SW Gage Blvd - Street Repair Project

Slides:



Advertisements
Similar presentations
Town of Mount Airy Main Street Construction Update Community Forum #5 and #6.
Advertisements

Highway 61/147th Street Intersection Business Meeting April 20, 2010.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
October 9, 2014 Glenn's Bay Road Widening and Interchange Project.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
Spotsylvania County Public-Private Transportation Act Spotsylvania County Infrastructure, LLC (SCI) June 2008.
Titusville to Edgewater Bike Loop PD&E Study
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
Sect. 12A-2 – Accessible SW Requirements ADA Clarifications: – When are curb ramps required? – What constitutes an alteration? – Does the scope of resurfacing.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
6 th Street Water Main And Street Reconstruction 2013.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Hawthorne & 16th Brian Marcum Chloe Ritter Collin Roughton.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
STA Safety Project PID #76439 December 12, 2006.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
1 Leon County Board of County Commissioners MICCOSUKEE ROAD RESURFACIING INTERMITTENT ROAD CLOSURE From North MERIDIAN STREET To DOCTORS DRIVE.
PROJECT 123(14) LOR PID INTERCHANGE IMPROVEMENT PARTNERING RE-CONNECT MEETING NOVEMBER 19, 2015.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
Madison Avenue Reconstruction Department of Planning and Development.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
MARCH 18, :00 A.M. CITY COUNCIL CHAMBERS 2016 TRAFFIC SUMMIT HOSTED BY: CITY OF LANSING DEPARTMENT OF PUBLIC SERVICE.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
March  Finish Joint Sealing on Highlands Ranch Parkway  Finish Grinding on Lucent and Plaza and then Complete Joint Sealing  Start in Late.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
The Gainesville Area Chamber Infrastructure Investment Initiative
June 5, 2017.
Town of Clayton 2016 Pavement Condition Survey
District 3 Complete Streets Projects
DICKINSON AVENUE RECONSTRUCTION
City of Bloomfield Hills
SW 6th Ave. Fairlawn to Gage
Beachside Traffic/Crosswalk Update
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
Highway 169 Bridge Replacement & Pavement Resurfacing
Project Scope of Work Project Contacts
SE 12th Street Roadway Improvements February 8, 2005.
SW 6th Ave. – Fairlawn to Gage
Contract 60X10 Informational Meeting Weber I-55
Walker Street Reconstruction Project 25% Design Public Hearing
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
St. Andrews Agenda Item 11.A & 11.B
2019 Capital Program Title of Presentation
Metropolitan District | mndot.gov
Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Project Location: 35th Ave HSIP8
Presentation transcript:

SW Gage Blvd - Street Repair Project SW 21st Street to SW 25th Street PROJECT CONTACT INFORMATION City of Topeka Engineering Robert Bidwell, PE 620 SE Madison Topeka, KS 66607 (785) 368-3842 rbidwell@topeka.org PROJECT SCOPE: Edge mill, concrete patching, & asphalt overlay Limited curb & gutter replacement Limited sidewalk replacement & sidewalk ramp replacement Storm sewer inlet replacement Consultant: SBB Engineering, LLC Brian Austin, PE 1415 SW Topeka Blvd. Topeka, KS 66612 Ph: 215-8630 brian.austin@sbbeng.com Contractor: Sunflower Paving, Inc. Jeff Engroff, President 1457 N 1823 Road Lawrence, KS 66044 (785) 856-4590 jeff@sunflowerpaving.com Project Funded by City of Topeka City Wide Half-Cent Sales Tax

Gage Blvd is currently concrete pavement with joints PROJECT OVERVIEW – SW Gage Blvd Street Repair General Overview Gage Blvd is currently concrete pavement with joints Repair Joints, Limited Full Depth Replacement Overlay concrete with Asphalt for much smoother ride Limited sidewalk replacement Replace majority of sidewalk ramps Limited curb and gutter replacement

Right: Curb and Gutter that will be replaced Left: Full depth repair of concrete pavement

Above: A portion of the existing sidewalk will be replaced to avoid trip hazards. Above: Sidewalk ramps to be replaced to meet ADA requirements.

Above: Example of finished product. Asphalt pavement, new pavement marking, sidewalk ramps replacement.

Above: Unmarked mid-block cross-walks will be removed Above: Unmarked mid-block cross-walks will be removed. A new Rectangular Rapid Flashing Beacon (RRFB) will be installed on the south side of 23rd Street.

Schedule: Start Date – June 18, 2018 Substantial Completion Date – September 28, 2018 Final Completion Date – October 12, 2018 Phase 1 – Temporary Traffic Control June 18 – July 27 (approximate) One lane each direction in existing southbound lanes Left turns prohibited

Schedule: Start Date – June 18, 2018 Substantial Completion Date – September 28, 2018 Final Completion Date – October 12, 2018 Phase 2 – Temporary Traffic Control July 28 – September 28 (approximate) One lane each direction in existing northbound lanes Left turns prohibited

Questions?