GUAPI working group meeting June 26th 2013

Slides:



Advertisements
Similar presentations
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
Time Stamping and archiving of PLC data
Applications developed by EN-ICE clients. 2 EN-ICE Workshop – 23 April 2009 Developed by people outside EN-ICE making use of: Our integrated solutions.
European Organization for Nuclear Research PLC services Jerónimo Ortolá, Jacky Brahy EN-ICE Workshop 23 April 2009.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
UNICOS-like system for interlocks II Workshop on PLC-based interlocks systems ITER, Dec 2014 Jeronimo ORTOLA VIDAL CERN Engineering Department, Industrial.
SIMATIC New Generation Controllers S7-1200
(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Agenda: First steps using WinCC OA First steps using UNICOS V5 Vacuum Test Rig Principles of.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
An example of platform independence in UNICOS control systems Koutli Maria CERN EN-ICE-PLC 07/02/14.
Novel techniques while developing on the WinCC OA Experience with the UCPC library.
Automatic Generation Tools UNICOS Application Builder Overview 11/02/2014 Ivan Prieto Barreiro - EN-ICE1.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
* Critical in the sense of fast intervention SIEMENS – CERN EN/ICE annual meeting Nuremberg, December the 13 th 2012 Industrial Controls Engineering Department.
MARCO UNICOS based control system CERN Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Michal Zimny Cracow University of Technology Seminar - Internship programmes at CERN PH-DT-DI.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
UAB Versioning: Definition 02/04/ Resources Package Split The resources package will be split into different modules: 1. Common/Core (name to define)
Industrial Control Activities Forecast Philippe Gayet on behalf of EN-ICE.
UNICOS Roadmap 2015 Enrique Blanco On behalf of the UNICOS team EN-ICE 1 March 2015 CERN March 27, 2015 GSI - CERN Collaboration.
60kW Thermosiphon control system
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Thermo-siphon Control Design Lukasz Zwalinski – PH/DT Alexandre Moraux – PH/DT
European Organization for Nuclear Research Industrial Controls Engineering Department GUAPI working group meeting May the 6th 2015.
Chiller + Brine + Water control system UNICOS CPC Lukasz Zwalinski – PH/DT.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
PLC based Interlock Workshop CIS Team February 2016 ITER Central Interlock System Fast Interlock Controller.
Industrial Controls & Saffety Systems Beams Department CPC (C ONTINUOUS P ROCESS C ONTROL ) B ASIC COURSE SESSION 0 : INTRODUCTION UNICOS: UN IFIED I NDUSTRIAL.
What means QA for PLC Programming Philippe Gayet ATC/ABOC Days.
UNICOS-CPC course - CERN EN/ICE Industrial Controls Engineering Department Deployment of the CPC6 control application Marc Quilichini
Distributed middleware for front-ends and systems connectivity Piotr Nikiel on behalf of JCOP 1.
- My application works like a dream…does it. -No prob, MOON is here. F
Experience in Design and Implementation of CO2 Cooling Control Systems
ICE UPGRADE PLAN Philippe Gayet on behalf of EN-ICE.
ATLAS ITk Baby-DEMO update
Status & Plans for WA105 Control System
CV PVSS project architecture
Detector Cooling Project WP2 CO2 activities status report
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 0: INTRODUCTION UCPC 6 UNICOS-Continuous Process Control.
CMS gas systems meeting
Service presentation Problem: Modifying systems in production is risky
Forum on Tracking Detector Mechanics - Bonn, May 2016
Cryo PLC issues [May 2011]: CASES
prepared by R.A.Barlow 13/09/2016
UCPC RP Presentation for GSI
TE-ABT PLC and SCADA usage
J. Uythoven for the MPE-MI & MS Teams
Common components for OPC-UA developments at CERN: An enhanced OPC-UA toolkit Ben Farnham.
MAUVE CO2 cooling review
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
2300 (11PM) September 21 Blue line is meridian..
Unit 1: Quick Quizzes After 5,13
SEPTEMBER 2014 Unit 1 Unit 1 Unit 1 Unit 1 Quick Quiz 9,16, 21 Unit 1
SEPTEMBER ½ Day Unit PLC
Operational Update 1.
Project Migration / Management
2015 January February March April May June July August September
Presentation transcript:

GUAPI working group meeting June 26th 2013

AGENDA General news. Technical meeting with Siemens. Technical meeting with Schneider. Users presentation: Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO2 cooling plants. (Lukasz Zwalinski. PH-DT-DI). 

General news EVENTS: PROFINET Workshop at CERN (January 2012) TIA portal Workshop at CERN (May 2012) France PEROFIBUS-PROFINET Technical Day at CERN (October 2012) CERN-GSI meeting at CERN (June 2012) WinCC OA and safety Matrix integration meeting EtherCAT seminar at CERN (September 2012) OPC UA videoconference (May 2013) PROFINET seminar (March 2013)

General news Foreseen events for the coming months: TIA Portal V12. Siemens S7-1500 commercial presentation. Ethernet IP seminar at CERN.

General news EN/ICE: PLC critical stock available. UNICOS CPC solution for Siemens touch Panels. For Schneider Magelis panels under development. Fast interlocks solution for fast processing signals (TE-EPC prototype based in UNICOS CPC). UNICOS CPC library for CodeSys. Targeted to Schneider M258. Alternative solution to Paradis under study. Siemens PLC diagnostics agent refurbished with Simatic NET under tests. Failure report procedures available for PLC users. https://j2eeps.cern.ch/wikis/pages/viewpage.action?pageId=14779163

General news Support: RAMSES. PLC problems solved. Schneider PLC crash. Memory error detection failure. TE-ABT. LBDS. DP/AS-I Link failure under investigation. Equipment sent to Siemens. EN-EL. S7 400H failure investigated and not understood due to lack of diagnostic information. Siemens S7 400 replacement campaign finished. 21 PLCs replaced.