 27,5 km. The tender was announced in June, 2015. Contracts awarded in 2015-2016. Contractor - Sinohydro Corporation LTD, China. Engineer/ technical supervision- SPEA-IRD Consortium, Italy. Contract- Talin-Lanjik, about 60 million USD. Contract-Lanjik-Gyumri, about 84 million USD. Construction completion- 2018-2019. www.northsouth.am - North-South Road Corridor Investment Program

Tranche 4, Artashat-Agarak The current length of Artashat-Agarak /checkpoint/ is 358km. The road will be reduced by approximately 91 km. Feasibility study is completed. The expected internal rate of income (EIRR) is 14%. The preliminary design for all sections and the detailed design for Sisian-Qajaran 64 km section are in process. They will be ready by December 2016 and February 2017. Designer- SPEA-IRD Consortium (Italy) Tender for the construction of Agarak-Qajaran section was announced in August 2016, and the Contract signing is envisaged in December, 2016. Financing- EDB loan- 150 million USD. Construction completion- 2019. Additional fund possibility for Tranche 4. EDB loan- 350 million USD. ADB loan-170-200 million USD. EIB loan-170-200 million USD. Possible grants- NIF and the Dutch Government – up to100 million USD. (PPP) Implementation is possible, research memorandums are signed with SINOHYDRO, STRABAG, AVIC, etc… companies. www.northsouth.am - North-South Road Corridor Investment Program

Tranche 4 , Artashat-Agarak, key sectors- Sisian-Qajaran The total construction length of Sisian-Qajaran section is 63.8km, and the estimated cost is about 490 million USD without VAT and land acquisition cost (By the WB HDMI 4 project the EERR makes more than 14%). The required amount of financing without VAT and including the unexpected expenses and the consultancy is 520 million USD, from which: - The cost of 54.3 km total length section of only the roads (44.7km), bridges (3.6km), as well as the existing small tunnels (with 0.1-0.7km length , in total 6 and the whole- 2.4km) and the approaching roads(12 X 0.3km= 3.6km) makes about 310 million USD. Financing is not available yet. It is proposed to apply for receiving 350 million USD credit funds from the Eurasian fund for Stabilization and Development of Eurasian Development Bank for financing of the construction of the mentioned sections (54.3km)-and end of Qajaran tunnel– Qajaran (4km) sections including the unexpected expenses and the consultancy . - The cost of 9.5 km total length section of Bargushat tunnel (8.6km) and the approaching roads (0.9km) makes about 180 million USD. Financing is not available yet. It is proposed to apply for using 170 million USD credit funds available in Tranche 4 from Asian Development Bank, and 25 million USD remaining from Tranche 1-3 , total 195 million USD, including the unexpected expenses and the consultancy. The possibility of Public Private-Partnership is considered in parallel. www.northsouth.am - North-South Road Corridor Investment Program

Tranche 4, Artashat-Agarak, key sectors - Qajaran-Agarak The total construction length of Agarak-Qajaran section is 42km, and the estimated cost is about 280 million USD without VAT and land acquisition cost (By the WB HDMI 4 project the EERR makes more than 14%). The required amount of financing without VAT and including the unexpected expenses and the consultancy is 310 million USD, from which : Only the roads and bridges section (36km) makes about 160 million USD from which the end of Qajaran tunnel– Qajaran section (4km) make about 25 million USD. Financing is available. Credit funds of Eurasian Development Bank with the amount of 150 million USD, which is sufficient for the construction of the beginning of Agarak-Qajaran tunnel section 32 km including the unexpected costs and the consultancy. The difference for the end of Qajaran tunnel –Qajaran section (4km) (about 25 million USD including the unexpected costs and consultancy) is envisaged to be completed at the account of tender savings and/or in scope of further tranche of Eurasian Development Bank credit funds. - The section of Qajaran tunnel (4.8km) and the approaching roads (1.2km) make about 130 million USD. Financing is not available yet. It is proposed to apply for 120 million USD Euro credit funds from European Investment Bank (equivalent to 135 million USD ) with the ADB co-financing to finance the construction of the mentioned section, including the unexpected funds and consultancy. The possibility of Public Private-Partnership is considered in parallel. www.northsouth.am - North-South Road Corridor Investment Program

