CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION.

Slides:



Advertisements
Similar presentations
THAI TOKO ENGINEERING CO.,LTD.
Advertisements

Welcome to Who Wants to be a Millionaire
1 Yell / The Law and Special Education, Second Edition Copyright © 2006 by Pearson Education, Inc. All rights reserved.
A 2030 framework for climate and energy policies Marten Westrup
QSE Program Managers Meeting - Nov 15th, Topics Context Schedule Review Package status Program Team Statistics.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. *See PowerPoint Lecture Outline for a complete, ready-made.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 58.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 112.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Geometric Sequences and Series
Joint Information Systems Committee 01/04/2014 | | Slide 1 e-Infrastructure Programme James Farnhill e-Research Programme Manager e-Infrastructure Security.
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
Break Time Remaining 10:00.
A-16 Portfolio Management Implementation Plan Update
This project is implemented by ECO This project is funded by European Union Implementation of Twinning & TAIEX Operations in Azerbaijan Workshop on implementation.
October 22, 2010; Tallinn, Estonia Cosimo Garofalo III ESTONIAN NUCLEAR POWER CONFERENCE.
MEP201 Mechanical Engineering Drawing 1st semester
CMPC Project Metso Automation 2 nd Align Meeting DCS Scope October, 23th/24th
Calcit Gospić Factory of calcite fillers Delivery and commissioning of medium and low voltage cabinets Elektro-Čelik d.o.o. Markovićeva 28 Križevci, Croatia.
Gossets student-t model What happens to quantitative samples when n is small?
ELECTRICAL DIAGRAMS.
Gdpack 40.5kV Technical Data Sheet MV-LV Prefabricated Substation
15. Oktober Oktober Oktober 2012.
SOLID GEOMETRY. (d) Projections of Right & Regular Solids like; (Prisms, Pyramids, Cylinder and Cone) SOLID GEOMETRY Following topics will be covered.
2014 National Patient Safety Goals
© ABB STOTZ KONTAKT ABB MCB Tripping – Characteristics MCB´s Knowhow ABB STOTZ KONTAKT.
Produced by the Department of Learning and Teaching Resources, Belfast Institute. Want to be a xxxxx? Welcome to College Name Click here to start.
Create and Operate EMS Internal Information Business Unit Staff EM Laws Environmental Reports EM Certification NGOs Management Company Policies EA Group.
Want to be a xxxxx? Welcome to College Name Click here to start.
Stakeholder Involvement Program to Establish New and Better Hazardous Waste Treatment Facilities in WA 3c web: telephone: (08)
FY 2009 President’s Budget Status and FY 2010 Budget Development Dec 9, 2008 Mary Jane Miller Director, Office of Budget Management Indian Affairs.
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
Clock will move after 1 minute
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
University of Texas At El Paso
Activity INDUSTRY OIL EXTRACTION CONSTRUCTION INDUSTRY ENVIRONMENTAL PROTECTION ENERGY SCOPE OF SERVICES 1.
PDS secondo le IEC n.
SUBSTATION MODELING: PROTECTION AND AUTOMATION
5/21/2015 Using Simulation Tools to Predict and Prevent Vacuum Circuit Breaker Switching Induced Transformer Failures Steven B. Swindler,
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
All rights reserved MV SWITCHGEAR.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
EMS User Group Conference – 2008 PHI EMS MIGRATION TO COMMON PLATFORM PROJECT Manley Higgins Project Manager System Operations Pepco Holdings Inc. September.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
A Training Presentation On 220 KV GSS CHOMU,JAIPUR
Ornetpower LTD is a privately owned company that was founded in 1998 by Mr. Yehoshua Hadad, an expert in AC and DC electrical systems. The Company's professional.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
S A Griffiths CM42 June 2015 Electrical & Control.
AMEU QUARTERLY REPORT February 2017
FERO INVEST
SALES: HOW TO USE THIS PRESENTATION
Project: 33kV Substation Refurbishment Customer: NEEPCO Site : Ranga Hydro Electric Plant, P.O. Ranga Project, Arunachal Pradesh.
Annex 5: Milestones Action Determine sticker label design / features
Software Development Process
DIPLOMA In ELECTRICAL ENGINEERING DEPARTMENT OF ELECTRICAL ENGINEERING GOVERNMENT POLYTECHNIC COLLEGE, HANUMANGARH Sept A Training Presentation On.
Presentation transcript:

CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 New Bleached Pulp Mill 1,5 million/ tons/year

CMPC GUAIBA PROJECT CMPC Guaíba Project Extra: IMPACTO DE ESTUDOS EM EQUIPAMENTOS PROTEÇÃO TRANSFORMADORES (Transientes) FILTRO DE HARMONICOS DE BT   Padronização Potencias => mar/14   Fornecimento => Jun – nov/14 (100%) PROTEÇÃO TRANSFORMADORES (Transientes) FILTRO DE HARMONICOS DE BT   Padronização Potencias => mar/14   Fornecimento => Jun – nov/14 (100%)

