Marine Strategy Framework Directive (MSFD)

Slides:



Advertisements
Similar presentations
Reporting on Programme of Measures (Art. 13)
Advertisements

DG Environment, Unit D.2 Marine Environment and Water Industry
DG Environment, Unit D.2 Marine Environment and Water Industry
Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – WFD CIS SCG meeting of 11 March 2009.
JRC’s Follow-up work to improve GES assessment
OSPAR Joint Documentation on Coordination of Measures (MSFD)
D2 NIS REVIEW PROCESS March 2014: Draft Manual endorsed by WG GES
Marine Strategy Framework Directive (MSFD)
SSG on Climate Change and Water SCG meeting May 2008 Marieke van Nood, Unit D.2, DG Environment, European Commission.
Agenda item 6e) Update on progress elaboration of Article 4.7 Guidance
Improving assessment of GES Draft conclusions and Way forward
Review of Decision 2010/477/EU and MSFD Annex III
D1 BIODIVERSITY REVIEW PROCESS
on Priority Substances Strategic Coordination Group
DG Environment, Unit D.2 Marine Environment and Water Industry
12th meeting of ESA working group
Reporting for MSFD Article 13 and 14 –
Marine Strategy Status
Draft CIS work programme
Draft CIS work programme
19th meeting of the WG GES 22/03/2018
Marine Strategy Framework Directive State of play and follow up
European Commission DG Environment
DG ENV/MSFD 2018 call for proposals
Marine Strategy Framework Directive (MSFD)
Activity on environmental objectives and exemptions
Preliminary methodology for the assessment of Member States’ reporting on Programme of Measures (Article 16) WG DIKE Sarine Barsoumian (12/10/2015, Brussels)
CIS progress June-November 2011: main highlights
DG Environment, Unit D.2 Marine Environment and Water Industry
Information on projects
6th WG-ESA meeting in Bonn 13th -14th of October - Follow up
WG GES, 6 December 2016, Brussels
Draft Mandate and Proposed Approach for the Drafting Group on
DG Environment, Unit D.2 Marine Environment and Water Industry
Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – WFD WG Reporting - 31 March 2009.
Revision of Decision 2010/477/EU Overview of main changes
WG GES: Decision review progress
Marine Strategy Framework Directive State of play and follow up
Green Paper on Adaptation and
Developing a common understanding of Articles 8, 9 & 10 MSFD
DG Environment, Unit D.2 Marine Environment and Water Industry
Common Understanding Way forward
Fitness Check of EU Freshwater Policy
DG Environment, Unit D.2 Marine Environment and Water Industry
Working group on data & information sharing DIS under CIS of WFD
European Marine Strategy
7a - Environmental Objectives and Exemptions under the Water Framework Directive SCG meeting 5 November 2008 Marieke van Nood, Unit D.2, DG Environment,
European Commission, DG Environment, Marine Unit
Reporting for MSFD Article 13 and 14 –
Draft CIS work programme
Scene setter European Commission DG Environment
Marine Strategy Framework Directive reporting: progress and next steps
Revision of Decision 2010/477/EU
DG Environment, Unit D.2 Marine Environment and Water Industry
DG Environment, Unit D.2 Marine Environment and Water Industry
Feedback from Meeting of the Working Group on Economic and Social Analysis 14th October 2014 MSCG November 2014, Brussels.
DG Environment, Unit D.2 Marine Environment and Water Industry
Conclusion and action points
DG Environment, Unit D.2 Marine Environment and Water Industry
Joint meeting of WG’s DIKE, GES, POMESA 27 April 2017, Brussels
Review of Decision 2010/477/EU and MSFD Annex III
DG Environment, Unit D.2 Marine Environment and Water Industry
Marine Environment and Water Industry
European Marine Monitoring and Assessment
EU Water Framework Directive
Marine Strategy Coordination Group 14 November 2011, Brussels
Water Director's Meeting December 2013, Vilnius DG Environment
Preparatory meeting for the establishment of the Project Coordination Group (PCG) for the implementation of the MSFD 13 November :00-13:30 European.
Marine Strategy Framework Directive Strategic discussion on the future role of WG GES WG GES, 5-6 March 2013 European Commission, DG Environment, Marine.
Item 4 b) Marine Strategy Framework Directive and CIS WFD
Presentation transcript:

Marine Strategy Framework Directive (MSFD) Common Implementation Strategy 10th meeting of the WG GES Agenda item 3: b. Report on the joint GES/ESA workshop (17-18 June 2013) Report on WG ESA meeting (15-16 October 2013) -> Draft Recommendation on MSFD-Programmes of Measures European Commission DG Environment Marine and Water Industry Unit 21 October 2013, Brussels

Joint GES/ESA workshop (17-18 June 2013) Main conclusion More than 60 participants ESA and GES members + RSC representatives + Stakeholders + EC + Consultants Main conclusion: A set of Key Messages has been identified Need to join effort to establish a Recommendation / Concept paper for the establishment of PoM asap, based on the KM Need to continue sharing information through specific workshop

Joint GES/ESA workshop (17-18 June 2013) Overview of the KM (1) Following presentations made and plenary discussions: KM 1: Follow the logic of the Directive: IA -> Indicators and targets -> measures (Art 13.1) all to meet GES in the end KM 2: Need to prioritise from potential measures under consideration to cost effective and technically feasible measures (Art 13.3) KM 3: Where relevant and practical, measures could to be coordinated (Art 5.2 and Annex VI.4)). RSC play an important part in this process. KM 4: Consider the need to agree a high level categorization of measures that could help with reporting (see decentralised approach / fact sheet for monitoring) KM 5: Learn from WFD and appreciate that there are some differences.

