Effective Implementation: Installation

Slides:



Advertisements
Similar presentations
The NDPC-SD Intervention Framework National Dropout Prevention Center for Students with Disabilities Clemson University © 2007 NDPC-SD – All rights reserved.
Advertisements

Implementation Science overview
Establishing an Effective Network of PB4L: School wide Coaches
Campus Staffing Changes Positions to be deleted from CNA/CIP  Title I, Title II, SCE  Academic Deans (211)  Administrative Assistants.
NC SSIP: 5 Things We’ve Learned Directors’ Update March 2015 ncimplementationscience.ncdpi.wikispaces.net/Recent+Presentations.
NC SSIP: Top 5 Things We’ve Learned Mid-South Meeting January 7-8, 2015.
INSTRUCTIONAL LEADERSHIP FOR DIVERSE LEARNERS Susan Brody Hasazi Katharine S. Furney National Institute of Leadership, Disability, and Students Placed.
Rob Horner University of Oregon Implementation of Evidence-based practices School-wide behavior support Scaling evidence-based practices.
Professional Development and Technical Assistance: The National Blueprint for Success Tim Lewis, Ph.D University of Missouri OSEP Center on Positive Behavioral.
NC SSIP DAC Update March 2015 ncimplementationscience.ncdpi.wikispaces.net/Recent+Presentations.
Continuing QIAT Conversations Planning For Success Joan Breslin Larson Third webinar in a series of three follow up webinars for.
1. 2 Why is the Core important? To set high expectations –for all students –for educators To attend to the learning needs of students To break through.
FewSomeAll. Multi-Tiered System of Supports A Comprehensive Framework for Implementing the California Common Core State Standards Professional Learning.
Maine’s Response to Intervention Implementation: Moving Forward Presented by: Barbara Moody Title II Coordinator Maine Department of Education.
Implementation Science Vision 21: Linking Systems of Care June 2015 Lyman Legters.
SectionVideo/PresentSlidesTotal Time Overview + Useable Intervention8:30 min Stages7:19 min Teams PDSA Terri present Drivers8:50 min Lessons Learned +
Implementing School-wide PBIS Pennsylvania PBIS Implementer’s Forum Rob Horner University of Oregon.
Designing and implementing a developmentally appropriate state-wide Kindergarten Entry Assessment and K-3 Formative Assessment System: Necessary Considerations.
Effective Behavioral & Instructional Support Systems Overview and Guiding Principles Adapted from, Carol Sadler, Ph.D. – EBISS Coordinator Extraordinaire.
Rob Horner OSEP Center on PBIS Jon Potter Oregon RTI David Putnam Oregon RTI.
DEVELOPING AN EVALUATION SYSTEM BOB ALGOZZINE AND STEVE GOODMAN National PBIS Leadership Forum Hyatt Regency O’Hare Rosemont, Illinois October 14, 2010.
Notes by Ben Boerkoel, Kent ISD, based on a training by Beth Steenwyk.
: The National Center at EDC
Data Report July Collect and analyze RtI data Determine effectiveness of RtI in South Dakota in Guide.
Welcome To Implementation Science 8 Part Webinar Series Kathleen Ryan Jackson Erin Chaparro, Ph.D University of Oregon.
These slides were taken from: Practice Profiles Melissa Nantais, Ph.D. Professional Learning Coordinator Michigan’s Integrated Behavior & Learning Supports.
1 One Common Voice – One Plan School Improvement Stage 3 Plan: Develop School Improvement Plan.
Help to develop, improve, and sustain educators’ competence and confidence to implement effective educational practices and supports. Help ensure sustainability.
Updated Section 31a Information LITERACY, CAREER/COLLEGE READINESS, MTSS.
IMPLEMENTATION SCIENCE OVERVIEW. CONTEXT & RATIONALE.
LEA Self-Assessment LEASA: Presentations:
EFFECTIVE IMPLEMENTATION: EXPLORATION
INVOLVING STAKEHOLDERS Heather Ouzts, NC DPI Parent Liaison Beverly Roberts, ECAC NC SIP Project Coordinator.
Evidence-Based and Promising Practices to Increase Graduation and Improve Outcomes Dr. Loujeania Bost Dr. Catherine Fowler Dr. Matthew Klare.
EFFECTIVE IMPLEMENTATION: INSTALLATION
Tier 1 Positive Behavior Support Response to Intervention for Behavior Faculty Overview.
Wisconsin Personnel Development System Grant Click on the speaker to listen to each slide. You may wish to follow along in your WPDM Guide.
EFFECTIVE IMPLEMENTATION: FULL IMPLEMENTATION
EFFECTIVE IMPLEMENTATION: FULL IMPLEMENTATION
Phase-1: Prepare for the Change Why stepping back and preparing for the change is so important to successful adoption: Uniform and effective change adoption.
SAM (Self-Assessment of MTSS Implementation) ADMINISTRATION TRAINING
Coaching for Impact Susan Barrett
Module 5: Communication Plan and Process for Addressing Barriers
Phyllis Lynch, PhD Director, Instruction, Assessment and Curriculum
NC State Improvement Project
District Leadership Team Sustainability Susan Barrett Director, Mid-Atlantic PBIS Network Sheppard Pratt Health.
Florida’s MTSS Project: Self-Assessment of MTSS (SAM)
TAIS Overview for Districts
Effective Implementation: Initial Implementation
Comprehensive Planning
Developmentally appropriate practices and specialized instruction are fundamentally dependent upon each other in early childhood special education. Record.
Exceptional Children Division Special Programs and Data Section
Zelphine Smith-Dixon, State Director of Special Education
RTI & SRBI What Are They and How Can We Use Them?
RtI Innovations: Evaluation Anna Harms & Jose Castillo
State and District Role in
RESEARCH IMPLEMENTATION PRACTICE
2018 OSEP Project Directors’ Conference
PBIS PRACTICES.
Effective Implementation: Initial Implementation
Miblsi.cenmi.org Helping Students Become Better Readers with Social Skills Necessary for Success Steve Goodman Funded through OSEP.
Structures for Implementation
Implementation Guide for Linking Adults to Opportunity
School’s Cool Makes a Difference!
IMPLEMENTATION STRUCTURES
Exceptional Children Division Special Programs and Data Section
K–8 Session 1: Exploring the Critical Areas
An Overview April 2012.
Installation Stage and Implementation Analysis
Intensive Intervention – Tier 3
Presentation transcript:

