P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot

Slides:



Advertisements
Similar presentations
Doc.: 11-10/895r3 Submission July 2010 Dee Denteneer (Philips), Bruce Kraemer (Marvell) Slide 1 P802.11s Report to EC on Conditional Approval to go to.
Advertisements

Doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11ae Report to EC on Conditional Approval to go.
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0287r6 Submission March 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to Sponsor.
P802.11ah Report to EC on Conditional Approval to go to Sponsor Ballot
Doc.: IEEE /0287r0 Submission February 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to.
Doc.: Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
xxxx doc.: IEEE /xxxxr0 March 2017
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
HTC 34; 5656 AE Eindhoven, the Netherlands
P802.11z conditional approval report to ExCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
TGs San Diego Closing Report
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
HTC 34; 5656 AE Eindhoven, the Netherlands
November 2010 doc.: IEEE /0872r4 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Closing Report Los Angeles, CA, US 802 Interim
November 2008 doc.: IEEE /1437r1 November 2010
November 2008 doc.: IEEE /1437r1 August 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2011
P802.11aq Report to EC on approval to forward draft to RevCom
TGs San Diego Closing Report
Presentation transcript:

P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot July 2009 doc.: IEEE 802.11-08/xxxxr0 July 2010 P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot Authors: Name Affiliation Address Phone email Dee Denteneer Philips HTC 34; 5656 AE Eindhoven, the Netherlands +31 40 2749743 Dee.denteneer@philips.com Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA 95054 +1 (321) 427-4098 bkraemer@marvell.com Dee Denteneer (Philips), Bruce Kraemer (Marvell) Menzo Wentink (Qualcomm), Bruce Kraemer, Marvell

July 2009 doc.: IEEE 802.11-08/xxxxr0 July 2010 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11s Draft 7.0 to Sponsor Ballot. This document (11-10/0895r0) was approved during the closing plenary session of the 802.11 working group on 16 July 2010. Passed in the Task Group yes 7, no 0, abstain 0 Passed in the Working Group yes , no , abstain Dee Denteneer (Philips), Bruce Kraemer (Marvell) Menzo Wentink (Qualcomm), Bruce Kraemer, Marvell

TGs draft text stability November 2008 doc.: IEEE 802.11-08/1437r1 July 2010 TGs draft text stability 350 5.0 6.0 4.0 # pages 300 2.0 1.0 250 3.0 200 Jun-10 July-06 April-08 Mar-09 Dec-09 Mar-10 Dee Denteneer (Philips), B.Kraemer (Marvell) Bruce Kraemer, Marvell

802.11 WG Letter Ballot Results – P802.11s July 2009 doc.: IEEE 802.11-08/xxxxr0 July 2009 802.11 WG Letter Ballot Results – P802.11s Ballot ID Ballot Close Date Title Ballot Type Pool Return %Return Abstain %Abstain Approve Disapprove %Approve 147 04 May 2009 Technical Letter Ballot for Draft 3.0 Technical 248 201 81 34 17 132 35 79 159 08 January 2010 First Recirculation Ballot for Draft 4.0 Recirculation 210 85 33 16 150 27 161 15 April 2010 Second Recirculation Ballot for Draft 5.0 32 15 19 89 165 28 June 2010 Third Recirculation Letter Ballot for Draft 6.0 157 20 Response to Draft 6.0 and its comment resolutions* 92 *, during the San Diego meeting, 5 members indicated satisfaction with the Draft and their intent to vote yes on the next recirculation Dee Denteneer (Philips), Bruce Kraemer (Marvell) Menzo Wentink (Qualcomm), Bruce Kraemer, Marvell

802.11 WG Letter Ballot Results – P802.11s July 2009 doc.: IEEE 802.11-08/xxxxr0 July 2009 802.11 WG Letter Ballot Results – P802.11s Ballot ID Ballot Close Date Title Ballot Type Number of comments 147 04 May 2009 Technical Letter Ballot for Draft 3.0 Technical 1196 (T778, E418) 159 08 January 2010 First Recirculation Ballot for Draft 4.0 Recirculation 809 (T449, E360) 161 15 April 2010 Second Recirculation Ballot for Draft 5.0 421 (T271, E150) 165 28 June 2010 Third Recirculation Letter Ballot for Draft 6.0 253 (T252, E101) Dee Denteneer (Philips), Bruce Kraemer (Marvell) Menzo Wentink (Qualcomm), Bruce Kraemer, Marvell

