MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.

Slides:



Advertisements
Similar presentations
Piedmont Improvement Program NC Society of Engineers
Advertisements

Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.
Dulles Corridor Metrorail Project Status Update Fairfax County Transportation Advisory Commission November 16, 2010 Richard Stevens Fairfax County Department.
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
1 I-95/395 HOV/Bus/HOT Lanes April Current Status Project Sections Military Corridor Improving Transit & HOV Other Issues Agenda 2.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
2008 MTA NYC Travel Survey Summary of Selected Results June 22, 2009.
R O A D U S E R F E E T A S K F O R C E 1 OREGONS TRANSPORTATION FUNDING CHALLENGE.
April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel.
Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
From I-24 (MP 44) to I-64 (MP 92) is 48 miles ADT 2009 ADT = 30,000 vehicles per 2.2% growth rate 2030 ADT = 48,000 vpd 2009 Average Daily Truck.
Coalfields Expressway & ADHS Corridor Q
1 Item 11, Presentation to the TPB, September 15, 2010.
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
Gateway Corridor Alternatives Analysis Findings Metropolitan Council Transportation Committee November 26, 2012.
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
CALTRANS - SIDUE California-Baja California Border Master Plans August 1, 2012.
1 March 14, 2013YMPO RTP Technical Advisory Committee Meeting.
Titusville to Edgewater Bike Loop PD&E Study
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
New I-65 Interchange at Worthsville Road Welcome!.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
DRAFT 2009 Long Range Transportation Plan Highway Projects August 11, 2009.
Longmeadow Parkway Fox River Bridge Corridor
AASHTO Sub Committee Internal and External Audit Todd Long, P.E. August 10 th, 2014.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
Congressional District Projects New CD-7 North I-25 Record of Decision (ROD): — Recently signed the Environmental Impact Statement (EIS), for the corridor.
Asset Management Cindy VanDyke Office of Planning Georgia Department of Transportation.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
Planning and Environmental Linkages MPO/COG Conference February 24, 2016.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Alternative Alignments Public Meeting
S.R. 30A / U.S. 98 / Panama City Beach Parkway
US 181 Harbor Bridge Project
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Complete Streets: Making Connections
Highway 14 – Owatonna to Dodge Center District 6 Update
Draft Transportation Element September 6, 2017
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Presentation transcript:

MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County Lenawee County Lenawee County

I-94 Modernization Study Began in December 2000 Draft and Final Environmental Impact Statements (EIS) 9-mile corridor from M-60 to Sargent Road 9-mile corridor from M-60 to Sargent Road 8 Interchanges 8 Interchanges 18 Bridges 18 Bridges EIS Purpose Improve road and bridge condition Improve road and bridge condition Improve travel efficiency Improve travel efficiency Improve safety Improve safety Two committees were established Project Steering Committee Project Steering Committee Technical Advisory Committee Technical Advisory Committee Interchange and mainline alternatives were evaluated 4 Public Information Meetings held at Baker College Practical Alternatives presented at Public Hearing on April 17, 2002 I-94 at the US-127 (West Avenue) interchange consensus building process Record of Decision received from the Federal Highway Administration (FHWA) in 2007

I-94 Recommended Alternative 9-miles of mainline will be reconstructed A third through lane will be constructed in each direction A third through lane will be constructed in each direction A fourth merge-weave lane will be constructed in each direction between the US-127 west interchange and the US-127 east interchange A fourth merge-weave lane will be constructed in each direction between the US-127 west interchange and the US-127 east interchange Shoulders and median will be brought up to current design standards Shoulders and median will be brought up to current design standards 7 interchanges will be reconstructed Total estimated cost $409 million (in 2005 dollars)

Phased Construction Dettman Road and Hawkins Road Bridges over I-94 Reconstruction – 2009/2010 Partial Sargent Road Interchange Reconstruction Including the Closure of the I-94 BL

Phased Construction US-127/M-50/West Avenue Interchange Reconstruction Elm Road Interchange Reconstruction Remainder of the Sargent Road Interchange Reconstruction Lansing Road Bridge Reconstruction I-94 over the Grand River Bridge Widening and Reconstruction

Phased Construction US-127 South Interchange Reconstruction Cooper Street Interchange Reconstruction I-94 Widening between the two legs of US-127

Phasd Construction Airport Road Interchange Reconstruction I-94 Widening between US-127 South and Sargent Road M-60 Interchange Reconstruction I-94 Widening between US-127/M-50/West Avenue and M-60

What has been done… Hawkins Road ( $4.4 million) and Dettman Road ( $4.3 million) bridge reconstructions Lengthened and raised to accommodate future widening of I- 94 Lengthened and raised to accommodate future widening of I- 94 I-94 at Sargent Road interchange reconstruction ( $19.6 million) and closure of the I-94BL interchange Proximity of the interchanges Proximity of the interchanges Condition level of I-94 BL bridge Condition level of I-94 BL bridge $14.4 million in HPP funding secured by Congress from SafeTEA-LU plus $1 million from TEA-21 $14.4 million in HPP funding secured by Congress from SafeTEA-LU plus $1 million from TEA-21 Includes new carpool parking lot and new non-motorized path (in cooperation with Leoni Township) Includes new carpool parking lot and new non-motorized path (in cooperation with Leoni Township)

Whats next…? I-94 at Cooper Street interchange reconstruction ( $18 million) I-94 over the Grand River and railroad ( $22 million) Road realignment project will address the approaches to the new bridge and the new interchange ($43 million) Road realignment project will address the approaches to the new bridge and the new interchange ($43 million)

QUESTIONS?