1 prepared by R.A.Barlow 13/09/2016
CERN TE-ABT-EC LIU-ABT systems: PSB BI.DIS10 controls Agenda: General controls (Roger Andrew Barlow) Timing system (Christophe Chanavat) Fast interlocks studies (Felipe Cordobes Dominguez) IGBT’s R&D program (Tobias Stadlbauer & Luc Sermeus) prepared by R.A.Barlow 13/09/2016

2 Generator prototype, Jura 6
BI.DIS10 Generator prototype, Jura 6 Status of technical progress (Slow Controls) WinCC faceplates + string structure for state machine stage in place Class SILECS implemented and tested for slow control Timing H/W integration (loc/rem signal to timing and INH action) Status of hardware development PFN construction on-going, near completion (70%), internal cabling done Production of EDS chassis to outside companies, dispatched...! Remaining issues Timing, needs VS PFN signal and Vref signal... Fast interlocks progress PDC production Operations issues Operational specification on-going and to be finalized by Bettina/Jose (looks like we have one BIS system after all.)

3 Slow control and cabling production
BI.DIS10 Slow control and cabling production Hardware production ABTECMAINT-48 Installation components BI.DIS10 in BCER (Linac4/LS2) ABTECPROD-20 JURA6 BI.DIS10 patch traversant prototype (Change-over proto) – HW done but (cables and installation not done) ABTECPROD-25 Patch panel de series pour BI.DIS10 au BCER (ADTE ?) – NOT DONE ABTECPROD-19 Cablage des unites casette IGBT pour le BI.DIS10 (CERN) – NOT DONE ABTECPROD-18 Cablage des 6 PFN pour le BI.DIS10 (Naked shells ready) – September 2016 (ON schedule) ABTECPROD-21 Pre-production series for PLC crates BI.DIS10 (Master, OP, GPC, EDS) – DONE ABTECPROD-22 Production of series PLC crates for BI.DIS10 (ADTE) – EDS starting

4 DIC/DEC BI.DIS10 DIC/DEC Status of technical progress
DIC completed (99.9%), sent to EN/EL Nearly 600 cables ! (guestimate on-par) UPS outlets defined PROBELM with DIC cost !!! Over budget, cost split now between EC and FPS Over budget due to an increase in cabling costs of 25%, discussions with EN/EL on the topic.

5 BI.DIS10 Planning review