Unsatisfied comments by commenter* November 2008 doc.: IEEE 802.11-08/1437r1 Unsatisfied comments by commenter* July 2010 Voter LB147 LB159 LB 161 LB165 Benveniste 3 Bumiller 5 Cam-Winget 16 Chan 2 Ecclesine 1 Erceg 6 Hart 7 Montemurro 9 Myles Ptasinski 4 Roy Stacey Stephenson Wang, Qi Wentink 11 Total 38 12 27 Statistics on unsatisfied comments incorporate feedback gathered during the San Diego session as collected in the back up slides Dee Denteneer (Philips), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Unsatisfied Comments – Topics July 2009 doc.: IEEE 802.11-08/xxxxr0 July 2010 Unsatisfied Comments – Topics Topic LB147 LB159 LB161 LB165 Frame formats 6 3 General/Editorial 5 Power Management 1 Reservation 2 Mac-various 4 Routing Security-various 14 Security-Base 20 Total 38 12 27 Dee Denteneer (Philips), Bruce Kraemer (Marvell) Menzo Wentink (Qualcomm), Bruce Kraemer, Marvell

Unsatisfied comments July 2010 doc.: IEEE 802.11-08/xxxxr0 July 2010 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. Dee Denteneer (Philips), Bruce Kraemer (Marvell) Menzo Wentink (Qualcomm), Bruce Kraemer, Marvell

TGs Timeline Open Close Fourth recirculation (TGs draft 7.0) 24-Jul-10 July 2010 Open Close Fourth recirculation (TGs draft 7.0) 24-Jul-10 8-Aug-10 Clean recirculation (TGs draft 7.0) Professional editing + MEC 13-Sep-10 Pool formation 17-July-10 2-Sep-10 First sponsor ballot 11-Oct-10 10-Nov-10 Second sponsor ballot 13-Dec-10 12-Jan-11 Third sponsor ballot 24-Jan-11 13-Feb-11 Fourth sponsor ballot 14-feb-11 1-Mar-11 Fifth sponsor ballot 2-Mar-11 12-Mar-11 EC to RevCom Jul-11 RevCom to SB Sep-11 Dee Denteneer (Philips), Bruce Kraemer (Marvell)

November 2008 doc.: IEEE 802.11-08/1437r1 July 2010 802.11 EC Motion – <agenda item#> Conditional Approval to send P802.11s to Sponsor Ballot Grant conditional approval to forward P802.11s to Sponsor Ballot. Moved: Bruce Kraemer 2nd: <name> Yes No Abstain Working Group 11 vote on the Motion Passed: xx y, x n, x a D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

BACK UP SLIDES July 2010 November 2008 doc.: IEEE 802.11-08/1437r1 D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Responses received indicating a change of vote November 2008 doc.: IEEE 802.11-08/1437r1 July 2010 Responses received indicating a change of vote Stephen McCann [smccann@rim.com] I would like to inform you that my comment (CID 4106) from LB165 has now been satisfied and subsequently I would like to change my vote to “Approve” Walker, Jesse [jesse.walker@intel.com] . Mark that I am satisfied with the resolutions of all. Thanks.  Matthew Fischer [mfischer@broadcom.com] I wish to change my vote to YES. liwen chu [liwenchucn@gmail.com] I am OK with the resolutions of my comments. So I will vote Yes to the new 802.11s draft. Dan Harkins [dharkins@arubanetworks.com] I am satisfied with resolution of all of my comments (assuming my motion to address the remainder of them passes) and I will change my No vote to a Yes. D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Responses received indicating acceptance of some of the resolutions July 2010 Responses received indicating acceptance of some of the resolutions benveniste@ieee.org I accept the resolutions to the 5 comments listed below Qi Wang [qi.wang@broadcom.com].  I am satisfied at the resolutions to my LB165 comments, as recorded in the document 2010/725R6.  Dave Stephenson (daves) [daves@cisco.com] 11-10-0726r2 satisfactorily resolves my two comments, CIDs 4165 and 4170 Dee Denteneer (Philips), Bruce Kraemer (Marvell)