GOMER SEWER IMPROVEMENT AREA

Slides:



Advertisements
Similar presentations
1. I. Review Objective of Tonight’s Meeting. II. Review History of Project. III. Review Proposed Wastewater Treatment Plant & Sewer System Layout. IV.
Advertisements

CITY CODE OF ORDINANCES – REVISIONS TO CHAPTER 30- UTILITIES City Commission/City Manager Workshop June 16, 2014.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Stanlick Sewer Treatment Plant Upgrade Implementation Date: September 1, 2008.
Sanitary Sewer System Rate Study September 2012 Keystone Municipal Services.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
1 Informational Meeting March 5, 2003 Perry Township Administration Building Delmar Addition/Glenn Avenue Sewer Improvement Area.
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
“Nucor Road Industrial Corridor – Sanitary Sewer Project” Presented by: Justin Longstreth, P.E. Brian Hannon, P,E, Moore & Bruggink, Inc. October 14 th,
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
BOARD OF COUNTY COMMISSIONERS DECEMBER 11, 2012 CELEBRATION POINTE COMMUNITY DEVELOPMENT DISTRICTS.
+ Proposed Lockwood Targeted Economic Development District 2015 Yellowstone County.
RETROFIT POLICY FOR GRANT FUNDED PROJECTS Utilities Department Orange County Board of County Commissioners September 23, 2014.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Board of County Commissioners Allen County, Ohio Tuesday, May 1 st, 2001 Presented By: Stephen M. Kayatin, Sanitary Engineer Ryan Rase, Business Manager.
Hide-A-Way Lake, Inc. Low Pressure Sewer System Prepared by Dungan Engineering, P.A.
Utility Extension Project
Board of County Commissioners Allen County, Ohio Detailed Planning Assessment Hearing Wednesday, May 30 th, 2001 Presented By: Stephen M. Kayatin, Sanitary.
IRSDA Conference What Do the Amendments to Indiana Code Section Mean to You? Kristina Kern Wheeler, General Counsel Ja-Deen L. Johnson, Consumer.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
1 Construction Assessment Hearing October 3, 2002 Shawnee Middle School Cafeteria.
Board of County Commissioners Allen County, Ohio Pre-Construction Public Informational Meeting April 27, 2005.
5/29/021 Informational Meeting May 29, 2002 Perry Township Administration Building Fourth Street/Bowman Road Sewer Improvement Area.
1 Construction Assessment Hearing May 23, 2001 Shawnee Middle School Cafeteria.
Southwood Waterline Project Shawnee Twp. House 7:30 PM November 29 th 2000.
Proposition 1 Workshop: the Grant Application Process July 2015.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
Enhanced Wireless Funding through HB 361 Shawn S. Smith Interim Ohio Coordinator.
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
Heritage Park Area Mandatory Connection Final Information Meeting March 14, 2016.
Mandatory Connection 1 st Information Meeting. Review project Explain mandatory connection process via Frequently Asked Questions Answer questions Supply.
Solid Waste Study Board of County Commissioners March 20, 2012 Orange County.
Mandatory Connection 2 nd Information Meeting November 17, 2015.
Ordinance Amending Chapter 37 of the Orange County Code Orange County Board of County Commissioners Public Hearing April 3, 2012.
PARK STREET/CAMPANELLI PARK SEWER EXPANSION PROJECT Public Meeting Wednesday, June 22, 2016.
BUDGET PROCESS & REVENUE & EXPENSE INFORMATION For FISCAL YEAR 2011.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
CSA 7 – Boulder Creek. YOUR SANITATION FACILITY Facility Includes the Following Five Pump Stations –Total of 10 pumps 16,553 feet of collection lines.
CONGAMOND ROAD ROADWAY IMPROVEMENT INFORMATIONAL MEETING
Jefferson County Planning Commissioners Hearing June 26, 2013
Dependent Eligibility Audit CEWW Health Insurance Consortium
Community Improvement Districts County Counselors Association of Kansas Annual Meeting November 15, 2010 Janet S. Garms
Special Assessments John T. Shockley, Attorney Ohnstad Twichell, P.C.
Marquis Hills Area Information Meeting December 7, 2016
Water & Wastewater Capacity Charge Work Shop
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Marquis Hills Area Information Meeting December 7, 2016
After the FCC Form 471 E-rate Program Applicant Training
Tax Abatement Bonds Presentation City of Marshall, Minnesota
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Item 8A Authorize staff to establish a new standard operating procedure (SOP) with the authority to waive the sewer tap fee for an incentive period of.
Valley & Third Streets Redevelopment
Utilities Department Wedgefield Water November 28, 2017.
Springbrook Estates Sewer Improvement Area Informational Meeting
Building & Housing CDBG Budget Hearing February 2018
Board of County Commissioners
Participatory Road Program neighborhood meeting Donahoo 174th Street
Sewer Infrastructure Watuppa Plantations Development
Julie Woosley, Division of Waste Management
E-Rate 101: Overview of the Program
Delta Water Supply Project
BAT Work Group.
Village of Naples New Sanitary Sewer System Final System Layout
Water Resources Council
Indiana Department of Environmental Management Office of Water Quality
Presentation transcript:

GOMER SEWER IMPROVEMENT AREA Informational Meeting June 20, 2017, 6:30 p.m. Gomer’s Dads Club Nicholas Avenue Introduction.

Overview of Tonight’s Meeting Review History of Project Review Field Testing Review April 2015 General Study Review Project Cost and Financing for Recommended Option Review Procedures for Completing Project Review Easement Acquisition Procedure Review Tentative Schedule Questions and Answers What we will cover tonight.

I. History of Project During 2010: OEPA obtained stream samples within the Gomer area. The results of the samples confirmed an excess level of E. coli present and that nuisance conditions existed indicating violations of water quality standards. July 10, 2012: OEPA sent a letter to the Allen County Commissioners regarding their findings in the Gomer area. OEPA requested the Commissioners respond in writing as to how the water quality violations will be addressed. September 20, 2012, July 15, 2013, July 29, 2013 and August 5, 2013: Allen County conducted additional Pike Run stream testing to determine the scope of the problem and to confirm water quality standards were being violated.

I. History of Project (cont.) August 2013: Kohli & Kaliher Associates, Inc. was authorized by the Allen County Commissioners to complete a General Study to determine how best to serve the Gomer Sewer Improvement Area with collection, conveyance and treatment facilities to eliminate the water quality violations. April 2015: Kohli & Kaliher Associates, Inc. completed a General Study of the area to determine the most cost effective method to address water quality violations. July 21, 2016: Letter was sent to property owners updating the status of the project. Present: For the last few months we have been researching funding opportunities.

II. Field Testing Ohio Administrative Code – Public Health Nuisance

II. Field Testing (cont)

II. Field Testing (cont) Test results highlighted in yellow identify a public health nuisance in accordance with OAC 37451-04 (F)(1)(B).

III. April 2015 General Study of Project Area The Ohio Environmental Protection Agency has documented nuisance conditions within the area which have violated OAC 3745-1-04 (State Water Quality Standards) due to off lot discharge of sanitary wastes. Individual homes are served by various types of household sewage treatment systems. These include, but not limited to, septic tanks or aeration tanks, most of which discharge off-site to various storm sewer outlets. Pike Run at Gomer is on the list of prioritized impaired waters in the “OEPA 2014 Integrated Water Quality Monitoring and Assessment Report” due to non-attainment of human health and recreation assessment criteria as a Class B, Primary Contact for Recreation use stream and OAC 3745-1-04 General Water Quality Criteria.

III. April 2015 General Study (cont) Statutory Responsibility The Allen County Commissioners are the responsible body for the planning, financing and operating publicly owned wastewater collection and treatment works in the Gomer planning area due the County having an established countywide sewer district per ORC 6117.01. Some General Study Findings Based upon the results of this study, a summary of findings is as follows: The present discharge of maltreated and/or untreated sewage causes public health hazards and odor problems. Most of the home sites do not have an adequate lot size to install leaching fields to prevent off lot discharge. Some water well isolation distances are not adequate per requirements. There are approximately 150 user equivalents (1 user equivalency = 1 residential home) within the project area.

III. May 2015 General Study (cont) Studied Options:

III. April 2015 General Study (cont) Recommendation: After evaluating the economic, environmental and social costs related to alternatives for collecting, transporting and treating sanitary flows, it is recommended that Option C, a combination of gravity sanitary sewers and low pressure collection with individual grinder pumps and a pump station with 6” force main be installed to collect and transport collected sanitary flows to the American #2 Wastewater Treatment Plant for treatment.

