Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.

Slides:



Advertisements
Similar presentations
1 Wyoming Infrastructure Authority November 10, 2009 Superconductor Electricity Pipelines.
Advertisements

Washington DC October 2012 A Vision for an Advanced Supervision and Control System for the Electric Grid Ramón A. León XM S.A. E.S.P Colombia.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Brief on HVDC 2015 Brief on HVDC 2015
The Integration of Renewable Energy onto the Existing Grid Dr Norman MacLeod Technical Director, HVDC.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
By Lauren Felton. The electric grid delivers electricity from points of generation to consumers, and the electricity delivery network functions via two.
Supergrid Modelling for the Indian Subcontinent Farhan Beg Global Energy Network Institute With Inputs from Mr. Peter Meissen and Mr. Paul Michael Dekker.
1 Smart Distribution Systems: Sustainability Issues S. S. (Mani) Venkata Alstom Grid and University of Washington (UW)
© ABB Group August 7, 2015 | Slide 1 Variable Shunt Reactors Optimize Transmission Systems Dr. Claes Bengtsson, Global Product Manager, Reactors. PowerGen.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
High Voltage Power Electronics Technologies for Integrating Renewable Resources into the Grid RenewElec Workshop Carnegie Mellon University October 22,
Lunch & Learn Project Presents to you: “The Electric Power Grid” By: Dexter Hypolite Electrical Engineer VIWAPA.
(Associate Professor)
The SEC Power Forum Wolfgang Braun CEO Energy Transmission Middle East, SIEMENS Session IV: Opportunities in Transmission & Distribution Related Industries.
Year 2006 Report “Better” Managed and Controlled Transmission Grids using Advanced Technological Concepts Aty Edris EPRI Power Delivery & Markets
TRANSMISSION SYSTEM KERALA K ASOKAN DIRECTOR INSTITUTE FOR SUSTAINABLE DEVELOPMENT AND ENERGY STUDIES (InSDES)
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Prepared by Dr. ML Chan, ML Consulting Group, USA & Mr. Yimin Wang, State Grid Corporation of China,
Smart Grid in Transmission Engineering Cell, GETCO, Vadodara.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
1 Electrical Energy Transmission by High-voltage Direct Current (HVDC) and Prospects for an Electrical Market Mohamed Lakhdar HABIB and Rime BOUAROUDJ.
THE TRES AMIGAS SUPERSTATION IIEA - Dublin October 8, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
DC Superconductor Cables for Long Distance Transmission 2009 Mid-America Regulatory Conference Traverse City, MI June 14-17, 2009.
1 The Tres Amigas SuperStation VLPGO November 2011.
Smart Power Generation in Jordan, IPP3 and IPP4 Case study.
Using a Dispersed Strategy in Your Region By Mike Michaud Matrix Energy Solutions Edited and Presented By Brian Antonich Windustry.
Sanjay Garg General Manager PGCIL/ Ministry of Power
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
20th Century Electric Transmission Grid
THE TRES AMIGAS SUPERSTATION ABB Western Utility Executive Conference September 28, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
SMART GRID A smart grid for intelligent energy use. By: Suhani Gupta.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Overall National Grid Development: Constraints & Options
© ABB Power Technologies :\PTP\GF-CC\Arbetsmaterial Jan-16 HVDC Light – ABB’s technology for invisible transmission Per Haugland Head of ABB Power.
Smart Grid Schneider Electric Javier Orellana
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Full Converter Wind Turbine Operating under Weak Grid Conditions Daniel Mueller, Walter Kuehn Frankfurt University of Applied Sciences Germany 1.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
HVDC Transmission.
RECENT TRENDS IN POWER SYSTEMS
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
1 The Tres Amigas SuperStation Low Carbon Summit October 22, 2011.
 The common type of wind power generators are squirrel cage induction generator (SCIG),doubly fed induction generator (DFIG)  For more secure and.
Workshop February 4, Idaho Power Smart Grid Vision At Idaho Power, our smart grid vision remains focused on seven major characteristics : 1.Enhance.
PS ERC EC Meeting Systems Stem New Research Initiatives.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Introduction to Electric Power System and A. C. Supply
A Project Review On POWER QUALITY IMPROVEMENT IN GRID USING STATECOM
IG BASED WINDFARMS USING STATCOM
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
IN ADDITION OF UI RATE CORROSPONDING TO FREQUENCY OF 49
Challenges of integrating Variable Renewable Energy Sources (V-RES)
Network Innovation Allowance Project: South East Smart Grid
EE6501 POWER SYSTEM ANALYSIS
Building a Sustainable Energy Future
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024Low Power Wide Area Network.
India Smart Grid Week, 2016 Yogendra Patwardhan
Opportunities in the Changing Energy System
EU-IPA12/CS02 Development of the Renewable Energy Sector
Module 4 Smart Grid Implementation Issues
Karen Bartleson, President, IEEE Standards Association
HVDC Transmission Systems:
Jakov Chavez Vega Kalle Valtavirta
Gordon van Welie, President & Chief Executive Officer
Meeting the challenge: Electrification and Climate Change
Presentation transcript:

Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018

Planned Growth of Transmission Network in India Ref. National Electricity Plan – Transmission by Central Electricity Authority - 2016 Edit Presentation Title in [Insert Tab > Header & Footer] | 8 November 2018

Evolution of the Grid – HVDC Contribution Chandrapur 2 x 500 MW 1997 Visakhapatnam 500 MW 1999 Sasaram 500 MW 2002 Vindhyachal 500 MW 1989 Vindhyachal 500MW, 70kV B-to-B Asynchronous link W-N regions Chandrapur 2 x 500MW, 200kV B-to-B W-S regions Visakhapatnam 1 x 500MW, 200kV B-to-B E-S regions Sasaram E-N regions Edit Presentation Title in [Insert Tab > Header & Footer] | 8 November 2018

Evolution of the Grid - India Edit Presentation Title in [Insert Tab > Header & Footer] | 8 November 2018

Issues in Transmission Network Utilization of existing resources and systems to the maximum extent Transmission of bulk power over long distances efficiently Severe Right of Way constraints Uncertainty in Generation Control of flow of power Stability The world is moving towards a global energy market – create need for national and international grid interconnections Edit Presentation Title in [Insert Tab > Header & Footer] | 8 November 2018

Transmission Requirements Meet system requirements – active and reactive power during variations in load demand and contingencies Option of up-gradation / allow implementation in stages Transfer of allocated power with margins / long-term contractual requirement High Availability & Reliability Low cost to consumers

Uneven Distribution of Energy Sources Edit Presentation Title in [Insert Tab > Header & Footer] | 8 November 2018

Uneven Distribution of Energy Sources Energy Resources confined mostly to Eastern Region and NE Region and Load Centers in Western, Southern and Northern Regions, hence bulk power transmission over long distance. Future Solution: Long Distance HVDC Projects, like Champa-Kurukshetra Parallel HVDCs and FACTS devices to enhance existing network capability and resolve stability issues. Edit Presentation Title in [Insert Tab > Header & Footer] | 8 November 2018

Right of Way Issue The most challenging issue with the transmission sector is the Right of Way (ROW), high intensity transmission corridor (MW per meter ROW) is needed. Visual impact of sub-transmission network on big cities with densely populated urban areas, demands underground cable power transmission. Future Solution: More high Voltage Multi-Circuit AC transmission corridors (1200kV/765kV) and Long distance HVDC transmission, to reduce the ROW requirement. TCSC installation, to increases the power transfer capability as well as to improve system stability with existing network. Compact Sub-stations – GIS. VSC HVDCs for cities infeed, hence no ROW required and no visual impact. Edit Presentation Title in [Insert Tab > Header & Footer] | 8 November 2018

Right of Way Issue 1850MVA 5550MW AC DC 1850MW DC Edit Presentation Title in [Insert Tab > Header & Footer] | 8 November 2018

Power Regulation and Network Stability Due to increase in the complexity in power transmission network, stability and power regulation is issues difficult to handle. Future Solution: More long Distance and B-B HVDC Inter- Regional Links. FACTS devices and Phase Regulating Transformers to utilize the existing assets to the fullest extent as well as regulate the power in a particular direction Edit Presentation Title in [Insert Tab > Header & Footer] | 8 November 2018

Power Regulation and Network Stability Edit Presentation Title in [Insert Tab > Header & Footer] | 8 November 2018

Protect, Control, Monitor INDIA – unifieD real-time dynamic state MEASUREMENTS (URTDSM) – Grid SECURITY World’s largest grid Wide Area Monitoring System. Solution provided gives a view of the real-time state of the network power flow, allowing  to take preventive actions and ensuring grid stability 1,300 MiCOM P847 Phasor Measurement Units (PMU), to collect over 18,000 real-time synchronised measurements from 351 substations across the country. e-terraphasorpoint in 34 control centres at existing National, Regional and State Load Dispatch sites Protect, Control, Monitor Edit Presentation Title in [Insert Tab > Header & Footer] | 8 November 2018

Renewable Energy Growth Ref. National Electricity Plan – Transmission by Central Electricity Authority Edit Presentation Title in [Insert Tab > Header & Footer] | 8 November 2018

Renewable Energy Growth Increasing penetration of renewable energy, wind, solar etc. is challenge for transmission and sub- transmission network. Integration of these intermittent energy sources in Grid is a challenge. Planning of power flow network, because of intermittent nature of energy. Future Solution: VSC HVDCs to integrate these sources into Grid, to comply with grid codes, hence better power quality and reliability. Integrated system planning is required and not the earlier generation evacuation system planning Edit Presentation Title in [Insert Tab > Header & Footer] | 8 November 2018

Integrated Power System Network - Present Edit Presentation Title in [Insert Tab > Header & Footer] | 8 November 2018

Distributed Power System Network - Future Edit Presentation Title in [Insert Tab > Header & Footer] | 8 November 2018