Effective Implementation: Installation http://goo.gl/cwJ1O4

NC Implementation Structures Leadership and Policy State Implementation Team: C&V, PD, TAC, RE Implementation Design Team Implementation Design Team Implementation Design Team Implementation Design Team

NC Implementation Structures Leadership and Policy State Implementation Team Implementation Design Team Implementation Design Team Implementation Design Team Implementation Design Team K-3 Formative Assessment MTSS LEASA

“Students cannot benefit from interventions they do not experience.” Rationale RESEARCH IMPLEMENTATION PRACTICE GAP Why do we have to pay attention to implementation practice? “Students cannot benefit from interventions they do not experience.”

Implementation Quick Start What does this work mean? https://unc-fpg-cdi.adobeconnect.com/_a992899727/ai-lesson-quickstart/

Formula for Success Implementation Math WHAT: Effective Interventions HOW: Effective Implementation WHERE: Supportive Contexts WHY: Positive Outcomes for Students We know that for implementation to be successful, we must have all three (effective interventions, effective implementation, and supportive contexts) in place to get positive outcomes for students. Just like with multiplication, if any of these three factors are “0” then the outcome will also be “0”

Active Implementation Frameworks Stages Drivers Usable Interventions Cycles There are five frameworks in the Implementation Science model – let’s review them quickly Teams

Linked Team Structures “We tend to focus on snapshots of isolated parts of the system and wonder why our deepest problems never seem to get solved.” —Senge, 1990 School-based Implementation Team District-based Regionally-based State-based Decision-makers: Data, Curriculum, Funding, Personnel To ensure appropriate support, we need to not work just in teams, but in linked teams. A good communication flow between levels of teams leads to effective and efficient implementation by providing a structure for barriers or challenges identified along the way to be pushed up to the team that can problem-solve to remove the barrier

Performance Assessment Usable Interventions Performance Assessment Operational Definitions Essential Functions To be truly usable, interventions must be well-defined in ways that implementers can understand what is expected of them. Being able to describe what the intervention should look like in action is critical to high fidelity implementation. Clear Description

