BRAC APR TASK FORCE MEETING May 13, 2008 Presentation by: Penn Daw Properties, L.L.L.P.

Slides:



Advertisements
Similar presentations
12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Kalamazoo Concept #1 Two plazas at intersection of 52 nd and Kalamazoo fronted with curved.
Advertisements

July 19, Horizon West Area 28,000 Gross Acres Six (6) Planned Villages / Communities Includes one (1) Town Center ~41,000 Planned Households.
Linden Hills Small Area Plan WorkshopWorkshop April 24 & 25, 2013.
Pinellas by Design: A Blueprint for Updating the Countywide Plan Pinellas Planning Council May 18, 2011.
© Barry D. Yatt. All rights reserved. 1 Takoma Park Dog Lounge Location Assessment: Use by Zoning Ordinances.
Concept Plan Presentation October, THE OPPORTUNITY A large portion of the area between Peger Road and Denali School is under utilized public land.
1 San Antonio BRAC 2005 Update The Communitys Support for BRAC 2005 Implementation Presented by James Henderson Office of Military Affairs City of San.
1. 2 o Initial Affordable Housing Ordinance adopted in 1997 o Community College District Ordinance adopted in 2000 required 15% affordable housing. o.
9 th & Colorado Proposed Urban Redevelopment Area 1 Land Use, Transportation & Infrastructure Council Committee June 4, 2013.
Ed Fuller, PhD University Council for Educational Administration and
SAVE OUR CITY: COMMUNITY DEVELOPMENT Commercial Revitalization.
Committed to Effective Community Development and Partnership.
From – A Report of the Connecticut Regional Institute for the 21 st Century by Michael Gallis & Associates, 1999 (known as the “Gallis Report”) Knowledge.
Kirkland 2035 Plan Update Summary of EIS Alternatives Transportation Commission – September 25, 2014.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Suggested Changes to Centers and Corridors Design Standards and Guidelines Amber Waldref August 11, 2014.
City of Waynesboro Entrance Corridor Design Guidelines.
Eastside Community Redevelopment Area Response to BoCC request for additional information Alachua County Department of Growth Management November 15, 2011.
Where are we now Dover grew by 3,103 persons between 2000 and 2010 making it the fastest growing community in the region during that time, by.
CITY OF AVONDALE ESTATES Fenner Dunlop Property Stakeholders Public Meeting February 25, 2010.
Multi-Family Development Trends in Delaware David L. Edgell, AICP Principal Planner.
Tampa Comprehensive Plan Housing Element Affordable Housing Policies.
City of North Richland Hills TOD Code Overview. Comments from November 20 Work Session Need to ensure the preservation of key historic assets in the Smithfield.
Candidate Briefing and Update. 45 minutes. Not a lot of time for most, for me IMPOSSIBLE ! ◦ Personal background ◦ Vision ◦ Development of a comprehensive.
Seattle Station Area Planning Milestones & Events Transit-Oriented Development Program Information & Schedule Station Area Atlas Station Area Recommendations.
1 Module 8 STATION AREA PLANNING. 2 Module 8 Station Area Planning Key Concepts and Definitions Station Area Planning Process 1.Define the Station Area.
Downtown Ridgefield Planning & Development Open House Presentation June 18, 2015.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT City Council June 3, 2014.
May 24, 2008PalmRidge Park A Mixed-Use Real Estate Property for Sale in McAllen, TX.
North East Study Area Staff Recommendation Thursday, June 25, 2009.
