Bond Construction Update Citizens Oversight Committee Long Beach Community College District July 21, 2008 BUILDING TOMORROW TODAY 1.

Slides:



Advertisements
Similar presentations
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Advertisements

Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Facilities Improvements and Bond Construction Update Facilities Advisory Committee Long Beach Community College District December 2, 2008 EDUCATE ENGAGE.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 21, 2008 BUILDING TOMORROW TODAY Cordoba Corporation.
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1.
MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
ABC Technology Project
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Geoexchange at CMU Regional public higher education institution 3 campuses in Grand Junction, CO. Main campus 78 acres and 1.5 million s.f. under.
August 2008 WATCH YOUR STEP! CONSTRUCTION PROJECTS UNDERWAY!
Draft FMP Priorities For Discussion Facilities Committee 3/5/13.
OE 13 OE OE13OE13OE13OE13 O 13. FACILITIES PLANNING AGENDA OE-13 I.Review April 2013 Study Session II. Current Projects Review III. Bond Funds and Projects.
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District November 1, 2007 BUILDING TOMORROW TODAY Cordoba Corporation.
VOORBLAD.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation.
© 2012 National Heart Foundation of Australia. Slide 2.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Bond Program Planning Imperatives Study Session October 12, 2004.
Marin Community College District CIP Briefing – Citizen’s Oversight Committee September 13, 2005.
Week 1.
We will resume in: 25 Minutes.
PSSA Preparation.
BOND PROGRAM UPDATE Long Beach Community College District Citizens’ Oversight Committee Meeting October 11, 2004.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
BOND PROGRAM UPDATE Building Tomorrow Today Long Beach Community College District Citizens’ Oversight Meeting October 9, 2006.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 31, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 19, 2009 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District July 20, 2009 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District August 8, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 25, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 25, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 25, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 2, 2008 BUILDING  TOMORROW  TODAY 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 14, 2010 EDUCATE  ENGAGE  EMPOWER 1.
BOND PROGRAM UPDATE Building Tomorrow Today Long Beach Community College District The Long Beach Rotary Flex Day,March 28, 2007 Flex Day, March 28, 2007.
BOND PROGRAM UPDATE Long Beach Community College District Board of Trustees Meeting July 13, 2004.
Bond Construction Update Citizens’ Oversight Committee Long Beach Community College District January 28, 2008 BUILDING  TOMORROW  TODAY Cordoba Corporation.
BOND PROGRAM UPDATE Long Beach Community College District Citizens’ Oversight Committee Meeting July 12, 2004.
Facilities Improvements and Bond Construction Update Facilities Advisory Committee Long Beach Community College District Septmeber 24, 2009 EDUCATE  ENGAGE.
Paradise Valley Community College CLC Update Jacalyn A Askin, Vice President of Administrative Services May 8, 2009.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 1,
Bond Construction Update Facilities Advisory Committee Long Beach Community College District November 17, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District October 24, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
 Board of Trustees Meeting June 25,  Topics of Discussion 1. District 5-Year Construction Plan 2. Cost Components of Construction 2.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District July 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District March 3, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Measure G Bond Projects. Message from the President ….. Monument Refurbishment Project.
MIRACOSTA COMMUNITY COLLEGE DISTRICT
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
Facilities Modernization Program
Recent Bond Accomplishments
Presentation transcript:

Bond Construction Update Citizens Oversight Committee Long Beach Community College District July 21, 2008 BUILDING TOMORROW TODAY 1

Agenda Completed Construction Projects Current & Upcoming Construction Projects LAC South Quad Complex LAC Central Plant LAC Learning Resources Center LAC Building A, Student Services LAC Math Technology Building PCC Central Plant PCC Learning Resources Center PCC Industrial Tech Phase 1 PCC MDAB (Multi-Disciplinary Academic Building) LAC/PCC Building Needs Assessment Project Toilet Improvement Projects Quick-Start Projects ADA Projects Lighting Projects Classroom Improvement Projects Infrastructure Projects Facilities Improvements Q & A 2

Current and Upcoming Construction Projects Central Plant equipment, Public Safety, & Field house for Athletics Installed (2) 600 ton Chillers and (1) 300 ton chiller with room for expansion Installed 4 cooling towers with additional expansion space LAC Central Plant 3

Current and Upcoming Construction Projects Plant ready for operation and awaiting completion of SQC Construction 96% Complete Completion Anticipated Summer 2008 LAC Central Plant 4

