Measure A Financial Oversight Committee August 7, 2013

Slides:



Advertisements
Similar presentations
Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Advertisements

18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Getting Caltrans to Approve Your Plans Basic Drainage Policies and Requirements Roy H. King, MS,PE California Department of Transportation Division of.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Mordecai Lincoln Dam & Hunters Pond, Scituate, MA
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
1 FEMA Flood Insurance Rate Map Update FEMA Public Meeting October 22, 2009.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to.
Ross Valley Flood Protection and Watershed Program Flood Zone 9 Advisory Board April 16, 2015 Flow Reduction Study Preliminary Results 1.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Water Conservation, Reuse & Storage Grant Program Application Review Team Meeting November 7, 2013.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee State Route 246 Passing Lanes.
Addressing the Sediment Problem in Sonoma Creek Watershed Rebecca Lawton 1, Deanne DiPietro 1, Laurel Collins 2, Arthur Dawson 1 1 Sonoma Ecology Center,
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
Oakcreek, Copperfield Court, and Coulee’s Crossing Area Flood Risk Management Project City of Fargo Oakcreek, Copperfield Court, and Coulee’s Crossing.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Problem Identification Meeting (50% Deliverable) February 10, 2009 AECOM, Inc. and A.D.A. Engineering, Inc.
Tempe Town Lake Downstream Dam Replacement NEW DAM ALTERNATIVES SELECTION January 5, 2012.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
Alameda Creek Watershed San Francisco Public Utilities Commission October 27, 2009.
Approve Humboldt Avenue Pedestrian and Bicycle Improvement Project Plans.
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
Stormwater Management
Town of Brighton, Department of Public Works
Four Winds Condominium Association August 2, 2017
City Council Meeting November 7, 2016
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Swamp Creek: Culvert Replacements
Project Status & Right-of-Way Acquisition
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Manchester’s CSO Program: A Look Behind and a Look Ahead
CITY OF LA PUENTE VALINDA COMMUNITY BIKEWAY PROJECT
The Oakton Condominium Association September 12, 2017
WEST & EAST DISTRICT PROJECTS PRESENTATION
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Pinole Creek Watershed Fish Passage Improvement Project
Roadway Focus Group Update
PPL1.6 Pumping Plant Project Overview
SE 12th Street Roadway Improvements February 8, 2005.
URBAN TRAIL PROJECT UPDATES
Monterey County Project Report for Measure X Expenditures
Design and Engineering Services
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
I Street Bridge Replacement Project
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Sacramento Environmental Commission January 2019.
City of Austin Watershed Protection Department CIP Project design/implementation Thank you for the opportunity to show the committee what the Watershed.
Greater Pittsburgh Airport Area Property
Presentation transcript:

Measure A Financial Oversight Committee August 7, 2013 Presented by: Kathleen Bradbury, Finance Director Hopper Creek Bank Erosion – downstream of Highway 29

Measure A Goals for Town of Yountville Flood Protection for the Town’s mobile home parks and surrounding areas Hopper Creek & Beard Ditch improvements and restoration for flood protection

Protecting Mobile Home Parks Floodwall constructed in 2005 – financed with a combination of Town Funds, grant money and Measure A funding

Protecting Mobile Home Parks Partially financed through bank lease purchase agreement which will be repaid in full February 2018, at the same time the flood tax sunsets

Protecting Mobile Home Parks December 2005 flood looking southeast toward Napa River

Floodwall Lease – Lowered Interest Rate Floodwall Lease Purchase – part fixed interest rate and part variable interest rate Variable rate scheduled to reset to an indexed rate 2/1/2014 Negotiated new fixed rate with bank for remainder of the lease – lowering rate by 1% from 2.95% to 1.95% This will save approximately $20,000 over the remainder of the lease – freeing those funds up to be used for approved projects

Flood Protection - Hopper Creek & Beard Ditch Beard Ditch Bank Repair Completed in 2012

Flood Protection - Hopper Creek & Beard Ditch Hydrologic / Hydraulic Study of Hopper & Hinman Creeks Phase II – Alternatives Analysis completed in 2011 Study area – 8.49 square miles of watershed Developed detailed, calibrated model to conduct analyses Results used to prioritize projects by ranking alternatives by cost per total reduction in peak outflow

Watershed Study Area

Summary Results of Hydrologic / Hydraulic Study The study predicted no road overtopping during the 24-hour, 2-year design storm The existing capacities of the crossings in Town at both Hopper & Hinman Creeks are sufficient to pass the 2-year design storm Deficient and insufficient to pass the 24-hour, 100-year design flows: The crossings downstream of: Pedestrian Bridge on Hopper Creek (near Forrester Lane) Finnell Road Mulberry Street Oak Circle Mission Street Crossings between California Drive and Solano Avenue on Hinman Creek The study can be found on the Town’s website @ www.townofyountville.com – go to Departments/Services/Public Works

Initial Project Ranking

Flooding on Mulberry Street

Flooding on Oak Circle

Post-Study / Pre-Construction – Moving Forward October 2012 conducted interviews with the top three companies that submitted proposals to design the flood control projects. Interview panel included: Phillip M. Miller, Napa County Deputy Director of Public Works Leigh Sharp, Executive Director of Napa County Resource Conservation District Town staff Selected GHD of Santa Rosa November 2012, the Town Council approved an agreement for $725k with GHD for design, environmental clearance, permitting and construction support services for flood reduction improvements on Hopper Creek

Map of Project Area

Finnell Storm Drain

Proposed Projects Improvements to the 3-weir facilities to reduce flows to Forrester Lane and increase flows down the grassy swale with enlargement of the culverts under Vista Drive Construct a box culvert under Finnell Road between Hopper Creek and Beard Ditch Construct a creek bank stabilization project on Hopper Creek between Highway 29 and Washington Street Reconstruct the path along the east side of Hopper Creek that is parallel to and west of Heather Street to provide more area for floodwaters and a potential sedimentation trap Create creek sedimentation traps at one or more locations on Hopper Creek including upstream of the Highway 29 culvert, the 3-weir diversion structure and south of Mulberry Street Construct a creek bank stabilization project on a few hundred feet of the Villagio Channel between Highway 29 and Vintage 1870

Public Information Meeting Monday - August 12 at 6 pm Yountville Community Hall 6516 Washington Street The projects will not stop flooding from the Napa River, however they will reduce the more frequent flooding from Hopper Creek and the amount of sediment removed from Hopper Creek every few years. Before Town staff and consultants begin the environmental studies, permit applications and final design, people are invited to comment on the preliminary designs so concerns can be addressed when it is most practical to do so. If you have any questions, please contact: John Draper, Contract Civil Engineer : jdraper@yville.com or 948-2602 Graham Wadsworth, Public Works Director/ Town Engineer: gwadsworth@yville.com or 948-2628.

Measure A Financial Oversight Committee August 7, 2013 COMMENTS OR QUESTIONS?