Implementation Drivers Performance Assessment (Fidelity) Coaching Systems Intervention Training Organization Drivers Facilitative Administration Competency Drivers Each of the drivers plays a role in ensuring success of implementation. Competency drivers are about making sure implementers have the knowledge and skills to implement as intended, but without organizations that are good host environments, and leadership capable of solving both technical and adaptive challenges, implementation won’t be successful Selection Decision Support Data System Leadership Adaptive Technical © Fixsen & Blase, 2008 11

Improvement Cycles: Usability Testing Plan Study Act Do Anytime we are trying new things, we can expect unanticipated challenges to arise. If we enter implementation with the mindset that we are engaging in a continuous improvement process, we can be prepared for making changes along to way as the data informs our process. 12

Implementation Stages Initial Implementation Exploration Installation Initial Implementation Full Implementation Assess needs Examine intervention components Consider Implementation Drivers Assess Fit Acquire Resources Prepare Organization Prepare Implementation Drivers Prepare Staff Adjust Implementation Drivers Manage Change Deploy Data Systems Initiate Improvement Cycles Monitor & Manage Implementation Drivers Achieve Fidelity & Outcome Benchmarks Further Improve Fidelity & Outcomes Finally, Implementation doesn’t occur all at once. By paying close attention to the stages of implementation, we can focus our work, anticipate challenges, and prepare for what’s coming next. 2-4 Years

Installation “Work to do it right.” Begins when there is a decision to move ahead with the innovation. Plans for the changes and develops systems to accommodate and fully support implementation Establishes a team charged with the implementation process After making a decision to begin implementing a new practice or innovation, there are tasks that need to be accomplished before the change in practice actually begins.  During the Installation phase, we “work to do it right.” Activities during the Installation Stage create the infrastructure and make the instrumental changes necessary for success.   Teams put necessary organizational supports into place (e.g., funding, human resource strategies, new policies and procedures, materials).  They create referral mechanisms, reporting frameworks and outcome expectations.  And importantly, they create and install the supports needed to improve the confidence and confidence of teachers and staff (e.g. training, coaching, data systems).  Questions to Consider: How do we do it? Do we have the materials, training, time, and support to do it right? How can we master the new skills and fit it all in?

Installation “Work to do it right.” To build capacity, you must: Identify organizational and structural supports needed Select the first practitioners Develop selection protocols Evaluate readiness of data systems Establish communication links and protocols Build your training and coaching capacity Identify organizational and structural supports needed- Installing a new initiative will include selecting and/or repurposing of staff, scheduling team meetings, aligning policies and procedures, purchasing equipment, finding space and developing the competence of those bringing the changes to staff members.  Any of this work that can be done before the Initial Implementation Stage will reduce the number of potential problems later.  Select the first practitioners- includes identifying specific behavioral characteristics needed to carry out the work, then developing methods for recruiting and selecting teachers and staff (i.e. practitioners) with those characteristics and with the necessary pre-requisite knowledge and/or skills.  Careful consideration and mutual selection at this point will reduce potential “push-back” as the harder work begins.   Just remember, the person who is first to volunteer may not be the optimal choice! Develop selection protocols- Selection of the early practitioners for your initiatives will be crucial to successful use of the innovation.  To expedite this selection process, the development of selection and/or interviewing protocols to use as screening devices will be helpful.  Prior to actually selecting staff, the process will develop consensus in the group regarding the skills and characteristics that are necessary.   Evaluate readiness of data systems- To evaluate success of an innovation, we must examine both how it affects student outcomes and determine the fidelity of the use of the innovation by the adults.  If there is only marginal (or no) student improvement, does this mean the innovation itself is the problem?  Or is the problem that the implementation of the innovation was not effective?  A system designed to quickly and effectively capture both fidelity and outcome data can provide an answer that question.  Once established, the decision support data system provides data that are reliable, valid, accessible for decision-making, and support frequent use of data during the implementation process.  Establish communication links and protocols-Frequent communication between and among the practice level (e.g., classroom/ school) and the policy level (e.g., District/State) creates an opportunity to continuously examine and improve the process of implementation.  Through these communication links, teams can quickly troubleshoot issues as they arise remove roadblocks that slow or derail use of new strategies.  Build your training and coaching capacity- Skill-based training must occur before we can expect teachers, staff, and other practitioners to begin using the new programs or practices. Creating a training plan is a critical first step for installation. Once you have identified the practice you will be installing, it is important to have enough details that you can train staff and administrators to implement it with fidelity, that you can replicate it across you schools and districts and that there is an assessment that allows you to measure the use of the intervention. In other words, the intervention needs to be teachable, learnable, doable and readily assessed in practice. We have learned how important coaching is to promote actual use of innovations in the classroom by adults so that students can actually benefit from these strategies. One tool that the AI hub has available for doing this is the Practice Profile (see next slide)

