Presentation is loading. Please wait.

Presentation is loading. Please wait.

Activity INDUSTRY OIL EXTRACTION CONSTRUCTION INDUSTRY ENVIRONMENTAL PROTECTION ENERGY SCOPE OF SERVICES 1.

Similar presentations


Presentation on theme: "Activity INDUSTRY OIL EXTRACTION CONSTRUCTION INDUSTRY ENVIRONMENTAL PROTECTION ENERGY SCOPE OF SERVICES 1."— Presentation transcript:

1 Activity INDUSTRY OIL EXTRACTION CONSTRUCTION INDUSTRY ENVIRONMENTAL PROTECTION ENERGY SCOPE OF SERVICES 1

2 ENGINEREENG DESIGN PROJECT MANAGEMENT EXECUTION OF ELECTRICAL & CONTROL SYSTEMS PREFABRICATION OF DISTRIBUTION BOARDS / PLC CABINETS COMMISSIONING SERVICE What we do? SCOPE OF OPERATIONS 2

3 Electrical installations E LECTRICAL I NSTALLATIONS D EPARTMENT C&I E LECTRICAL I NSTALLATIONS D EPARTMENT 3

4 Electrical installations ELECTRICAL & CONTROL SYSTEMS  We construct ’turnkey’ energetic systems.  Our employees have the required qualifications.  The company is equipped with proper tools, transport resources and connectivity vital for providing services.  Rigorous checking procedures at every stage of project execution ensure a high level of performance. 4

5 Electrical installations O RGANIZATION OF THE DEPARTMENT Various works – specialized employees  Managers  Engineers  Workers for: MV systems LV panels systems control systems cabling cable connections measuring works earth works installation of cable trays 5

6 Service & engineering team 6  24/7 – Service in Poland  24/7 – On-call logistic  In four working days anywhere in Europe  People with necessary permissions and trainings to work offshore: Olf Card HUET - Helicopter Underwater Escape Training BOSIET - Basic Offshore Safety Induction & Emergency Training

7 C&I Projects – general scope Scope Management Project Management / Site Management supervision Designing concept of the structure for automation system Technical documentation Software Engineering PLC programming, SCADA - visualization, reporting, trends, data archiving Delivery engineering / operation stations, synoptic boards, servers, software license PLC cabinet with I/O cards, interfaces, cross box process Instrumentation with all necessary equipment cable trays, cable ducts fiber optic networks, communication networks signal / power supply cables pneumatic equipment Installation installation all delivery equipment installation packages equipment if necessary connections Commissioning instrumentation adjusting loop testing, participation in „hot” commissioning participation in process optimizations 7

8 Site organization chart

9 That`s the way we work: 9 Average annually installation of:  Cable trays – 50 km  Cables – 300 km  Busbars – 6 km Cable trays installations:  5 km – average length on each Project

10 That`s the way we work: 60 cubicles – average annually installation of Main LV Panels 10 LV Panels & Distribution boards installations

11 That`s the way we work: 11 MV Transformer Stations:  15 MVA – annually  30 Middle Voltage cubilces

12 12 Comprehensive project implementation BIOETHANOL PRODUCTION FACILITY Goświnowice WIND FARM Łęki Dukielskie 28 technological installations over an area of 11 ha Installed power 12,8 MVA Delivery and assembly:  8x1,6 MVA transformers  MV 8HD10 switchgear  LV 3200A distribution boards from LV1 to LV7 Installed power 10 MW Installation of 15 kV internal connections Installation of 5 transformer stations Connection to National Grid

13 13 Comprehensive project implementation Design and modernization Power station equipped with:  Two boilers  17,5 MVA/6,3 kV generator  LV switchgears 22 cubicles, 2 ATSE, 2500 A  Main MV switchgear THERMAL-ELECTRIC POWER PLANT at PCC ROKITA Brzeg Dolny NGK CERAMICS Gliwice  Installation of five 3150 kVA transformers with Siemens 5000 A busbars  Installation of four 2500 kVA transformers with Siemens 4000 A busbars  Installation of one 1600 kVA transformers with Siemens 2500 A busbars  Delivery and installation of SIMOSEC 24kV, 630 A  Prefabrication and delivery of eight units of LV Sivacon 5000 A

14 14 Comprehensive project implementation  Installation of two 2500 kVA transformers with Siemens 4000A busbars  Installation of five1600 kVA transformers with Siemens 2500A busbars  Delivery and installation of SIMOSEC 24kV, 630 A  Prefabrication and delivery of eight units of LV Sivacon 5000 A KIRCHHOFF Polska Ltd. ASSEMBLY, Gliwice Plant No. 1, 2, 3 and power suplly Toyota Foundry with accompanying ACCUROMM and NTK facilities, Jelcz Laskowice  Installation of six 2000 kVA transformers with Siemens 5000A busbars  Delivery and installation of SIMOSEC 24kV, 630 A  Prefabrication and delivery of eight units of LV Sivacon 5000 A


Download ppt "Activity INDUSTRY OIL EXTRACTION CONSTRUCTION INDUSTRY ENVIRONMENTAL PROTECTION ENERGY SCOPE OF SERVICES 1."

Similar presentations


Ads by Google