III. April 2015 General Study (cont) Layout of all the properties involved in the project.

IV. Project Cost and Financing Total Estimated Project Cost Breakdown Construction $2,816,430 Engineering $ 279,600 Easement & Land Acquisition $ 20,000 Miscellaneous(interim financing, issuance and etc.) $ 37,970 Contingency $ 282,000 Total Estimated Project Cost = $ 3,436,000 Breakdown of costs to property owners.

IV. Project Cost and Financing (cont) Estimated Costs to Property Owners Total number of property structures is 150. Therefore, the apportioned cost per structure is $22,907 ($3,436,030 ÷ 150). NOTE-This cost has no funding assistance factored into the cost per property owner. The cost per property owner may be certified to taxes for 20 years, or placed on the sewer bill as a debt service depending on the type of financial assistance. Abandonment of existing sewage and installation of sanitary sewer lateral and potential house plumbing modifications. Approximate cost - $1,500 to $2,000. This is an out-of-pocket cost to property owner. Once connected to project each customer will receive a quarterly sewer bill from the County to pay for the operation, maintenance, and future expenditures for the sewer district. The cost at the present time is $148.50 per quarter for a single residential property.

IV. Project Cost and Financing (cont) Funding Assistance: Funding assistance will be dependent on Median Household Income (MHI) of the township and/or surveyed Individual Household Income. The next steps of moving forward with the project will be to complete individual household income surveys and submit pre-applications for assistance. Potential financial and service assistance agencies are as follows:

IV. Project Cost and Financing (cont) ESTIMATED SUMMARY OF COST Principal Project Cost per Household On-Lot (out-of-pocket) Quarterly Sewer Bill $22,907 $1,500--$2,000 $148.50 The Principal Project Cost per Household may be paid in cash, assessed to taxes or charged to sewer bill for 20 years with interest. The method of repayment will be dependent on the type of funding assistance.  There is no funding assistance factored into this cost.

V. Procedures for Completing Project ORC 6117 Assessment Process: Commissioners adopt resolution approving General Plan and Declaring Necessity of project. Notification to agricultural use property for inclusion of property into an agricultural district (front footage assessments). Commissioners adopt resolution to establish Project Assessment Hearing. Conduct a Project Assessment Hearing. Five day wait for written objections. Respond to all written objections. G. Ten day wait for filing of all appeals to Probate Court. Settle all appeals. Proceed to the design and construction of the project with BOCC consideration of “Improvement Resolution”. Complete construction of the project. Finalize cost of project, and mail billings to property owners. Allow 30 days for cash payment. Notify property owners for connection to the project. Certify uncollected PAs to the tax duplicate of the property owners.

V. Procedures for Completing Project ORC 6117 Non-Assessment Process: Conduct a Project Informational Meeting (tonight). Commissioners adopt resolution approving General Plan and Declaring Necessity of project. Complete applications to funding agencies. Conduct a Pre-construction Informational Meeting with property owners. Proceed to the design and construction of the project with Commissioners consideration of “Improvement Resolution”. Bid and complete construction of project. Finalize cost of project, and mail billings to property owners allowing 30 days for cash payment , or do nothing, and it placed as a debt service charge on sewer bill. Conduct a project wrap-up meeting with property owners.

VI. Easements & Acquisition The County is requesting all property owners who have, or will be contacted for acquisition of easements to donate the easement to the project. The cost of acquisition of easements is factored back into the overall cost of the project. Therefore, all property owners in the project will pay for the added cost of easement acquisition. However, if a property owner chooses to be compensated for the easement the County has a process of evaluating the value of the easement(s) to make a just compensation offer to the property owner. At this time there are no easements to get. The purpose of this will be to provide maintenance of the collection system.

VII. Tentative Schedule June 20, 2017- Hold Public Informational Meeting. November 2017 - Complete “Income Survey” of residents within the area to determine eligibility for federal and/or state grants. December 2018 – Consideration by commissioners through resolution to approve project and begin design. January 2019 – Finalize financial assistance process. July 2019 – Complete design of the proposed facilities. August 2019 - Submit construction drawings and specifications to the Ohio EPA to obtain a Permit to Install (PTI). September 2019 - Hold Pre-construction Meeting or Public Hearing. November 2019 - Advertise for bids, receive bids, award contracts. December 2019 - Obtain interim financing. January 2020 - Begin construction. September 2020-Complete construction. November 2020- Facilities become operational. December 2020 – Project wrap-up meeting with property owners. What will happen from start to finish.

VIII. Questions & Answers ? Leave open for any questions.