Current and Upcoming Construction Projects Construction 70% Complete Adds 10,000 ASF to existing building Substantial Completion anticipated December 2008 LAC/Learning Resources Center 5

Current and Upcoming Construction Projects Construction Approx. 62% Complete Space includes Approx. 68,000 ASF 32 modern classrooms and labs 38 faculty offices Executive office suites Multipurpose room State of the art Board Room Substantial Completion Anticipated December 2008 South Quad Complex 6

Current and Upcoming Construction Projects Martinez Architects received Board Approval as the Architect of Record Programming work began on April 10, 2008 Completed Schematic Design (June 2008) Currently in Design Development phase Adds 4000 ASF to existing building Will house A&R, Counseling, Health Services, Cashier, Transfer Ctr., etc. LAC Building A – Student Services Retrofit 7

Current and Upcoming Construction Projects Marlene Imirzian & Associates Architects received Board Approval as the Architect of Record Will house Math and Culinary Arts instructional program as well as Reprographics LAC Math Technology Building 8

Current and Upcoming Construction Projects Programming work began in May 2008 Completed Schematic Design (June 2008) Currently in Design Development phase FPP was approved by Board of Trustees and sent to state LAC Math Technology Building 9

Current and Upcoming Construction Projects LAC Math Technology Building Currently completing Design Development Phase 10

Current and Upcoming Construction Projects Houses Central Plant equipment and Maintenance and Operations facility Installed (3) 300 ton Chillers Installed 3 cooling towers Will support LRC Construction Approximately 67% Complete Completion Anticipated late Summer 2008 PCC Central Plant 11

Current and Upcoming Construction Projects Construction 97% Complete Modern Facility with Computer Lab and Multimedia Stand alone Data Center. Provides District IT redundancy Bridge to Bldg. EE Design elements move towards energy efficiencies Substantial Completion July 2008 PCC Learning Resources Center 12

Current and Upcoming Construction Projects Replaces Existing Antiquated Structures Construction is 25% Complete Modern Facility Houses Machine Tool and Welding Departments New Northern Face of the Campus Completion Anticipated Spring 2009 PCC Industrial Technology Center Phase 1 13

Current and Upcoming Construction Projects Programming is completed and submitted to the State for Approval Completed Schematic Design and Design Development phase (June 2008) Currently working on Construction Documents and Furniture Layouts Anticipated start of construction Summer 2009 Completed in Two phases PCC Multi-Disciplinary Academic Building (MDAB) 14

PCC - LRC and MDAB (Fly-By) p a c i f i c c o a s t 15

Current and Upcoming Construction Projects Restroom Improvement Projects Quick-Start Projects ADA Projects LAC/PCC Building Needs Assessment Project 16

Current and Upcoming Construction Projects Lighting Projects Classroom Improvement Projects Infrastructure Projects LAC/PCC Building Needs Assessment Project 17

Recently Completed Facilities Improvements Long Beach Community College District 18

Facilities Improvements LBCC With the help of LBCC Foundation, funds were available to do the following: carpet replacement carpet added to the walls to ensure light-control for observational needs. AC unit independent from the building HVAC system was added to serve the server room, for proper load ventilation. New observation seats were installed. entire room painted new lighting installed. Completed 06/2008 Building D Planetarium Improvements 19

Facilities Improvements LBCC Replace existing boilers, pumps, expansion tanks and common flue with new equipment. A newly upgraded design reflecting a mechanical engineered system was installed improving the efficiency of the boilers. This system is the main heating source serving the Auditorium. Completed 06/2008 Building J Boiler Replacement 20

Facilities Improvements LBCC Replacement of roofs with a 30- year Garland roof materials Removal of radio tower on Bldg B Expected Completion 07/2008 Building B, C, and D Roof Replacement 21

Facilities Improvements LBCC Economic Resource Development Complete build out of two-hard walled offices, a kitchenette, and a server room Relocation of a 4,000sq. ft. office space into the newly re-designed 3,000sq ft. office space New modular cubicle work stations were adapted and installed Completed 05/2008 ERD Tenant Improvements and Relocation 22

Facilities Improvements LBCC Building Needs Assessment Project Parking Structure/Traffic Study Master Landscape Project District Wide Energy Efficiency Improvements Electronic Signage Wayfaring and Building Signage Facilities Website Facilities Work Order System Buildings M & N Replacement at LAC Building G at PCC Modernization of Building P at LAC (IPP) Replacement of Building M (Construction Trades) at PCC (IPP) Important Ongoing Initiatives 23

QUESTIONS & ANSWERS BUILDING TOMORROW TODAY 24