Installation Example

Tools & Resources

Tools & Resources http://ncimplementationscience.ncdpi.wikispaces.net/EC+Institute+-+Installation http://ncimplementationscience.ncdpi.wikispaces.net/Installation+Resources The Active Implementation Hub Quick Start Video Stages of Implementation Analysis for Education by NIRN/SISEP

If you haven’t yet: Practice Profiles http://implementation.fpg.unc.edu/modules-and-lessons Lesson 3: Practice Profiles Provide clear definitions and descriptions of developmental variations of an implementation Examples http://mtss.ncdpi.wikispaces.net/Practice+Profiles http://ncimplementationscience.ncdpi.wikispaces.net/LEA+Self-Assessment

Practice Profiles Lesson A Practice Profile will support the training and coaching process.  Using this tool helps to identify the essential functions or core components of a program and describe key activities associated with each component.  Creating Practice Profiles enables a program to be teachable, learnable, and doable in typical educational settings.  The Practice Profile also includes examples of three levels of fluency for guidance: expected (fluent), developmental (heading in the right direction) and unacceptable (off track).  

DCA

Activity: Selection Criteria Selection Criteria Example Selection Criteria Planning Worksheet

General Supervision SPP/APR Data Collection Dispute Resolution System Policies, Practices and Procedures Monitoring Activities Improvement, Correction, Incentives, & Sanctions Targeted Technical Assistance Fiscal Management NCDPI has the responsibility to ensure that all children with disabilities receive FAPE. The comprehensive general supervision system: 1. Supports practices that improve educational results and functional outcomes for children and youth with disabilities; Uses multiple methods to identify and correct noncompliance; and Utilizes mechanisms to encourage and support improvement and enforce compliance. (make connections to this PD)

Continuum of Transitions SSIP: Focus for Improvement Academics Continuum of Transitions Behavior Engagement So while General Supervision defines the responsibilities of the EC Division and of LEA EC services, the State Systemic Improvement Plan, or SSIP, focuses specifically on improvement in graduation rates for students with disabilities. To accomplish that goal, the EC Division has identified broad root causes to inform our focus statewide on Academics, Behavior, and the Continuum of Transitions. For each of these, it will be necessary to consider how we are addressing engagement of students, staff, families, and communities. This framework allows you to inform, explain and make connections between Academics, Behavior, Continuum of Transitions and Engagement to increase the success of every student. Engagement efforts should encourage students and families to be involved in the process from PreK through adulthood.

Continuum of Transitions This Professional Learning Supports Improved Graduation Rate for Students with Disabilities by: Academics Active implementation of evidence-based instruction, preK through secondary Local capacity building Technical and adaptive leadership Comprehensive and efficient assessment system Student, Family, Staff, and Community Engagement Behavior Active implementation of evidence-based behavioral programming, preK through secondary Local capacity building Culturally responsive instruction Positive school/class climate Comprehensive and efficient assessment system Student, Family, Staff, and Community Engagement Engagement This slide lists some specific considerations for improving academics, behavior, and the transition continuum. This professional learning supports: (highlight areas) by (direct connections) Continuum of Transitions Active implementation of evidence-based transition practices, preK to post-secondary Local capacity building Systemic and coordinated supports (including wraparound), preK to post-secondary Consistent attendance Extracurricular and/or employment opportunities Student, Family, Staff, and Community Engagement

Contact: Cynthia Dewey Race to the Top – Early Learning Challenge, NCDPI State Implementation Team Cynthia.dewey@dpi.nc.gov Heather Reynolds State Implementation Specialist & Data Analyst, NCDPI heather.reynolds@dpi.nc.gov or NCImplementationScience@dpi.nc.gov http://ncimplementationscience.ncdpi.wikispaces.net