WLTP - GTR No. 15 WLTP-13-15e ECE-TRANS-WP29-GRPE e

Slides:



Advertisements
Similar presentations
Current status of alternative warming up procedure Annex 4 § (OIL#19) WLTP-06-25e T. Yamaguchi, Japan
Advertisements

Non Road Mobile Machinery Engines Global Technical Regulation Complete Informal Document NRMM WG Informal document No. GRPE (57th.
WLTP-07-17e WLTP GTR 15.
17/1/2008 NRMM WG GRPE1 NRMM GTR Draft Technical procedure (chapters 7-9) As informal document to GRPE GRPE working group on the emissions from Non- Road.
Status of the draft GTR 65th GRPE, January 2013
WLTP drive trace normalization
WLTP normalization rotational Mass
WLTP OIL #6, annex 2, section 2 Use of the gearbox, required data.
WLTP Phase 1B Main Open Issues Road and Dyno Load Presentation at WLTP IG Meeting Geneva Open Issues Road and Dyno Load- K. Kolesa Working paper.
WLTP OIL #6, annex 2, sections 3.2 and 3.3 Determination of engine speeds, calculation of available power.
UNECE/GRPE Informal WG on Heavy Duty Hybrids (HDH) Baltimore 2012 HDH Chair Petter Åsman Document: EVE-02-06e.
Working group L-EPPR 07 June 2013
European Commission Enterprise and Industry GRPE meeting - 08/06/2012 | ‹#› Workshop - stakeholder consultation International environmental and propulsion.
Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal.
France consideration on maximum noise in Global Technical Regulation on Quiet Road Transport Vehicles ECE-TRANS-WP29-GRB-58 Informal document GRB
Final??? Review of WLTP Definitions Bill Coleman – Tokyo Sept./Oct WLTP-12-20e.
Old Annex 2 Reference Fuels moved to new Annex 3 Old Annex 3 Determination of System Equivalence moved to new Annex 9 New is Annex 2 Gear Selection, Shift.
WLTP N/v tolerance Simulation results and conclusion BMW,
WLTP 6th DTP Meeting Geneva DTP Subgroup LabProcICE slide 1 Parameter Setting for Validation 2 DTP Subgroup Lab Process Internal Combustion Engines.
Analysis of Normalization Report With Focus On Rotational Masses Geneva, 14 th of January 2015 Christoph Lueginger BMW WLTP-09-25e.
A new UN Global Technical Regulation on Worldwide harmonized Light vehicles Test Procedures (WLTP) Transmitted by the WLTP UN GTR draft manager Informal.
17/1/2008 NRMM WG GRPE1 NRMM GTR Draft Technical procedure (chapters 7-9) As informal document to GRPE GRPE working group on the emissions from Non- Road.
WLTP-13-xxe Report by Drafting Coordinator, Serge Dubuc WLTP GTR 15.
GTR amendments Japan #14 WLTP IWG at Paris WLTP-14-08e.
Starting note on gearshift issues
India’s Comments on EPPR (Part-B2)
RLD test program : alternative method O.I.L#18
India proposals on part B1 & B2 text
43rd Session GRB 21 February 2006 Geneva, Switzerland
WLTP Informal Working Group
Improvement of Wind tunnel Measurement Process Status report
Regulation series WLTP-24-03e_Appendix 4
Status of the draft GTR 65th GRPE, January 2013.
Drafting Subgroup Meeting Part of IWG #16, The Hague, October 2016
Gas fuelled vehicles in GTR 15: Bringing WLTP in line with Reg. 83:
Informal document No. GRPE (70th GRPE, January 2015, agenda item 3(b))
Improvement of Family definitions
Input on wind tunnel criteria discussions
WLTP-DTP-LabProcICE-229
Idea of family CO2/FC family criteria
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 1/2/2019.
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 1/2/2019.
01 General requirements Road load matrix family vehicle definition 02 Annex 4 Wind tunnel for road load matrix family 03 Annex 6 CO2 interpolation range.
Drafting Coordinator Report
Tianjin Motorcycle Technical Center
India comments on EPPR 23-33
WLTP GTR 15 WLTP-09-18e Report by Drafting Coordinator, Serge Dubuc
Tianjin Motorcycle Technical Center
Working Paper No. WLTP-05-11e
Drafting Group: Final Meeting Drafting Group: 1st Meeting
A.1 to 3: Statement of technical rational and justification
WLTP/DHC meeting on 29th March 2012 at Ispra, Italy.
WLTP Informal Working Group
Document TYREGTR Agenda item 4.4
Status report 4WD dynamometer taskforce
Japan’s proposal for EPPR-11-15e-Rev.1
Specifications for 4WD Chassis Dynamometer in WLTP
WLTP-DTC Air Pollution Control and NIR Division
WLTP GTR 15 WLTP-12-18e Report by Drafting Coordinator, Serge Dubuc
India Additional Comments on
WLTP Open Issue Phase 1B OIL #25: Chassis dynamometer calibration –
Adolfo Perujo (IWG chairman)
STATEMENT OF TECHNICAL RATIONALE AND JUSTIFICATION
Status report of OBD Task Force
STATEMENT OF TECHNICAL RATIONALE AND JUSTIFICATION
WLTP/DHC meeting on 29th March 2012 at Ispra, Italy.
UNECE IWG on EPPR for L-category vehicles
Additional discussion points from the gearshift issues task force
India Comments on EPPR
Presentation transcript:

WLTP - GTR No. 15 WLTP-13-15e ECE-TRANS-WP29-GRPE-2016-03e Interpretation Issues- Views from India WLTP IG Meetings 11th – 13th Jan 2016 Geneva

1. Target Road Load GTR Text II. Text of the global technical regulation Concern Statement is open ended. Lacks clarity. Proposal “ Target road load” means the road load to be reproduced on the chassis dynamometer Justification For better understanding. Page 10 of GTR

2. n/v ratios GTR Text II. Text of the global technical regulation Proposal n/v ratios (engine rotational speed divided by vehicle speed). same as used in 5.6.1 / 5.6.3 Justification For better harmonisation in term definitions.

3. Vehicle speed  

4. Test Cycle Applicability GTR Text Annex1 Concern The part in the red box is misleading. Proposal The Cycle to be driven depends on the ratio of test vehicle’s rated power to mass in running order, W/Kg, and its maximum velocity Vmax , and its mass, Kg. Justification for better understanding.

5. Typographical Error GTR Text, Annex 4 Proposed Text

THANK YOU.