Joint GES/ESA workshop (17-18 June 2013) Overview of the KM (2) Following break-out sessions: KM 1: A lot done in Art 8, 9 qnd 10 but there are gaps: where information good enough progress on measure should be made in cycle 1 Where there is more uncertainty, exchange ideas and fill gaps in preparation for cycle 2 and consider the application of the precautionary principle KM 2: Typology (Annex VI) is not very relevant for economic and technical analysis on measures. However, there may be benefits for regional co-ordination and reporting in the long term. KM 3: Important to understand the links between existing measures and MSFD requirements; perform a gap analysis to identify new measures and coordinate better with relevant existing policy: what extentd we need to review the effectiveness of existing measures in meeting MSFD targets? If changces are needed in other Directives to meet MSFD requirements, they should be made in those Directives and not in MSFD KM 4: Different interpretation of Art 14: need for a common understanding (need to reflect lessons learnt and existing guidance from WFD) KM 5: Cooperation ESA-GES: process should be interactive and on-going. Information needed from GES and other relevant policy experts e.g. type of measure, expected impact, and technical feasibility of measures KM 6: Suggestion for joint knowledge exchange forum in Autumn: mid / long term fora for exchanging info on Eurostat data issues and other practial issues KM 7: Coordination better placed at Regional Seas Convention . Recognisition that RSC provide a relevant group for developing coordinated measures

Joint GES/ESA workshop (17-18 June 2013) Follow up E-mail to MSCG members (25 June) informing on the operational conclusions and the plan to process. Some interim work with exchange of e-mail to prepare a first document identifying: The objective of a possible PoM Recommendation, The main outline of the Recommendation, The Key messages which need to be further developped, added or deleted.

WG ESA meeting (15-16 October 2013) The meeting mainly focused on : CIS work program Follow up of the ESA-GES workshop (one of the main activities of WG ESA identified in the CIS work program)

Outline of the PoM Recommendation – Version 0 Introduction Requirements of the Directive Recommendations / Key messages -> 7 Costs, benefits and governance of the programmes of measures RSC on-going work Reporting Knowledge exchange and other practical issues Annex 1: Descriptors approach aiming to identify per Descriptors which measures are already covered by other legislation Annex 2: Legislative / Funding mixed approach aiming at identifying measures in other policies which are pertinent for MSFD but not listing them extensively in PoM. This would help for the identification of the good governance level of the overall PoM together with the relevant funding mechanism which may be used. Annex 3: Analysis of needs from reporting on MSFD PoM programmes: key questions

Outline of the PoM Recommendation – Version 1 Introduction Requirements of the Directive Requirements for the development of measures Requirements for regional cooperation Requirements in relation to other policy frameworks Exemptions Timeline ‘Measures’ and ‘programmes of measures’ – definitions and typology Logics of the directive and streamlined procedures for the development of programmes of measures Technical specification of environmental targets as a basis for measures Attribution of existing measures and of measures that are already under development Gap analysis and identification of additional (and/or modified) measures Selection of measures (where there is a choice) e.g. under consideration of DEA and CBA approaches Alignment of measures into a PoM Implementation planning Assessment of sustainability of PoM Strategic environmental assessment of PoM (where necessary)

Outline of the PoM Recommendation – Version 1 Interlinkages to other policy frameworks (including other EU directives) Measures under the WFD Measures under the Habitats and Birds directives Regional measures Other relevant regulations Coordination within marine regions Costs, benefits and governance of the programmes of measures Reporting Knowledge exchange and other practical issues Annex inchanged

Proposed next steps Action Who When Version 1 to be sent to ESA and GES members ESA co-chairs 18 October 2013 Presentation/discussion on the Version 1 DG ENV 21 October 2013 (GES meeting) General written comments to be received on Version 1 ESA members 25 October 2013 Version 2 with cover page requesting for a mandate to work further to be sent to MSCG 29 October 2013 Discussion on version 2 MSCG 12-13 November 2013 (MSCG meeting)

Action Who When Designation of experts from GES and ESA to participate to a dedicated PoM drafting group MSCG 15 November 2013 Version 3 taking into account MSCG discussions to be sent to the drafting group DG ENV Written comments to be received on Version 3 PoM Drafting group 4 December 2013 Version 4 collecting comments received from PoM Drafting Group on version 3 to be sent back to the Drafting Group 6 December 2013 Discussion on version 4 10-11 December 2013 (PoM Drafting Group meeting) tentative dates, Brussels to be confirmed Intercessional work To be organised Discussion on version 5 If necessary 27-28 January 2014 Version 6 to be sent to MSCG 29 January 2014 Discussion (endorsement) on version 6 11 February 2014 (MSCG meeting) MSCG will be asked to agree upon the main elements of the Version 6 which will be necessary to start working on related reporting. The endorsement of the final version should then happen not later than at the next MSCG meeting (May 2014) including Annex 3 on reporting

Thank you for your attention! http://ec.europa.eu/environment/marine Thank you for your attention!