Presentation is loading. Please wait.

Presentation is loading. Please wait.

802.11af Liaison Report Date: Authors: March 2011

Similar presentations


Presentation on theme: "802.11af Liaison Report Date: Authors: March 2011"— Presentation transcript:

1 802.11af Liaison Report Date: 2011-03-18 Authors: March 2011
Month Year doc.: IEEE yy/xxxxr0 March 2011 802.11af Liaison Report Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Prabodh Varshney, Nokia John Doe, Some Company

2 Abstract Liaison report from 802.11af as presented to 802.19.1
Month Year doc.: IEEE yy/xxxxr0 March 2011 Abstract Liaison report from af as presented to Prabodh Varshney, Nokia John Doe, Some Company

3 March 2011 Current af Status First initial WG letter ballot LB 171 on D1.0 closed on Feb. 24, Results were 125/76/ % affirmative. Motion fails. 1304 comments received. Comments have been divided into four categories: Editorial: 402 PHY: 169 MAC: 641 General: 90 Comment resolution going on… Prabodh Varshney, Nokia

4 TGaf Timeline Initial Working Group Letter Ballot: Feb. 2011
March 2011 TGaf Timeline Initial Working Group Letter Ballot: Feb. 2011 Form Sponsor Ballot Pool: Sept 2011 Initial Sponsor Ballot: November 2011 Final WG/EC Approval: March 2012 RevCom/Standards Board Approval: June 2012 Prabodh Varshney, Nokia


Download ppt "802.11af Liaison Report Date: Authors: March 2011"

Similar presentations


Ads by Google