Problem solving.

Slides:



Advertisements
Similar presentations
Connoizor Enabling Performance for Businesses through Software Website: Contact:
Advertisements

Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Solutions to Chapter 12 Exercises
Microsoft Project 2002 Sessions 5-6. Entering Tasks During this first session we will enter a set of tasks that comprise building a shed – data sheet.
Applied Software Project Management Andrew Stellman & Jennifer Greene Applied Software Project Management Applied Software.
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Chapter 10: Monitoring and Controlling Change
Project Evaluation and Control
Earned Value Management
Chapter 10 Project Monitoring and Control
Project Management in Practice
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
Project Monitoring and Control. Monitoring – collecting, recording, and reporting information concerning project performance that project manger and others.
Project Management Methodology Project monitoring and control.
Controlling cost ( lecture + seminar ). Why control cost? To satisfy financial auditors and support data for the government (obligatory). To satisfy the.
1 ev14a Interactive Session 4 u Tuesday, July 17 7pm to 10pm u Build a sqa plan for the dental office software u Assume a 3-person, development team, a.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall13-1 Project Evaluation and Control Project Termination and Closeout Chapter
Cost Estimation and Budgeting. Cost management Data collection & cost estimation Cost accounting Cost controll Copyright © 2010 Pearson Education, Inc.
Monitoring and Information Systems
EARNED VALUE MANAGEMENT (EVM)
Controlling cost 2 ( seminar ). Budget preparation Data collection WBS Cost centres Indirect expenses & the use of hammocks –direct –overhead (indirect)
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Earned Value SOS section Sp8Jan24ev3. Earned Value Analysis One approach to measuring progress in a software project is to calculate how much.
Chapter 9 Project Development. What to manager Client experience  Clients are very important  Happy or not is largely dependent on their expectations.
1 Project Management – Unit 4 – Part 1 Cost Model ACWP: Actual cost of work performed: Actual costs in performing the work so far. BCWP: Budgeted cost.
Advanced Project Plan Tracking Lesson 15. Skills Matrix SkillsMatrix Skill Record actual start, finish, and duration values of tasks Enter actual start.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall13-1 Project Evaluation and Control Chapter 13.
Understanding & controlling the project Production Process.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
Schedule Control (Earned Value)
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
Earned Value Management
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
CPMGT 300 Week 4 DQ 1 Check this A+ tutorial guideline at T-300/CPMGT-300-Week-4-DQ-1 Your project budget is 80% spent.
Earned Value Analysis by Miles M. Hamby, PhD Copyright©2014 Miles M
Project Monitoring
TOPIC-8B- PROJECT COST CONTROL
PROJECT MANAGEMENT AND CONTROL
Project Management (x470)
CHAPTER:7 Project Cost Management
Earned Value Management
Project Management Basic Concepts
Earned Value Management
Project Cost Management
Work Packages / Deliverables Completed
Contract Performance Charts
Progress and Performance Measurement and Evaluation
Earned Value - What is it
Problem solving.
Earned Value Analysis It is a continuous comparison between the plan of the project data and the actual data. Budgeted and Committed Cost: Variance = Budgeted.
برنامه ريزي و كنترل پروژه
An Introduction to Earned Value Performance Measurement
Earned Value Measures Planned Value (PV) Earned Value (EV)
ENGINEERING MANAGEMENT (GE 404)
فرآيند كنترل پروژه.
Controlling cost.
Project Evaluation and Control
Earned Value Management
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
Todays Learning Outcomes
Controlling time.
Project Management Life Cycle
Controlling time (seminar).
Earned Value $$$.
Project Evaluation and Control
Presentation transcript:

Problem solving

Time control

Exercise 1 The project is the following: We have to create a prototype of some kind of a machine. The first step is planning the whole process (activity a, the expected duration is 5 days), than came the design phase (activity b, 6 days). Manufacturing is the third step (activity c, 7 days), and then an assembly process (activity d, 2 days). The project closes with a testing phase (activity e, 4 days). Plot the Gantt chart of the project. After 15 days, a and b are ready but nothing else. Identify/calculate PTPT, ATWP, SPI, PTWP, PTC, ETC, ETPT, expected time slip.

