Stefan Will E.ON Bayern AG Germany

Slides:



Advertisements
Similar presentations
Guaranty of Supply Availability in a Competitive Environment –
Advertisements

Medium-Voltage Switchgear - Then and Now -
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
FCC Broadband Field Hearing Georgetown University Medical Center Deputy Chief Eddie Reyes Alexandria Police Department Thursday, November 12, 2009.
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
EVD4 - The Smart eVolution Primary distribution circuit-breaker with integrated protection, control and sensors © ABB Group 15. April 2017 | Slide 1 1.
Network Management on the Isles of Scilly Ben Godfrey Western Power Distribution Innovation and Low Carbon Networks Engineer /
Lecture 26 Distribution Systems Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Bulk Electric System Power Outages and Restoration Considerations Peter Heiman Western Area Power Administration (Desert Southwest Region) 1.
Chapter 2 ELECTRICAL POWER SUPPLY AND DISTRIBUTION IN BUILDINGS
PRESENTATION ON SUBSTATION DESIGN
UMKC Senior SUBSTATION DESIGN TEAM
SISTEMA Example One. Schneider Electric – Sistema Example 1 – June Example 1: Start/Stop Facility with Emergency Stop Device Circuit Diagram.
Transient Overvoltages
 Can we calculate, measure, predict the GICs?  How will the GICs affect transformers?  How will the power network respond?  What could we have done.
MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May 2003 One phase rural distribution installation with direct connection.
Frankfurt (Germany), 6-9 June 2011 Achim Hobl – Germany – RIF Session 1 – 0352 – p 1 Nexans' Superconducting Fault Current Limiters for medium voltage.
Cintas Fire Protection
Frankfurt (Germany), 6-9 June 2011 Hans-Erik Olovsson – Sweden – Session 1 Network Components – Paper 0453 Innovative Compact 145/12 kV Indoor Air Insulated.
Aleksandra RAKOWSKA Jozef LORENC Witold HOPPEL Poznań University of Technology Institute of Electrical Power Engineering DISTURBANCES IN POLISH 15 KV NETWORK.
Frankfurt (Germany), 6-9 June 2011 Simone Botton, Fabio Cazzato, Marco Di Clerico, Domenico Di Martino, Federico Marmeggi – Enel Distribuzione SpA Simone.
Barcelona, May 13, 2003 ASSET MANAGEMENT Development of new approaches Gerd Balzer Darmstadt University of Technology TU Darmstadt Institute of Electrical.
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
1200 kV AC Substations - Products and Integrated Solutions International UHV Symposium New Delhi, 29. January 2009 Edelhard Kynast Siemens AG, Energy.
M. Pühringer, Trench Austria - AT - Session 2 - Block 1- Question 3.3 page 1 Barcelona May 2003 RESONANT GROUNDING versus LOW IMPEDANCE GROUNDING.
MONFILS Pierre-André (BE) Barcelona May 2003 One phase rural distribution installation with direct connection to HV trunk line P.A. MONFILS, Jean-Louis.
A low - cost high performance MV RMU with circuit breakers for use in remote controlled MV / LV substations Fabio GIAMMANCO Luca GIANSANTE 1 1.
Incorporating Quality of Service into Incentive-based Regulation Juan Rivier Florence School of Regulation Workshop Improving.
Stefan Rolauffs DE Session 3 – Block 1.2 – Paper Presentation Barcelona May 2003 Aachen University 1 Computer-Based Support of Fault Clearance in.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
Frankfurt (Germany), 6-9 June 2011 KOSTIAINEN– FI – S3– 0622 Paper 0622 TOWARDS SELF-HEALING POWER DISTRIBUTION BY MEANS OF THE ZONE CONCEPT  Antti Kostiainen,
SWS and Electrification Lessons from Ghana’s Experience. By: Jabesh Amissah-Arthur, Managing Partner,
Utility Engineers, PC.  Generation  Transmission  Distribution.
Dr. W. H. Wellssow, © i d s GmbH EttlingenMai 2003 CIRED Round Table 5 Fault Statistics in Distribution Networks Dr. W.H. Wellssow IDS GmbH Ettlingen,
Review of TADS Data for 2012 Voltage Class Name Metric AC Transmission Outages - Failed Protection System Equipment AC Transmission Outages - Human Error.
Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona May ASSESSMENT OF PROTECTION SCHEMES: A KEY FACTOR FOR RELIABILITY.
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
Department of Electrical Engineering
Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.
S. MELQUIOND France Session 1 – Block 1 – Question 1- 5 Barcelona May Question 1-5 Is the transformer protection by mean of protection switch.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Electricity Distribution Co. EDCO Eng. Hamzeh Alfaqeeh Head of meters section 1.
Presentation Topic: Circuit Breakers Represented to: Dr. M. Riaz Khan Represented by: M. Mujahid.
EE 207: Fundamentals of Electrical Power Systems
Siemens PTI GIC Data File Contents Presented to PGDTF February 11, 2015.
PPU TERANG HATI PROJECT POWER DISTRIBUTION ENGINEERING (EPEB453)
P2 - Physics Mains Electricity
City of Mahnomen February 16, Initial operation: Incorporated in 1907 and began producing electricity in 1909 at Dayton Hollow Dam on the Otter.
CRICOS No J a university for the world real R Aging Equipment Replacement in Power Systems, Using Reliability and Cost Considerations By Dr. Ghavam.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Experiences on location of earth faults and short circuits
Quality Framework Proposal
Intelligent grid expansion – RheinEnergie AG, Germany
Unitil Customer Facing Technology
WELCOME TO ALL.
Oliver SCHROEDEL, Michael SCHWAN, Sven KOEPPE, Robert ROSENBERGER

