Practice Statement The effective use of Isolate and Insulate equipment and procedures to provide the necessary level of safety when performing Live Line.
Advertisements

1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
LHC HARDWARE COMMISSIONING REVIEW May 2005 CRYOGENIC VACUUM SYSTEM Paul Cruikshank for AT/VAC.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
LHC Performance Workshop - Chamonix January 2010 Session 4 - Safety for Personnel Underground - He Evacuation What can the Safety Coordination.
New HV test specification for the LHC N. Catalan for the EI section.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
LHC HARDWARE COMMISSIONING SAFETY TRAINING DAY S. Claudet (AT-ACR-OP) With great help from G. Lindell (Safety commission) CRYOGENICS.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
V.Montabonnet - Safety during Hardware Commissioning 18 October Contents  Electrical circuits in the LHC context  Electrical Hazards  Preventions.
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
7/23/ J.Coupard. 1) Cryogenic risks 2) Cryogenic phases from RT/floating to nominal and additional safety rules A. Sectors warmed-up to RT or considered.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
For more info:
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
CERN Safety Coordination How it functions. CERN Safety: Who is Responsible?  Everyone present on CERN’s site, i.e. staff, members, and contractors alike.
Occupational Health and Safety
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Review of Sector th of February Electrical Safety for the interventions during Hardware Commissioning of LHC Anne Funken, TS-ICC.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
Work Organisation for Splice Consolidation Francesco Bertinelli 20 minutes presentation, 10 minutes discussion: 12 slides First LHC Splice Review, CERN,
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Review of Sector th of February Tunnel Access During Powering Tests Hugues Thiesen, AB-PO.
Health and Safety Coordination at CERN Environmental Health and Safety managing risks today for a safer tomorrow John Robert Etheridge, Emmanuel Paulat,
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
Roberto Saban TS HC Review bis Outline  Interviews of all the Group Leaders loosely or tightly concerned by hardware commissioning proposing them.
An invitation to an open discussion We are team reviewing its performance globally We want to help each other to reach the objectives We know the other.
Closing session Issues and questions from the audience and some from me Rüdiger Schmidt.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
(Access system for HWC)
Some arrangements for personnel safety 1- Procedures for access
CERN Construction Planning and Scheduling (LHC installation)
Framework Schedule from EYETS 2016 to LS2
ELQA Electrical Quality Assurance
Minimum Hardware Commissioning – Disclaimer
LHC Hardware Commissionning
HSE rules & regulations
Quality Assurance applied to Accelerator Safety
Safety rules for works supervisors
Keeping LHC cold during LS periods Preliminary proposal
Hollow e- lens, Cryogenic aspects
Survey on “Chargés de Consignation” Follow-up
Powering from short circuit tests up to nominal
Managing infrastructure faults to minimize accelerator down time
EP Experiments safety validation process Safety Permits
Status of the cryogenic system for B180
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
DG Employment and Social Affairs
Mikael Jakobsson ESS Installation Manager
US-LARP Task: IR Commissioning
Workshop commissioning Installation Coordination at ESS
MOBILITY Important issue on the DG-agenda since 1995 Object:
Brief report of the hardware commissioning activities
US-LARP Task: IR Commissioning
BC2 / Linac Installation Coordination Kathleen Ratcliffe
Hardware Commissioning
Circuit Disconnector Boxes Implementation of our safety first policy
Powering and Safety day Underground access during powering tests
Review of hardware commissioning
Safety in the East Area Renovation Project
Presentation transcript:

Agenda Contents Different types of documents Location of the HCC documentation Where to apply the HCC procedures? Case of HC tests Case of interventions Conclusion

New documents for HC Test procedures General safety procedures Concern all tests which have to be done during the hardware commissioning from the IST to the powering of the SC circuits up to nominal current Description of the tests Condition to start and during the tests Status of the equipments after the tests Risk analysis and safety compensatory measures Co-activities Test Procedure for warm magnet circuits General safety procedures Concern the general safety aspects of the HC Access conditions vs status of the sector (Pressure test, flushing, Cooldown, ElQA) Access to the sector during the powering tests

New document for HC Specific risk safety procedures Concern the specific risks during the hardware commissioning of the superconducting circuits (mainly electrical and cryogenic risks). Description of the specific risks How to eliminate the risks Procedure to be follow Intervention procedures Concern the most frequent interventions Same idea as for the test procedures: identify the risks and give the procedure to follow to do the intervention in safety conditions Avis/Permis de travail and attestation de consignation Document to prove that the CT has respected the safety procedure and the intervention is authorized by HCC/Cryo. Permis de travail cryo Avis de travail Attestation de consignation

Location of the HCC documentation You can find all documents in the web pages of the HCC http://hcc.web.cern.ch/hcc/ Here

Where are the documents? You can find all documents in the web pages of the HCC http://hcc.web.cern.ch/hcc/ Special folder for the safety

Where to apply the HC procedures? The HC procedures are applicable only: In the areas under the responsibility of the HCC During the HC periods Safety CERN regulation is also mandatory HCC procedures + CERN regulation Powering Tests are ongoing between 10 oct 2007 and 15 nov 2007 CERN regulation

Hardware commissioning tests Condition to start the tests The campaigns are announced The tests areas are delimited The tests are planned every day during the HCC meeting The tests are realized only by trained teams (official list)

hardware commissioning tests Documents which have to be applied CERN safety regulation + HCC safety procedures Tests procedures No “avis de travail” “Consignation” if necessary (responsibility of the CT) “Cryo Permit” + “Cryo consignation” if necessary (responsibility of CT) The EIC and HC team have to strictly follow Test procedures The daily tests defined during the morning HCC meeting

Intervention during the HC tests CERN safety regulation + HCC safety procedures Intervention procedures when they exist Risk analysis + VIC when the intervention procedures do not exist “Avis de travail” “Consignation” if necessary (responsibility of the CT) “Cryo Permit” + Cryo consignation” if necessary (responsibility of the CT) The CT have to do Always contact the EIC before and after the intervention

Intervention during the HC tests When the intervention is done by the HC team (official list) CERN safety regulation + HCC safety procedures Intervention procedures when they exist Risk analysis (done the CT) VIC if necessary (responsibility of the CT) “Avis de travail” or “verbal/e-mail authorization” (responsibility of the CT) “Consignation” if necessary (responsibility of the CT) “Cryo Permit” + Cryo consignation” if necessary (responsibility of the CT) The CT have to do Always contact the EIC before and after the intervention

Intervention during the HC tests When the intervention is done by the Piquet (official list) CERN safety regulation + HCC safety procedures Intervention procedures when they exist Risk analysis (done the CT) VIC if necessary (responsibility of the CT) “Avis de travail” “Consignation” if necessary (responsibility of the CT) “Cryo Permit” + Cryo consignation” if necessary (responsibility of the CT) The CT have to do Always contact the EIC before and after the intervention

Conclusion The safety starts when: The workers are trained (theory and practice) The risks are identified The regulation is followed by everybody Everybody use the same regulation There are safety controls