Investment and PPP implementation possibilities. Feasibility study for Artashat-Agarak road section is ready. The preliminary design submitted at the June of 2017 and the detailed design for Sisian-Qajaran (64km) section will be submitted by end of 2017 . The 80% of the mentioned section can be separated and considered as project implementation in scope of concession (Investment and PPP). The existing carriageway section shall be maintained as a free alternative of toll road. The section envisages tunnels with 0.2-9km length with two directions, single-lane carriageway traffic and approximately with 30 km total length. The length of the existing road of the mentioned section is 358km which as a result shall be reduced by 91km. Note, for example: 124km length of Sisian-Qajaran section shall be reduced by half and become a road with 64km length. 54km length of Qajaran-Agarak section shall be reduced by 12km and become a road with 42km length. More than 72km reduction is envisaged in the mentioned subsections and the increase up to 100km/h speed which will ensure the reduction of the traffic duration by 3-4 hours. The estimated preliminary cost of the construction works of Artashat- Agarak section is about 1,8 billion USD (including the cost of consulting services, without VAT and the land acquisition and resettlement cost), from which the financing of Qajaran-Agarak section with 150 million USD is already being implemented by the RA through EDB funds. www.northsouth.am - North-South Road Corridor Investment Program

Tranche 5, Gyumri-Bavra The construction length of Gyumri-Bavra /checkpoint/ road section shall be 57,4km. Gyumri-Bavra section is envisaged to be implemented within EIB credit funds. Estimated cost- about140 million USD. Construction duration- 24-36 months. Feasibility study, preliminary and detailed designs are financed by NIF grant, the contract is signed, Designer – Lotti (Italy). Within the scope of the current funds there is a possibility to reach Gyumri/bypass from the end of Tranche 3 up to M7 Gyumri-Vanadzor road. Airport GYUMRI M7 www.northsouth.am - North-South Road Corridor Investment Program

PPP implementation general methods/conditions State participation method and volume (Investments and PPP). - The government will co-finance the VAT (20%) and the cost of land acquisition and resettlement. The Government already finances more than 30% of the total program, with the involvement of loan and other funds. Type of concession (Investments and PPP) , (Build-Manage-Transfer, Build-Transfer-Manage, Build-Own-Manage, Build-Own-Manage-Transfer, Buy- Build-Manage). The following sequence is envisaged, according to preference. Build-Own-Manage-Transfer Build-Manage-Transfer, Build-Transfer-Manage, Build-Own-Manage, Buy-Build-Manage The mentioned options are subject to discussion and the preference shall be provided only to the companies which submitted well-grounded economic / technical / legal proposals prepared properly. Other envisaged conditions of the Concession (Investments and PPP). - The relevant legal or contractual regulation shall define a state liability before the end of the operation regarding the refund / compensation of the possible negative difference of net investments (without the expected profit) of the envisaged actions. www.northsouth.am - North-South Road Corridor Investment Program

M6 Vanadzor-Alaverdi-Georgia interstate Road

M6 Vanadzor-Alaverdi-Georgia interstate Road The project consist of the (2x1) rehabilitation and upgrading of the M6 interstate road on a length of about 90 km between Vanadzor in central Armenia and Bagratashen at the North eastern border between Armenia and Georgia. Section length-90 km. Vanadzor-Alaverdi section is divided between EIB and ADB: EIB – 0+000 – km 38+450 - 38,5km. ADB – 38+450 – km 90+191 – 51.5 km. The tender for EIB section was announced in 2015. Contraction works was started in September, 2016. Contractors – Kapavor LLc, AraratChanshin and Dor Lider JV, Chanaparh and KamurjShin JV Armenia. Engineer/ technical supervision - Kocks, Germany. Contract - about 28.6 million USD. Construction completion - 2020. The tender for ADB section was announced in January, 2017 Tender in the evaluation stage.

Address: 28 Nalbandyan street, 0010, Yerevan, Republic of Armenia Tel: +37410 59 00 94, Fax: +37410 52 38 62 E-mail: kristine.beglaryan@mtcit.am THANK YOU!