GLAST LAT System Engineering

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

© 2007 General Dynamics. All rights reserved. Integrated Space Systems 1196 EB-R GLAST Pre-Ship Review (PSR) LAT Payload I&T Review CONTRACT NO.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
ISOC/SVACInstrument Analysis Meeting, Quatorze Juillet, 2006 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project28 March 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review LAT Requirement Verification Presentation 5 of 12 GLAST Large Area Telescope Gamma-ray Large Area.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST Large Area Telescope:
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
GLAST LAT Project5 April 2006 LAT System EngineeringLAT Verification Process GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
Environmental Test Planning
GLAST Large Area Telescope
Integration and Test GLAST Large Area Telescope:
Baseline Environmental Test Flow at NRL
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Thermal Vacuum Test: Plans and Procedures
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
GLAST LAT System Engineering
Integration and Test Organization Chart
Mechanical/Thermal Systems
Environmental Test Planning Meeting
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST LAT System Engineering
Integration and Test Organization Chart
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Test Readiness Review
LAT Environmental Test Planning and Design Review
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST LAT System Engineering Gamma-ray Large Area Space Telescope GLAST LAT System Engineering LAT Test Planning Meeting Rich Baun SLAC rbaun@slac.stanford.edu (650) 926-3520

Agenda LAT Level Test Sequence Baseline LAT Level Test Sequence Test Groupings LAT Environmental Test Sequences Redundancy Configurations

LAT Level Test Sequence Baseline Ship to NRL Post-Ship Modal Survey Sine Vibe Install Radiators Post-Rad Install EMI/EMC Acoustic F S F S P P P P T P E P F Pre Post Axis Pre Pre Post Pre-TV T-Bal T-Cycle Final Remove Radiators Weight, CG Pack LAT Ship to GD F S F F S P F S TV Chamber Partial Functional (includes Limited Performance) Full Functional (includes Comprehensive Performance) EMI/EMC Emissions/Susceptibility SVAC Tests TCS LPT P F E S T

Baseline Level LAT Test Sequence Basic Function Validation Full Functional Initialization Infrastructure Tests Register Tests Subsystem Response with LAT wide Functions Abbreviated CPTs LPTs LAT Characterization Calibration Initial Inst Functional Timing Operational Settings LCI SVAC Muons LAT Performance = Redundancy tests required Baseline Muons E2E T&DF Muon Tests Full LAT SVAC Tests

Baseline LAT Test - Test Groupings (1/4) Basic Function Validation Purpose Initialization Validate FSW conducted LAT initialization sequence Prove FSW interfaces with flight hardware Infrastructure Validate all LAT operational functions such as command, telemetry, Configuration and LCI files, FSW File Management, et. al. Register Tests Utilize FSW utilities to verify function of all LAT registers

Baseline LAT Test - Test Groupings (2/4) Subsystem Response Purpose Abbreviated Comprehensive Performance Test (CPTs) Verify subsystem performance remains in spec in LAT wide environment Demonstrate the complete health of each subsystem Collect trend data Run in all prime and all redundant redundancy configurations Limited Performance Tests (LPTs) Perform quick check of subsystem performance in cross-strapped redundancy configurations

Baseline LAT Test - Test Groupings (3/4) LAT Characterization Purpose Initial Instrument Functional High-level validation of the LAT as an integrated scientific instrument Timing Measure and adjust LAT wide timing Calibration Calibrate the LAT using LCI and Muons Operational Settings Determine/adjust LAT operational settings as precursor to LAT Level Performance tests

Baseline LAT Test - Test Groupings (4/4) LAT Characterization Purpose Baseline Muons Establish Instrument Level baseline performance with Muons E2E Muon Tests Verify T&DF performance using Muons Full LAT SVAC Tests Collect necessary data for analysis to verify LAT meets all requirements in the SRD

Post Ship Test Sequence Basic Function Validation Full Functional Initialization Limited Infra Tests Register Tests Subsystem Response with LAT wide Functions Abbreviated CPTs LPTs LAT Characterization Calibration Initial Inst Functional Timing Operational Settings LCI SVAC Muons LAT Performance = Redundancy tests required Baseline Muons E2E T&DF Muon Tests Full LAT SVAC Tests

Sine Vibe LAT Level Test Sequence Partial Functional Basic Function Validation Initialization Limited Infra Tests Register Tests Subsystem Response with LAT wide Functions Abbreviated CPTs LPTs Partial Functional repeated 4 times, one pre Sine Vibe and once after each axis = Redundancy tests required

Post Radiator Installation TCS LPT Contents TBD = Redundancy tests required

EMI/EMC LAT Level Test Sequence Partial Functional Basic Function Validation Initialization Limited Infra Tests Register Tests Subsystem Response with LAT wide Functions Abbreviated CPTs LPTs EMI/EMC RERS CECS = Redundancy tests required

LAT Level Test Function/Interface Validation (1/3)

LAT Level Test Function/Interface Validation (2/3)

LAT Level Test Function/Interface Validation (3/3)

LAT Level Redundancy Configurations

LAT Level Test - Interfaces Verified