LST Module Installation

Slides:



Advertisements
Similar presentations
LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
Advertisements

Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating.
2x2 module & stave layouts. 2 options “Small chip” “Big chip” Boundary between “small” and “big” is determined by the 6” sensor wafer layout that must.
Installation. Indoor Unit Installation Typical Installation.
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Crane & Hoist Training & Inspection Requirements Crane Safety.
Stations There are six stations of RPCs. They are 1-3 north, and 1-3 south. RPC3SRPC2S RPC1SRPC1N RPC2NRPC3N This document is available at
IFR-LST status report G. Cibinetto INFN Ferrara Babar Collaboration Meeting, Feb. 21, 2004 Milestones LST production status 1 st module assembled Princeton.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
RACKS AND CABLES Peter Kim SLAC LST Install Readiness Review May 5, 2004.
October 21, 2003LST Mechanical Design Review - SLACN. Yu BaBar IFR Upgrades An FEA Study of the Effects of Adding Brass Plates in the IFR.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
1 Apr. 28, 2007 Test of the Pulse Height and Time Jitter for the IHEP Full-Size RPC’s with 8-m-Long Readout Strip Planes C. Lu, K. McDonald and W. Sands.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2005 IR-2 Installation Discussion H.J. Krebs October 22, 2003.
BaBar: The Detector Richard F Boyce 21 October 2003.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2004 IR-2 Installation Schedule H.J. Krebs October 22, 2003.
University of Minnesota Unmanned Aerial Vehicle Research Lab Goldy Flight Control System Manufacturing Instructions.
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
Large Cell Scope Pictures, Part II HV Gnd 1nF Large Cell Tube Anode signal Phi Cathode signal scope S1 S2 S1 S2 This is a follow-up on Richard’s measurement.
C. Bromberg 1 Michigan State University Feb. 8, 2004 RPC Monolithic Detector l Most absorber shipped direct to the site äShipping minimized äHeavy (~20.
Installation. Indoor Unit Installation Typical Installation.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
October 21, 2003H.J. Krebs1 LST Mechanical Design Review Handling & Installation Fixtures Design and Fabrication Status H.J. Krebs October 10, 2003.
Setting up the Ricoh C305 Press F5 to start the Presentation
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
BIX In-Building Cross Connect system BIX Installation Guide ELCM 254 Updated December 2013 gmail.com 1 Most of the images and some text for.
Vaccon Vacuum Pump 2” Diameter flexible tubing to fit inside U-Bolt (not shown) will be used to attach tubing to framework. Vaccon Inline Venturi Vacuum.
LST Upgrade LST Upgrade Readiness Review William Sands, Princeton University,
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
CPA Micarta Based Rahul Sharma / Bill Sands. The present design shown in this document is based on the use of Micarta as the base material this will likely.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
LSTs in the IFR gaps Workshop on IFR replacement SLAC November 14, 2002 L. Piemontese INFN Ferrara.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Removable Lower Service Floor for the Scibar & EC Support Structures Edward Chi May 25, 2006 Fermilab/PPD/MD.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
BaBar LST Upgrade Mark Convery SLAC 13 Jun 07.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Chamber Design and Integration RE3/1 and RE4/1
First of all we will remind some numbers:
BIX In-Building Cross Connect system
UPS Connectivity Options: PPDM ( )
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Limited Streamer Tubes
RPC and LST at High Luminosity
OT Survey & Adjustment Outline: Survey technique at present
Map & Compass Skills.
General wiring procedure for a new instrument
Inner DET. Integration Inner detector envelope Radial clearances.
Limited Streamer Tube Project Summary
Bunker Wall Design Wall ESS
BaBar LST Upgrade Richard F Boyce
Presentation transcript:

LST Module Installation Mechanical Design Review William Sands, Princeton University, 10-22-03

Installation Procedure Overview 1) Installation takes place from the forward end using positioning apparatus designed for RPC removal. 2) The Z-strip is installed first with connectors toward the backward end. 3) Module is installed HV end toward backward end with utility tray fastened. 4) HV and gas lines are installed to module. 5) Next module installed and gas lines daisy chained from first module and HV plug installed. 6) When enough modules are in place so that the last will protrude from the backward corner plate the modules can be slide behind the corner plate. 7) Procedure continues until layer is full.

Z-Strips The Z-Strips are placed in each layer prior to the modules. The readout connectors are positioned between the center gap plates on the four side sextants and straddle the center gap plate on the top and bottom sextants.

Utility Trays The utility trays are installed on the module prior to sliding the module into a layer. The trays are used to organize the routing of cables and gas lines out of the layers.

Module Installation The modules will be installed by positioning the H-Box on the RPC removal apparatus and sliding the modules into the appropriate layers. When the modules are installed from one side of the box the top can be replaced and the box flipped to access the other side.

Forward End Facing North The forward end where the Z-strips and modules are installed will have the corner plates and center gap plates removed. Full access to the layers in the forward end will allow for a much more controlled installation and is necessary to fit the Z-strips which are full width.

Forward End Facing East For installation of the bottom sextant we have some obstructions with the concrete pier and structural apparatus shown below. The pier is approximately 161” from the steel and points on the structure come as close as 60”. Installation can be accomplished by installing some modules on an angle and then sliding them over.

Backward End Facing South From the backward end the gas lines , Z-Strip readout and HV lines will exit the layers between the gap plates. The gap plates will be removed for installation except in the bottom sextant where the DIRC prevents removal. The Phi readout will exit through the forward end except in layer 18 where all utilities must be routed through the forward end where there is no access to the backward end.

Cable Routing Cables and gas lines will be routed toward the opening at the center gap plates in the utility trays as shown below. Gas lines will be connected from one module to the next as they are slide to the corners, work will be done from the corners to the center where the bundles will enter a conduit to rout to the electronics and gas huts. Layer 17 and 18 contain 10 modules each which have the most utilities from each sextant to be routed. In the trays 5 modules will be routed from each side containing an input and output gas line and 5 HV lines along with grounds.

Daily Plan Each day in two shifts the plan is to install one layer or more if possible. A third quality control shift then comes on tests the modules each day. If a problem is found the first task the next day is to replace the faulty module and then move on to the next installations. It has been found that tube can sometimes be repaired, if this is the case the module will be used as a spare or installed in another sextant at a later date.