Solution of ex. 1 PTPT = 5 + 6 + 7 + 2 + 4 = 24 calendar days ATWP = 15 calendar days (= working days) PTWP = 5 + 6 = 11 working days SPI = 11/15 = 73.33% PTC = 24 working days – 11 working days = 13 wd ETC = 13 / (11/15) = 17.73 working days ETPT = 15 + 17.73 = 32.73 ≈ 33 working days also ETPT = 24 / (11/15) = 32.73 ≈ 33 calendar days Expected time slip = 24 – 33 = -9 calendar days

Exercise 2 There is a project with the following planned data. The schedule-plan is presented in the table below. After 8 days the actual monitoring report on progress: ’a’ 100% complete, ’b’ is 100% complete, ’c’ is 33.33% complete, d & e are at 0%. It is possible to start an activity without finishing any other (there is no precedence relationship in the project). a) What is the planned time to complete (PTC) the project? b) Calculate the schedule performance index (SPI). c) What is the estimated time to complete (ETC) the project? d) What is the estimated TPT? e) What is the estimated time slip for the whole project? Activity label Duration Planned start a 4 b c 3 8 d 11 e 2 14

Exercise 3 There is a project with the following planned data. The schedule-plan is presented in the table below. After 6 days the actual monitoring report on the progress of the project: ’a’ 75% complete, ’b’ is 50% complete, ’c’ & e are at 0%. It is possible to start an activity without finishing any other (there is no precedence relationship in the project). a) What is the planned time to complete (PTC) the project? b) Calculate the schedule performance index (SPI). c) What is the estimated time to complete (ETC) the project? d) What is the estimated TPT? e) What is the estimated time slip for the whole project? Activity label Duration Planned start a 4 b 2 c 6 d 10

Cost control

Cost of the whole activity Exercise 1 There is asmall project with the following network diagram: a b e c d The following table contains the information on the activity durations and costs: Activity label Duration (day) Cost of the whole activity a 3 60 b 4 120 c 2 100 d 90 e Plot a Gantt chart from the information above and calculate the BCWS for every day of the project.

Exercise 1 The project manager receives a progress report of the first 5 days, with the following information: Activity ‘a’ is completed in 3 days, it costed 75 25% of activity ‘b’ is completed during 2 days, 30 was paid Half of activity ‘c’ is ready (time spent was 2 days), costs were 60 Activity ‘d’ and ‘ e’ are not started Calculate BCWP and ACWP for the first 5 days Calculate CPI, SPI, BCC, ECC, FCC, the estimated overspending, PTC, ETC, ETPT and the estimated slip. Calculate the Earned Value for the first 5 days. Plot the S curves of actual, planned and earned values for the project.

Exercise 2 There is a 4 weeks long project with the following cost data, after 2 weeks: Calculate the ‘schedule variance in cost terms’, the ‘cost variance’, the ‘schedule performance index’ (SPI) and the ‘cost performance index’ (CPI) for the first two weeks.   1st week 2nd week 3rd week 4th week BCWS €200 €100 BCWP €150 €120 ACWP

Total cost of the activity Exercise 3 There is a project with the following planned data: Activity label Duration (day) Total cost of the activity a 3 150 b 2 200 c 300 d e 100 a b d e c Calculate the BCWS data for the whole project (activities placed to their ESTs)! After 5 days, the monitoring system provides the following information: Activity ‘a’ is completed Activity ‘b’ is at 50% Activity ‘c’, ‘d’ and ’e’ are 0% completed (not even started) Money spent: 300 Calculate BCWS, BCWP and ACWP for the first 5 days Calculate CPI, SPI, BCC, ECC and FCC

Daily cost of the activity Exercise 4 There is a project with the following planned data: Activity label Duration (day) Daily cost of the activity Predecessor a 3 150 - b 2 200 c 100 d e f 1 250 c, e Calculate the BCWS data for the whole project (activities placed to their ESTs)! After 6 days, the monitoring system provides the following information: Activity ‘a’ is completed Activity ‘b’ is completed Activity ‘c’ is at 67% ‘d’, ’e’ and ’f’ are 0% completed (not even started) Money spent: 1000 Calculate BCWS, BCWP and ACWP for the first 6 days Calculate CPI, SPI, BCC, ECC and FCC