IEEE aj Process Overview

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Advertisements

Doc.: IEEE /0887r0 Submission July 2012 Eldad Perahia, Xiaoming PengSlide 1 Date: Authors: China MM-Wave (CMMW) Study Group July 2012.
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE /1445r1 Submission TGad November 2011 Closing Report November 2011 Eldad Perahia, Intel CorporationSlide 1 Date: Authors:
Doc.: IEEE /1474r0 Submission Nov 2013 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group November 2013 Closing Report.
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: IEEE /1200r0 Submission Sept 2012 Xiaoming Peng / I2RSlide 1 Date: Authors: IEEE aj Sept 2012 Closing Report.
TGv Closing Report March 2008
China MM-Wave (CMMW) Study Group IEEE aj Sept Meeting Logistic
xxxx doc.: IEEE /xxxxr0 March 2017
China MM-Wave (CMMW) Study Group May 2012 Closing Report
IEEE TGw March Agenda Date: Authors: May 2008
TGax March 2017 Closing Report
TGad Process Overview Date: Authors: January 2009
TGac Documents and Timeline
IEEE aj Task Group May 2017 Agenda
TGad March 2010 Closing Report
TGad September 2010 Closing Report
Proposal for TGad Selection Procedure and Timeline
TGn Chairs’ Closing Report Waikoloa, HI 802 Interim – Sep ‘07
VHT SG September 2008 Closing Report
China MM-Wave (CMMW) Study Group - Introduction of CMMW PAR and 5C
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
TGad July 2009 Closing Report
TGaf Waikoloa Closing Report
January 2017 doc.: IEEE January 2017
802.11af Liaison Report Date: Authors: March 2011
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
TGad May 2010 Closing Report
TGs Montreal Closing Report
TGad September 2009 Closing Report
TGaf Geneva Closing Report
IEEE aj Process Overview
IEEE ah Timeline Projection
VHT SG July 2008 Closing Report
TGaf San Francisco Closing Report
IEEE aj Process Overview
Backward Compatibility Feature for aj
TGad July 2010 Editor Report
TGad May 2009 Closing Report
802.11bd Timeline Date: Authors: January 2019
TGn Closing Report Los Angeles, CA, US 802 Interim
January 2017 doc.: IEEE January 2017
Proposed Modifications to VHT60 PAR
TGaf Waikoloa Closing Report
Proposed Modifications to VHT60 PAR
IEEE aj Task Group Nov 2012 Closing Report
IEEE aj Task Group Nov 2012 Closing Report
China MM-Wave (CMMW) Study Group March 2012 Closing Report
TGad Editor Report Date: Authors: May 2011 April 2007
TGad Editor Report Date: Authors: July 2011 April 2007
VHT SG November 2008 Closing Report
Task Group 4 Low Rate WPANS Opening Report
TGad March 2011 Closing Report
Proposed Modifications to VHT60 PAR
September 2009 Closing Report
TGad May 2011 Closing Report
Timeline for the Light Communications TG
2019 March TGba Closing Report
TGaf Orlando Closing Report
TGad January 2009 Closing Report
Simulation Scenario Floor Plans
TGad Task Group Document Open Items
Proposal for TGad Evaluation Methodology
IEEE aj March Closing Report
IEEE aj May Closing Report
TGbd Closing Report – Vietnam
TGaj editor report for Sponsor Ballot
Presentation transcript:

IEEE 802.11aj Process Overview April 2007 doc.: IEEE 802.11-07/0570r0 April 2013 IEEE 802.11aj Process Overview Date: 2013-04-24 Authors: Xiaoming Peng / I2R Eldad Perahia, Intel Corporation

April 2013 Abstract This document is to describe the IEEE 802.11aj Process Overview This document is to use a new document number under TGaj Task Group and update the timeline accordingly from [1] [1] 11-12-1193r0 –CMMW – IEEE 802.11aj Process Overview Xiaoming Peng / I2R

Task Group Steps Begin Task Group Create Selection Procedure April 2013 Task Group Steps Begin Task Group Elect Officers Create Selection Procedure Develop TG documents Begin Selection Procedure Confirmation vote Initial Letter Ballot Comment Resolution Recirculation Ballot(s) Initial Sponsor Ballot Recirculation Sponsor Ballot(s) Xiaoming Peng / I2R

TG documents April 2013 Functional Requirements Evaluation Methodology PAR Additional quantitative constraints Evaluation Methodology Discuss usage models and then define limited set simulation scenarios for MAC simulations Define PHY simulations Channel Models 60GHz Reuse 60GHz channel model used for 11ad 45GHz Impulse responses Path loss Antenna Define model per simulation scenario environment Xiaoming Peng / I2R

Official Time Line for 802.11aj April 2013 Official Time Line for 802.11aj 08-2012: PAR approved 03-2014: WG Letter Ballot Initial 09-2014: WG Letter Ballot Recirculation 03-2015: Form Sponsor Ballot Pool 05-2015: MEC Done 07-2015: Sponsor Ballot Initial 03-2016: Sponsor Ballot Recirculation 07-2016: Final WG approval 07-2016: Final EC approval 09-2016: RevCom & Standards Board approval Xiaoming Peng / I2R