Presentation is loading. Please wait.

Presentation is loading. Please wait.

VHT SG September 2008 Closing Report

Similar presentations


Presentation on theme: "VHT SG September 2008 Closing Report"— Presentation transcript:

1 VHT SG September 2008 Closing Report
April 2007 doc.: IEEE /0570r0 September 2008 VHT SG September 2008 Closing Report Date: Authors: Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation

2 April 2007 doc.: IEEE /0570r0 September 2008 Abstract This document is the closing report for the Very High Throughput Study Group for the September 2008 interim session. Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation

3 Work Completed September 2008 VHT60 PAR Development VHTL6
April 2007 doc.: IEEE /0570r0 September 2008 Work Completed VHT60 PAR Development Reviewed EC/ c/VHT60 PAR discussions between July – September Proposed Modifications to VHT60 PAR, Eldad Perahia, 08/988r4 Updated PAR based on feedback Joint meeting with c 08/988r3 Strawpoll: Are the proposed changes to 5.2 Scope “Provides mechanisms that enable coexistence with other systems in the band including IEEE c systems” acceptable? 60 GHz WLAN Experimental Investigations, Alexander Maltsev, 08/1044r0 60GHz Applications and Propagation Characteristics, Shu Kato, 15-08/651r1 SG/WG motion on PAR passed VHTL6 Review of Nescom feedback VHTL6 task group work plan proposal, Marc de Courville, 08/1032 Optimal CSD for Channel Estimation, Wahyul Amien Syafei, 08/1079r0 Proposal development Towards an Improved Proposal Development Process for VHT, Rolf De Vegt , 08/579 Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation

4 Goals for November VHT60 Begin TGac (VHTL6) Task Group work
April 2007 doc.: IEEE /0570r0 September 2008 Goals for November VHT60 If necessary, Update VHT60 PAR’s & 5C’s based on feedback from EC and/or NesCom Complete work on VHT60 PAR & 5 C’s and re-submit motion to WG Begin TGac (VHTL6) Task Group work Chair nominations / election Start developing task group documents Technical submissions Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation

5 September 2008 Conference call times Oct 2 – VHTL6/VHT60; Nescom feedback, usage models 11:00-13:00 ET Oct 9 - VHTL6/VHT60; Nescom feedback, usage models 20:00-22:00 ET Oct 16 – VHT60 – review from EC call Oct 23 – VHTL6; other TG documents Oct 30 – VHTL6/VHT60; selection procedure Nov 6; review from EC call; other TG documents; selection procedure Eldad Perahia, Intel Corporation


Download ppt "VHT SG September 2008 Closing Report"

Similar presentations


Ads by Google