CMPC GUAIBA PROJECT CMPC Guaíba Project Power Distribution System ENGINEERING Main Activities in the past 60 days Main studies released. Still on April - Harmonic and Stability will be released; CEEE studies also released; Studies Feedback from ONS were straight; short circuit already approved ; Main project (EMS /125V / GIS) were certified with high quality (Cross reference closed); A9 / Limiter – Technical aspects clarified and defined Harmonic MV Filter Preliminary Layout Defined LV Harmonic and Surge Supressor Definition concluded; Main Activities in the past 60 days Main studies released. Still on April - Harmonic and Stability will be released; CEEE studies also released; Studies Feedback from ONS were straight; short circuit already approved ; Main project (EMS /125V / GIS) were certified with high quality (Cross reference closed); A9 / Limiter – Technical aspects clarified and defined Harmonic MV Filter Preliminary Layout Defined LV Harmonic and Surge Supressor Definition concluded;

CMPC Guaíba Project CMPC GUAIBA PROJECT Power Distribution System ENGINEERING - STATUS Equipments: 34,5 kV GIS Panel MV Harmonic Filters DC Auxiliary System Current Limiter 13,8 kV Air Insulated Panel Retrofit S1 Switchgear Grounding Transformer Grounding Resistor Revenue Metering Panel Energy Management System Load Rejection System Erection Material Services: Engineering Electrical Studies Erection Project Erection Supervision Erection Commissioning Training Assisted Operation Legenda “ OK!” “ ATTENTION!” “ PRIORITY!”

CMPC GUAIBA PROJECT CMPC Guaíba Project Power Distribution System PROCUREMENT Main Activities in the past 60 days A9 / Limiter (LCC) – PO Released – Delivery Sep/14 All main components ordered and PO Released: Measuring System – May/14 Grounding / Transformer – Resistor – Jun/14 EMS /LRS Cabinets – May/14 Main Activities in the past 60 days A9 / Limiter (LCC) – PO Released – Delivery Sep/14 All main components ordered and PO Released: Measuring System – May/14 Grounding / Transformer – Resistor – Jun/14 EMS /LRS Cabinets – May/14

CMPC GUAIBA PROJECT CMPC Guaíba Project Power Distribution System PROCUREMENT - STATUS Equipments: 34,5 kV GIS Panel MV Harmonic Filters DC Auxiliary System Current Limiter 13,8 kV Air Insulated Panel Retrofit S1 Switchgear Grounding Transformer Grounding Resistor Revenue Metering Panel Energy Management System Load Rejection System Erection Material Services: Engineering Electrical Studies Erection Project Erection Supervision Erection Commissioning Training Assisted Operation Legenda “ OK! – Acquisition done ” “ in procurement process” “ Critical ”

CMPC GUAIBA PROJECT CMPC Guaíba Project Power Distribution System MANUFACTURING A1 Panel: 32 Cubicles being – OK! – Cabinet Approved Cubicles 2500 A 27 Cubicles 1250 A A5 Panel: 07 Cubicles 1250 A – April/14 A6 Panel: 05 Cubicles 1250 A – April/14 A7 Panel: 06 Cubicles 1250 A – April/14 A2 Panel: 08 Cubicles 1250 A – April/14 A3 Panel: 08 Cubicles 1250 A – April/14 A4 Panel: 12 Cubicles 1250 A - April/14 A8 Panel: 08 Cubicles 1250 A - May/14 A1 - Released to be sent to the site

CMPC GUAIBA PROJECT CMPC Guaíba Project Power Distribution System MANUFACTURING EMS / LRS A1

CMPC GUAIBA PROJECT CMPC Guaíba Project Power Distribution System S CURVE– MAR/14

CMPC GUAIBA PROJECT CMPC Guaíba Project Time Schedule with Milestones Dates

CMPC GUAIBA PROJECT CMPC Guaíba Project Time Schedule with Milestones Dates

CMPC GUAIBA PROJECT CMPC Guaíba Project Main Milestones in the next days   Detailed Planning and schedule for Erection;   Supply all Equipments. Except A9 and MV harmonics;   EMS / LRS / EMS Software implemented and approved;   Detailed Planning and schedule for Erection;   Supply all Equipments. Except A9 and MV harmonics;   EMS / LRS / EMS Software implemented and approved;

CMPC GUAIBA PROJECT CMPC Guaíba Project Issues & Concerns Concerns:   Dates accuracy for the interface points;   Internal Logistic for Cabinets (from the Truck to the room) and other Equipments;   Transformers Infrastructure / Erection delaying PDS demobilization Concerns:   Dates accuracy for the interface points;   Internal Logistic for Cabinets (from the Truck to the room) and other Equipments;   Transformers Infrastructure / Erection delaying PDS demobilization