Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE-68-15 (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal.

Similar presentations


Presentation on theme: "Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE-68-15 (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal."— Presentation transcript:

1 Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE-68-15 (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal Group Report to GRPE No. 68 by Stephan Redmann

2 WLTP IG Meetings June 2008 – Jan. 20101st – 4th WLTP IG meeting 2010 – 2013 WLTP IG was inactive 8th January 20145th WLTP IG meeting  Start of WLTP Phase 1B

3 Status of WLTP Phase 1 67th GRPE: Working document GRPE/2013/13 amended by (11/2013)Informal document GRPE-67-04-Rev.1  WLTP Phase 1A 162th WP.29: 1) Adoption of Phase 1A gtr documents (03/2014) 2) Technical reports 3) Mandate for WLTP Phase 1B

4 WLTP Phase 1b Roadmap WP.29 GRPE WLTP 2014 2015 2016 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 Fix organization, responsibilities and time schedule Phase2 ToR 56789 10 gtr informal document Round Robin 167 168 169 717370726968 gtr formal document Slight modification 11 12 13 Phase2 14

5 WLTP Phase 1b Organization (WLTP-05-03) WLTP Informal Group Chair : Redmann Vice Chair : KOBAYASHI Co-TSs : ICHIKAWA / Kolesa Drafting Coord.: Dubuc E-Lab. Sub-group Co-Chairs : Ohlund / NIIKUNI Co-TS : ICHIKAWA / Hartmann Task Forces IG designates responsible CPs/Individual expert for each open task.

6 Open issues list: WLTP-05-04 Key issues:Subgroup EV Utility Factors, phase specific calculation formula, shortened test procedure Cycle / Process Downscaling, gearshifting, number of tests Road & Dyno Load Determination Windtunnel method, torque meter method, on-board anemometry, default running resistances General Normalization procedures, Ambient temp. correction test Validations/ Round Robin exercise Open issues Phase 1B

7 Parallel activities of the European Union in 2014: Normalization procedures (WLTP-05-13) Correction algorithms for variations in the WLTP testing 1) Chassis dynamometer test (vehicle state, test execution, meas. Equipm.) 2) Road load determination (coast-down test: ambient conditions, vehicle state, test execution, test circuit) Draft report on 21 methods: end January 2014, discussions on EU implementation in 2014 Interest of CPs to harmonize these procedures (partly) in Phase 1B?  Feedback requested until 14th February 2014.

8 Ambient Temperature Correction Test (WLTP-05-14) Method already discussed and drafted in Phase 1A Validation of family concept is on-going, participation of CPs welcomed Utility Factors (EV vehicles) Current gtr: regional UFs. EU develops revised UFs to improve representativeness, including the methodology to develop UF.

9 Next meetings  Preparatory Telephone/Web Conference, 2 weeks in advance of each IG meeting  6 th WLTP IG Meeting, Vienna, Austria 3 day meeting, end March / beginning April 2014 (date tbc)  7 th WLTP IG Meeting, Geneva June 2014, preceding GRPE (date tbc)


Download ppt "Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE-68-15 (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal."

Similar presentations


Ads by Google