P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot

Slides:



Advertisements
Similar presentations
Doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11ae Report to EC on Conditional Approval to go.
Advertisements

Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0287r6 Submission March 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to Sponsor.
P802.11ah Report to EC on Conditional Approval to go to Sponsor Ballot
Doc.: IEEE /0287r0 Submission February 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to.
Doc.: IEEE /1437r0 Submission Nov 2008 Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam) Slide 1 Précis of P802.11n Report.
Doc.: Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 1 July 2009 Plenary Presentation from WG11 to 802 EC Date: Authors:
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
xxxx doc.: IEEE /xxxxr0 March 2017
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z conditional approval report to ExCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
July 2010 Closing Plenary Motions
TGn Closing Report Los Angeles, CA, US 802 Interim
November 2008 doc.: IEEE /1437r1 August 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
Mar 2010 Closing Plenary Motions
Mar 2010 Closing Plenary Motions
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
July 2009 Closing Plenary Motions
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2011
P802.11aq Report to EC on approval to forward draft to RevCom
May 2010 Closing Plenary Motions
Presentation transcript:

P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot Month Year doc.: IEEE 802.11-yy/xxxxr0 July 2009 P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot Date: 2009-07-15 Authors: Lee Armstrong, Armstrong Consulting, Inc. John Doe, Some Company

Month Year doc.: IEEE 802.11-yy/xxxxr0 July 2009 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to forward P802.11p to Sponsor Ballot. Revision 2 of this document (11-09/0871r2) was approved during the closing plenary session of the 802.11 working group on 17th July 2009. Passed in the Working Group by 44, 0, 6 Lee Armstrong, Armstrong Consulting, Inc. John Doe, Some Company

TGp draft text stability 80 70 1.0 Superfluous Descriptive text removed 60 2.0 50 3.0 5.0 6.0 7.0 4.0 # pages 40 30 20 10 Jan-06 Sept-06 Jun-07 Mar-08 Jan-09 Jul-09

802.11 WG Letter Ballot Results – P802.11p July2009 802.11 WG Letter Ballot Results – P802.11p BallotID Ballot Close Date Title BallotType Pool Return %Return Abstain %Abstain Approve Disapprove %Approve 125 May 03 2008 Recirculation Letter Ballot for IEEE 802.11p_D4.0 Technical 234 205 87.6 32 15.6 136 37 78.61 141 Dec 05, 2008 Recirculation Letter Ballot for IEEE 802.11p_D5.0 Recirculation 232 210 90.5 35 16.7 149 26 85.1 144 Mar 31, 200 Recirculation Letter Ballot for IEEE 802.11p_D6.0 211 91.0 29 13.7 161 20 88.95 151 Jun 13, 2009 Recirculation Letter Ballot for IEEE 802.11p_D7.0 91 12.3 158 27 85.41 Lee Armstrong, Armstrong Consulting, Inc.

802.11 WG Letter Ballot Comments – P802.11p Ballot ID Ballot Close Date Title Ballot Type Number of Comments received 125 3 May 2008 Technical Letter Ballot for Task Group-p Draft 4.0 Technical 489 (332T, 157E) 141 5 Dec 2008 Recirculation Letter Ballot for Task Group-p Draft 5.0 Recirculation 221 (138T, 83E) 144 31 Mar 2009 Second Recirculation Ballot for Task Group-p Draft 6.0 249 (144T, 105E) 151 13 Jun 2009 Third Recirculation Ballot for Task Group-p Draft 7.0 180 (85T, 95E)

Unsatisfied comments by commenter Voter LB125 LB141 LB144 LB 151 Total Adachi, Tomoko 7 4 1 12 Amann, Keith 3 Barr, John R. Bumiller, George Durand, Roger P 5 2 Ecclesine, Peter 6 14 Engwer, Darwin Erceg, Vinko Fischer, Matthew J 10 Inoue, Yasuhiko Kobayashi, Mark Malarky, Alastair Malinen, Jouni McCann, Stephen Subtotal (this page) 17 11 18 21 67

Unsatisfied comments by commenter Voter LB125 LB141 LB144 LB151 Total Montemurro, Michael 1 2 3 Myles, Andrew Perahia, Eldad 6 9 17 Roy, Richard 16 8 13 5 42 Stephens, Adrian Stephenson, Dave 24 Thomson, Allan 4 Yang, Zhiyu Subtotal 37 14 12 100 Total (both pages) 54 25 53 34 167

Unsatisfied Comments – Topics Clause 5 – General Description 13 Clause 7 – Frame formats 56 Clause 9 - MAC Sublayer 7 Clause 10 – Layer Management 6 Clause 11 - MLME 12 All others 73 Total 167

Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved during working group ballot may be found in document: 11-09-0908-02, a copy of this is attached. Double click on the icon to the right to open this. A copy of the unsatisfied comments presented using MyBallot access database report format is attached.

TGp Timeline Fourth recirculation (TGp draft 8.0) Open 28-Jul-09 Close 12-Aug-09 Clean recirculation (TGv draft 8.0) 24-Sep-09 14-Oct-09 Pool formation 15-Aug-09 29-Sep-09 First sponsor ballot 23-Oct-09 22-Nov-09 Second sponsor ballot 7-Feb-10 22-Feb-10 Third sponsor ballot 5-Apr-10 20-Apr-10 Fourth sponsor ballot 20-May-10 3-Jun-10 EC to RevCom Mar-10 (cond.) or Jul-10 RevCom to SB Jun-10 or Sep-10

November 2008 doc.: IEEE 802.11-08/1437r1 July 2009 802.11 EC Motion – <agenda item#> Conditional Approval to send P802.11p to Sponsor Ballot Grant conditional approval, under Clause 13 to forward P802.11p to Sponsor Ballot. P802.11p had a 85.41% approval on the last WG Recirculation Ballot. Working Group 11 vote on the Motion Passed: <for> y, <against> n, <abstain> a Moved: Bruce Kraemer 2nd: <name> Yes No Abstain Lee Armstrong, Armstrong Consulting, Inc.) Bruce Kraemer, Marvell