Presentation is loading. Please wait.

Presentation is loading. Please wait.

Agenda item 6e) Update on progress elaboration of Article 4.7 Guidance

Similar presentations


Presentation on theme: "Agenda item 6e) Update on progress elaboration of Article 4.7 Guidance"— Presentation transcript:

1 Agenda item 6e) Update on progress elaboration of Article 4.7 Guidance
Meeting of the Strategic Coordination Group (SCG) for the WFD Common Implementation Strategy 17-18 May 2017, Brussels

2 Ad-hoc Task Group Article 4(7)
Ad-hoc Task Group Hydromorphology

3 CIS Work Program 2016-2018: Elaboration of CIS Guidance on WFD Article 4(7)
2008: CIS Guidance No. 20 on Environmental Objectives and Exemptions – includes also chapter on Art. 4(7) Since then Member States gained valuable practical experience Current CIS Work Programme : Request to develop specific Guidance on Art. 4(7) Scope: Application of Art. 4(7) and interplay with other EU environmental directives, including Habitats Directive EIA and the SEA Directives Floods Directive, MSFD, … Application of Art. 4(7) also to be seen in the context of Renewable Energies Directive TEN-T and TEN-E CEF, Rural Development Programmes, etc.

4 Article 4(7) Guidance: Steps taken
Specific 4(7) Ad-hoc Task Group (ATG) established, co-chaired by BE, FR, WWF and COM Objective: Guidance should be practical, provide useful information and technical advice, however Cannot provide an exhaustive and detailed methodology for all potential cases Steps taken: A number of practical case studies collected and Key Issue Paper as input for Workshop elaborated 13-14 December 2016, Brussels: Workshop on Article 4(7) February 2017: First draft of Guidance elaborated and provided for comments to 4(7) ATG Presentation and discussion in WG ECOSTAT, Floods, Groundwater Draft 2 currently in finalisation stage SCG continuously kept informed about progress

5 D R A F T Draft CIS Guidance on Article 4(7)

6 Draft CIS Guidance WFD Article 4(7) Draft contents
INTRODUCTION INTEGRATION OF SECTOR POLICIES Transport, energy, flood risk management, marine European Funding Instruments Climate change as a cross-cutting issue Other environmental policies SCOPE OF ARTICLE 4(7) AND APPLICABILITY Recap WFD Objectives Scope of Article 4(7) Conditions triggering an Article 4(7) Test Effects on other water bodies and cumulative effects Managing uncertainty Article 4(7) Assessment and streamlining with other Directives Approach Streamlining of assessments with the EIA and Habitats Directive D R A F T

7 Draft CIS Guidance WFD Article 4(7) Draft contents
ARTICLE 4(7) TEST AND RELATIONSHIP TO THE RBMPs Step-wise approach for an Article 4(7) Test Taking all practicable steps to mitigate adverse impacts Assessing significantly better environmental options Weighing interests: Overriding public interest / benefits versus impacts Relationship to the River Basin Management Plans OUTLOOK AND FOLLOW-UP ANNEX D R A F T

8 Draft CIS Guidance WFD Article 4(7) Tables, figures and flow-charts

9 Next steps Draft 2 of CIS Guidance on Article 4(7) Further elaborated
Taking into account comments received Integration of practical case studies 1-2 June 2017: Meeting of Ad-hoc Task Group on Article 4(7) More detailed discussion and exchange Step towards elaboration of draft 3 of the Guidance Step-wise further elaboration during 2017 Tentative 2nd Meeting of Ad-hoc Task Group in autumn 2017 Finalisation envisaged by the end of 2017

10 Thank you for your attention http://water. europa
Thank you for your attention Disclaimer: "The views expressed in this presentation are purely those of the writer and may not in any circumstances be regarded as stating an official position of the European Commission."


Download ppt "Agenda item 6e) Update on progress elaboration of Article 4.7 Guidance"

Similar presentations


Ads by Google