KEY FEATURES FOR A MODERN DISTRIBUTION MANAGEMENT SYSTEM IN THE COMPETITIVE ENERGY MARKET ENVIRONMENT Andreas HUBER Gilbert SUTER Siemens AG.
Spanish Quality of Service Regulation for the Distribution Network
در تجزیه و تحلیل شغل باید به 3 سوال اساسی پاسخ دهیم Job analysis تعریف کارشکافی، مطالعه و ثبت جنبه های مشخص و اساسی هر یک از مشاغل عبارتست از مراحلی.
Effects on the Quality of Service of Changing the Neutral Grounding of MV Networks Miguel Louro – Portugal – Session 3 – Paper 0853.
Tailor-made solutions in response to increased demands on supply quality … paper 2.66 by DREWAG – Stadtwerke Dresden GmbH (Germany)
Urban MV Distribution Network with Cross Connection
Sami Repo Tampere University of Technology FINLAND
Grid Modernization Smart Grid NW – GridFWD
Cost-optimised Maintenance Strategy for 110 kV-Networks Dr
Utilizing the ring operation mode of MV distribution feeders
P2 - Physics Mains Electricity.
Types of Errors And Error Analysis.
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Presentation transcript:

Stefan Will E.ON Bayern AG Germany Reliability Analysis of MV Networks with Different Neutral Earthing Schemes Stefan Will E.ON Bayern AG Germany Klaus Schilling Siemens AG Germany

Geographic Diagram of Schwarzenbach Network 20 kV Network Schwarzenbach Schwarzenbach Substation Kulmbach Bayreuth Bamberg

Rural and Municipal Networks Basic Variant with Resonant Earthing Town Subnetwork with Low-Resistance Neutral Earthing

Frequencies of Supply Interruptions in 1/a Customer

Unavailability in min/a Customer

20 kV Live Line Working at E.ON Bayern Advantages for the customers Reduces customer outages Improved quality of supply Advantages for the network operator Lines can be operated continually Reduces expenses for notification of customers Advantages for the linesmen Reduces hazards due to switching errors Increases job safety

20 kV Live Line Working at E.ON Bayern