Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
March 2012 Radnor High School Parking & Circulation Improvement Opportunities.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Downtown Access Improvements Plan Town of Hillsborough 2014.
Project, Cost Schedule, and Work Limits Roadway Character Design Criteria for Bridges Maintenance of Traffic Right-of-Way & Utility Involvement General.
Hot Springs Public Meeting Reconstruction of US 18 & US 385
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
LOR-U.S. 20 / S.R. 113 Center Ridge Rd. Widening Center Ridge Rd. at Avon Belden Rd. (S.R. 83)
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
 Provide a safe crossing and maintain mobility › The bridge is identified as structurally deficient.  Meet regional traffic demands and improve mobility.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Cost Estimation System Tool
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014.
In association with: 73 rd Street to Indian Bend Wash Bridge THOMAS ROAD STREETSCAPE 73 RD STREET TO INDIAN BEND WASH BRIDGE PROJECT NO. T0606 City of.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
STA Safety Project PID #76439 December 12, 2006.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Maintenance and Temporary Traffic Control
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Improvements to Stockton Street
Pioneer Road Relocation and Reconstruction Project
District 3 Complete Streets Projects
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Draft Transportation Element September 6, 2017
River to Sea TPO Meeting US 92/International Speedway Boulevard
General Tab Project, Cost Schedule, and Work Limits Roadway Character
SE 12th Street Roadway Improvements February 8, 2005.
Walker Street Reconstruction Project 25% Design Public Hearing
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Presentation transcript:

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs Increase safety within the existing corridor Reduce traffic congestion Provide access management Provide infrastructure improvement to foster economic development along the corridor

Project Development to Date Public Meeting – reviewed and received input regarding initial five alternatives Alternative 3 - determined to be the preferred alternative Right-Sizing of Alternative 3 - provided most economical option, while meeting the project needs Preliminary Engineering – in progress, near completion

Overview – Right-Sized Alternative 3 Adding a turn lane using variable width widening Constructing a barrier curb for safety and access control Constructing a sidewalk and pedestrian buffer Realigning Henderson and Guice Road for increased safety and efficient travel Improvements to State Street Upgrading traffic signal at the intersection of Lincoln Way and Route 48

Preferred Alternative Typical Section

Visualization of Roadway - Before

Visualization of Roadway - After

Preliminary Maintenance of Traffic During Construction Four Phases of Traffic Control; places an emphasis on minimizing disruption to business owners Widen to the east maintaining two lanes on the west Widen to the west maintaining two lanes on the east Maintain pedestrian access through work zone during construction PennDOT will coordinate details with municipality during Final Design Maintain access to businesses

Traffic Signals: Construction & Upgrades New signal at Henderson and Guice Upgrade to the existing signal at State Street Timing adjustments at Route 48

Driveway Adjustments & ADA Compliance Depressed concrete curb to define access to businesses Americans with Disabilities Act (ADA) compliant ramps at all intersections and driveway access points

Potential Required Right-of-Way Several potential property, or sliver takes Potential total takes or displacements to accommodate safety improvements at Henderson and Guice Right-of-Way acquisition process typically lasts 18 to 24 months

Funding Current Transportation Improvement Program (TIP) Discussions currently on-going regarding TIP Update Preliminary Engineering Estimate Currently Being Developed Utilities$500,000 Right-of-Way$600,000 Construction$6,375,000

Next Steps Complete Preliminary Engineering Begin Final Design Complete Right-of-Way acquisition plan Advertise Project for Construction Notice to proceed to selected contractor Construction Phase / Open to Traffic

Milestone Schedule

Questions?