Progress Charts.

Slides:



Advertisements
Similar presentations
Gantt Chart.
Advertisements

New Homes Construction Overview To Code 4 Long Meadow, Diss Mark Hart Divisional Construction Director.
Timber Framed Structures
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
Structural System Overview
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Architectural Drawing
Unit 1003 Building methods and construction technology © Pearson Education 2010 Printing and photocopying permitted Learning Outcome 1 Know about foundations,
Creating a section view using floor plans
Construction Technology Bachelor of Science (hons) in Quantity Surveying ITS April 2008.
Technical boclair academy Building Drawings.
Exterior Wall (Masonry)
ASSIGNMENT Begin on page 197 “The Foundation”.
How to build a two storey house
Btec Construction Unit 5 Methods of construction for domestic buildings.
Chapter 35 Section Layout.
Topic B2 Sub-structure groundworks
Graphic Communication
Process Protocol Demonstrator Implementation of the Process Protocol at the Britannia Walk Development Stuart Carmichael Process Network 7 March 2002.
1 HVACR116 – Trade Skills Structural Drawings. 2.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
When the sub floor is ready the bricklayers can then move onto the site and build the main shell of the house.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
Framing the House. Platform Framing Platform framing.
It doesn’t matter what the subject is; once you’ve learnt how to study, you can do anything you want.
1 Presentation 10: FLOOR SYSTEM COMPONENTS. 2 Framing Methods Platform Framing: –Each floor is constructed and then walls are placed on top.
Name of the course :Building construction Course code :HED 228 Credit hours :3hours Prepared by Eng. Nadir Abd alrazig siddig.
Name ________________ Unit 6/P6 – Traditional Construction Most common foundation = strip Damp Proof Course 150mm above ground level External Walls are.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
Week 6 Timber based columns
UNIVERSAL M. ENTP. www. affordablehousing. ug AFFORDABLE HOUSING & MUCH MORE JAN 01 – JAN 15.
AFFORDABLE HOUSING & MUCH MORE
Chapter 38 Alternative Layout Techniques. Introduction Basic methods for drawing a section with a concrete slab and truss roof –Will not meet needs of.
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
VIA / TCU 4th semester workshop S2016 CASE 2: Multistory Building VIA University CollegeTCU-VIA Workshop – S20161 A Quick Discovery of Construction in.
CONCRETE AND SUSPENDED TIMBER
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
Ryan Thurston | Duncan McLennan
Foundation Plan Layout
APPLICATIONS OF TECHNOLOGY
Temporary Works – P8 Project Practice.
Introduction to Masonry
The design and construction of ground floors:
Gantt Chart Presentation Name Course Name
Curriculum for Excellence
Substructure Construction Sequence
Construction Technology
RIBA Plan of Work 2013.
Drawing Interpretation
Objective 6.02 part 1: Recognize components of construction
Building Construction I Sofia Sebastian 1
International Building Materials and components
14 High Leys Drive, Ravenshead, NG15 9HQ
Btec Construction and the Built Environment: Unit 1
Framing the House                                                                                                                   
Elevation Layout and Drawing Techniques
MATERIALS AND CONSTRUCTION I
Building Drawings.
Strip Foundations The foundation runs under all the loadbearing walls.
Name____________________________ Tutor Group _____
Pier Foundations Piers Suspended floor Ground beam Next slide.
Gantt Chart.
Quantities and Price.
LINEAR BALANCE METHOD & MATRIX SCHEDULE
At ridge height for family room
Timber Frame Panel with opening Typical panel comprises a series
RIBA Plan of Work 2013.
Presentation transcript:

Progress Charts

Objectives Identify stages of the construction program. Draw up a basic working program. Identify health & Safety issues. Identify construction trades, plant etc.

Site Set Up

Clear Site Tracked excavator

Set Out & Excavate Foundations

Concrete Foundations Ready Mix concrete

Stepped Foundation

Brickwork to DPC level (Substructure) Opening for drainage run

Drainage in place-back filling in progress

View of drainage runs

Concrete slab Reinforcing DPM in position

Leveling Concrete

Floating slab Power float

Finished floor

Next stage of construction (Superstructure)

View through cavity wall

Blockwork ready to take joists Joist level Lintels in position

Blocking in between joists

Internal wall

Roof trusses in position Wall Plate level

Gable End

Bricking in ladders

Task 1 Assume the construction project you have just seen in the presentation is of a two bedroom house. Fill a the progress chart, You must include labour and plant requirements for each stage of construction. An example will be supplied. Tips for completion- assume 2:1 bricklaying gangs, a foreman is required for supervision and a JCB can be used for the excavation.

Sample progress chart