Presentation is loading. Please wait.

Presentation is loading. Please wait.

Timeline for the Light Communications TG

Similar presentations


Presentation on theme: "Timeline for the Light Communications TG"— Presentation transcript:

1 Timeline for the Light Communications TG
May 2015 doc.: IEEE /0496r1 March 2019 Timeline for the Light Communications TG Date: Author: Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)

2 May 2015 doc.: IEEE /0496r1 March 2019 Abstract This presentation contains the timeline for the successful completion of the IEEE Light Communications Amendment. Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)

3 Timeline (historic and proposed)
May 2015 doc.: IEEE /0496r1 March 2019 Timeline (historic and proposed) Topic Interest Group 2016 Nov Technical and Economic considerations complete, including link budget and broad ecosystem support 2017 Jan Mar May Proposal to transition into a SG  Study Group Jul Use case considerations, collection of key performance indicators and first draft of Usage Model. Sep 2018 Limitations on the scope of the TG to focus on critical parts required for LC in Usage models and possible timelines Task Group TG 1st meeting – call for contributions TG Leadership selection Start on TG documents - approve work from TIG/SG (usage models, use-cases, KPIs, timelines, functional req. (FR), simulation models, channel) Start SFD Approve Specification Framework Doc. (SFD) Call for Proposals Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)

4 Timeline (proposed) March 2019 Task Group 2019 Jan
May 2015 doc.: IEEE /0496r1 March 2019 Timeline (proposed) Task Group 2019 Jan Work on Evaluation Methodology document Mar Approve Evaluation Methodology document Hear initial PHY proposals (high level concepts) May/ July PHY proposals simulation results submitted/review Jul Hear MAC pre-proposals (detailed proposals) Discussion of PHY proposals, Pre-proposal on MAC Selection of PHY proposals to be included in the draft Sep Review incoming PHY text proposals, Agree ToC for D0.1 Nov Comment collection and resolution on D0.1, create D0.2 2020 Complete CC, comment resolution, prepare Draft 1.0 Start WG LB  WG comment collection on D1.0 May/July Comment resolution Draft 2.0 and Recirculation  Sponsor Ballot (Target from PAR) 2021 Draft 3.0 and Recirculation  May  Draft 4.0 and Recirculation   Submission to RevCom (Target from PAR) Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)


Download ppt "Timeline for the Light Communications TG"

Similar presentations


Ads by Google