Town of Salisbury Lafayette-Main Rezoning Proposal Continued Public Hearing April 22, 2015.
Village of Ossining Vision Presentation Frederick P. Clark Associates, Inc. May 11 th, 2005.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
Community Development Department EUROPEAN VILLAGE MASTER PLANNED DEVELOPMENT AMENDMENT APPLICATION #2607.
Comprehensive Plan Advisory Panel September 19, 2007.
Application LU-MIN Small-Scale Future Land Use Map Amendment Twenty Fingers Property May 2007 PLDRB.
Planning & Community Development Department 1336 and 1347 East Colorado Blvd. Pre Development Plan Review City Council Meeting January 28, 2013.
F O R W A R D L A P O R T E What are the city’s top 3 economic development priorities? n=300.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT Planning & Land Development Regulation Board May 21, 2014.
TOD Technical Assistance Panel June 21, rd STREET, San Pablo CA.
Alex Lin Emily Schwartz Sarah Snider Kate Wittels.
Red: Toner Ave. Gray: Future City-Owned Parcels Remaining from the Redevelopment of N. Main Street Blue: Existing Municipal Lot.
Eastside Activity Center Zoning Overlay District and Amended Land Development Regulations.
RR Farms, LLC Presented by James Stowers, Esq. Wright, Casey & Stowers, P.L. --- Pioneer Square --- Pioneer Square.
North West Study Area Staff Recommendation Tuesday, September 22, 2009.
The Three Levels of Development Planning 1 Small Area Plan Zone / CDD DSP / DSUP.
CTC Planned Development and Development Agreement Modification January 26, 2016 Planning Commission Hearing Greg Turner, Land Use Manager.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
EASTSIDE ACTIVITY CENTER MASTER PLAN PROPOSED COMPREHENSIVE PLAN AMENDMENT CPA Board of County Commissioners Hearing May 13, 2008.
RFQ/P Opportunity Site 1 (1.4 acres) Catalyst Retail Anchor Tenant  Site 2 (.54 acres) & 4 (.63 acres)  Stand alone retail or mixed of uses with retail.
Special Use Permit CPA and Rezoning. SITE Small Scale Land Use Amendment The applicant wishes to remove an undeveloped 6.7 acre parcel that is presently.
The City of Edgewood, Florida Economic & Market Analysis.
Midtown Crossings. Destination Midtown Project Details on Midtown Crossing: Cost: Over $300 Million Size: 15 acres Seven buildings totaling 1 million.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
Bottineau Rezoning Study University Neighborhood Network Mary Kaiser, Phil Kelley, Ashley Kobberdahl.
COMPREHENSIVE PLAN UPDATE MEETING 1 – ANNEXATION, PLANNING AREA, AND DENSITIES 11/07/2013.
1 Gables Gateway. 2 1.Comprehensive Plan Text Amendment 2.Comprehensive Plan Map Amendment 3.Zoning Code Text Amendment 4.Change in Zoning 5.MXD3 Mixed.
Community Development Department MADISON GREEN AND TUSCAN RESERVE MASTER PLANNED DEVELOPMENT AMENDMENT APPLICATION #2616.
Infill Master Plan October 23, 2007 Infill Master Plan October 23, 2007 Board of County Commissioners Discussion Item.
Navy Lodge Site- Middletown Aquidneck Island Reuse Planning Authority Surplus Properties at NAVSTA Newport, Rhode Island March 6, 2013.
ARCH – 4601 Feasibility Study Presentation
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
General Plan Adoption Follow-up
Gateway Specific Plan Concepts
Using TIF to Support Primary Employers
City of Rexburg 2020 Comprehensive Plan.
Planning Commission Meeting: August 3, 2016
Special Exception to Reduce the Required Front Yard Setback for
WWPNA General Member Meeting October 16, 2018
Genesys Health System Campus & Community Revitalization
Presentation transcript:

BRAC APR TASK FORCE MEETING May 13, 2008 Presentation by: Penn Daw Properties, L.L.L.P.

BRAC 08-IV-5MV Penn Daw Properties, L.L.L.P acre assemblage consisting of 12 parcels 11 parcels owned by applicant 12 th parcel under contract Assemblage is a substantial consolidation of Sub-Unit E-1, consisting of 12 of 16 parcels or approximately 75% of parcels in Sub-Unit E-1

Family Property Land owned by family since 1949 Dr. Fenton purchased the first 1-acre parcel at corner of Shields and Route 1 property in 1949 Dr. Fenton converted Ice Cream and Gift Shop to Animal Hospital of Penn Daw

Family Property Early 1950s, added extension for boarding animals

Family Property Acquired some of adjoining parcels in 1960s 1961 bowling lanes opened behind animal hospital Stone façade added to animal hospital in 1960s Bowling lanes closed 1980s Animal hospital closed in 1991

Family Property Dr. Fenton died in 1993 Property inherited by children Children added parcels to assemblage in 2000, 2001 Family Partnership formed, composed of children Tax Map (Figgins) under contract 2008

Current Uses St. Clair Appliances Equipment Storage Residential

Current Zoning Seven (7) parcels,* consisting of acres zoned R A *First seven parcels on Property Information Table

Current Zoning (contd) Five (5) parcels,* consisting of acres, zoned C B C A B *Last five parcels on Property Information Table

Current Comprehensive Plan Text All but one parcel currently in Sub-Unit E-1 Sub-Unit E-1 is planned for neighborhood- serving office and/or retail uses One parcel ( B) consisting of 1.0 acre is currently within Sub-Unit E-2, planned for residential

Comprehensive Plan Map All 12 parcels, except for , are designated mixed use by the map Parcel is designated residential at 3-4 units per acre

History of Planning at Kings Crossing Comprehensive Plan recognizes importance of community business center at Kings Crossing, U.S. 1 and South Kings Highway (Penn Daw CBC) Area IV, Page 32 – The opportunity exists on the east side of Richmond to create a large scale well designed mixed use development as a focal point and core area of the community business center.

Independent Studies Recommend Higher Density for Kings Crossing 1997 Report, Revitalization Analysis for Richmond Highway (Lesser & Co 1997) Kings Crossing business node singled out as likely first candidate for redevelopment -.8 F.A.R. recommended 2005 ULI Study, overcoming constraints Professional High Rise BRAC-related 3.0 F.A.R. BRAC Existing Conditions Report Lack of office space Need for hotels

Elements of this APR Nomination Continue neighborhood-serving office and/or retail comprehensive plan text designation Alter boundary between Sub-Unit E-1 and E-2 slightly so as to include an additional 1.0 acre parcel as neighborhood serving office and or retail Add hotel component Allow 1.0 F.A.R. for this substantial consolidation of Sub-Unit E-1 without consolidation with Unit G

Hotel with Retail 8-Story Office with Retail Two Alternative Designs, both consistent with planning of Kings Crossing for a High Density Business Node, that will act as a seed for like redevelopment

Benefits - 8 Story Office with Retail Consistent with historical planning for Kings Crossing business node as a catalyst for the development of other business nodes along Richmond Highway Consistent with office and retail mix 1997 Revitalization Study BRAC Existing Conditions Report 2005 ULI

Benefits - 8 Story Office with Retail Will provide needed offices for BRAC relocation Will provide retail to serve workers in offices, reducing vehicle trips Free shuttle service to Metro and incentives to use it will reduce vehicle trips Consistent with three independent studies, will concentrate density at Kings Crossing business node and will jump start similar development at other business nodes, and overcome image and other limitations

Benefits - Hotel Serves as need identified by BRAC Existing Conditions Report – pp. 46, Market study supports extended stay hotel The retail component of this plan provides a live/work node for extended stay residents reducing vehicle trips Applicant would commit to free shuttle service, further reducing vehicle trips

Why 1.0 FAR Without Consolidation of Land Units E-2, E-3 and G? History has shown that high density development desired at Kings Crossing will not occur in time to serve BRAC needs if consolidation with other land units for a mix of uses is required JPI Kings Crossing Rosenthal/JBG Economy in bad shape BRAC need is upon us. Cant wait for mere possibility of consolidated development of bigger area

Why 1.0 FAR Without Consolidation of Land Units E-2, E-3 and G? (contd) Larger area can develop in a coordinated way with this plan Shields Avenue compels coordinated development as a natural dividing line for land use mix on either side This land assemblage is already a substantial consolidation of Sub- Unit E-1, which is at the heart of the Kings Crossing business node

OFFICE SECTION MODEL View shed protected

Conclusion High Density Development at Kings Crossing consistent with historical planning efforts Office and Hotel uses are consistent with Planning and BRAC needs Office and Hotel uses can reduce vehicle trips, with commitments to free shuttle to Metro and other incentives Office and Hotel development can be accomplished with appropriate buffers Kings Crossing can serve as a catalyst for similar desired development in Richmond Highway corridor Consolidated development in greater area can occur through existing Planning and Zoning controls