SHMS "pivot-patch" cable run Experiments: NPS, LAD(?), CGEN(?)

Slides:



Advertisements
Similar presentations
ATLAS Pixel Detector BCM Signal Cable October 13, 2005 E. Anderssen, LBNL.
Advertisements

TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Next Act Wall: 3 Different Panels All wood is 2x4 unless otherwise specified.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
RPC system cable routing Yang Changgen, Guan Mengyun IHEP, Beijing.
ITOP LV power supply and cable scheme G. Visser Indiana University 3/17/2015.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
1 HV Bias Power Patch Panel for Scintillator KLM Gerard Visser Xiaowen Shi overview Schematics layout Parts.
Problem 2 week 18. Question A basketball coach wants to hang 3 plaques on a wall. She wants to hang the three plaques side by side so that they are centered.
F.F. - 18/07/ User Guide of the Input Trigger Multiplexer unit with input signal rate counters.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
OD HV Upgrade Hans Berns Jeff Wilkes U. of Washington 10/14/01.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
The ZDD data structure Each ZDD channel produces a positive “waveform”, one 8-bit sample every 2 ns This waveform is then splitted in “fragments”: a sequence.
Douglas P. Moehs Emittance Probe 1 (side) Distance from slit to detector: inches Detector with multiple collectors Expected collector width based.
Services in GIF++ A pictorial record of the work HV Cables LV cables DCS cables Signal Cables Ian Crotty 17 Dec 2014.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Hall D Civil and Cryogenic Issues Ravi Anumagalla.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
Stage Areas. audience wing space wing space back wall (overhead view) What are we looking at here? An actor Which way is he facing? A stage.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
D. Breton, S. Simion February 2012
PID meeting SNATS to SCATS New front end design
Jean-Sebastien Graulich, Geneva
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Update of MVD services and requests
Beam
General aspects: Optical links :
VELO-installation meeting CERN, January 17, 2006
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
NA62 RICH ELECTRONICS LOGISTIC Part 2 R. Ciaranfi 25/05/2011.
RHICf Japan meeting General status
T1 Electronic status Conclusions Electronics Cards:
PMT cabling Gian Luca Raselli INFN Pavia
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
Chamber Design and Integration RE3/1 and RE4/1
Electronics for RPC Upscope
First of all we will remind some numbers:
HF Test station at P5 A.Mestvirishvili.
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
SHMS Q2 with Beam Line Shield Pipe
during Fall GMp run (high current)
NI Data Acquisition (DAQ) Wiring and Connections
Significant Digits and Scientific Notation
Hall C Users Meeting 31 January 2009
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
SHMS Downstream Beamline
Possible parasitic measurement during Fall GMp run
RPC Electronics Overall system diagram Current status At detector
Stephen Pate New Mexico State University September 1999
Polarized 3He target installation
Presentation transcript:

------------------------------------ SHMS "pivot-patch" cable run Experiments: NPS, LAD(?), CGEN(?) - Run from pivot around the carriage to beam-left to under-floor of electronics hut is roughly 65--75' - Radiation is significant concern (_do_ need a robust bunker somewhere..) - Probably do _not_ want to run cables along beam-right side of carriage (radiation damage) Assume beam-left (large angle) side of carriage Assume patch panel in front of carriage? Rough cable count: NPS 1200 cables LAD < 600 cables? CGEN < 600 cables

Patch panel here? (next to small crane)

Cable run here?

Penetrations into SHMS electronics hut

Use 1 DAQ space for patch for all 1200 signal cables flashADC will require 5 crates, so likely 1 and 2/3 rack space Could in principle try to use 3 red slots for DAQ (1 empty, 1 half empty) and future DAQ along wall

------------------------------------ SHMS "pivot-patch" cable run Experiments: NPS, LAD(?), CGEN(?) 1200 HV cables (NPS-driven others are less) - RG59 : 0.242" OD; 0.023 lbs/ft - 72 in2 + overhead - Cable tray: nominal 24" wide 4--6" tall tray - fills 1--2 penetrations 1200 RG213 cables - Diam: 0.405" OD, - Weight: 0.115 lbs/ft - Sig Sp: 66% - Termination of old cables? - reterminate at least one end -- cost? - Cable tray: - 200 in2 + overhead - nominal 30" wide 10" tall tray - nominal 24" wide 12" tall tray - fills 3--4 penetrations 1200 RG58 cables only 1-2 penetrations

High density BNC patch High density HV breakout panel (BETA weldment in ESB) Like this 64 cables on 3.5 inch high panel Can fit over 1200 cables in one rack Iike HMS: Here can fit at best 5 times 64 cables in rack

Hall C HV Count Total Hall C (negative) HV count: 813 ch (Older CAEN units: 13 crates, 64ch/crate) 336 ch (New CAEN units: 2 crates: 192ch +144ch) ------- Channels presently allocated to the spectrometers: HMS is using a (nominal) 200 channels SHMS is using a (nominal) 400 channels There are at least a few more of the older CAEN (64ch) crates kicking around site that are _not_ included in the above count. (Those crates are in use in the EEL/ESB for test-beds, staging, etc.) Not all of the older crates and not all of the older cards are functioning, so you may wish to subtract 10--20% off the 'old crate‘ channel count for contingency. Need to decide where we want the HV mainframes. In electronics hut or as in 6-GeV era in counting house?

Consensus seems to be that the most generic solution for Hall C would be to have: Patch panel at front of SHMS deck, to accommodate 1200 channels Cable runs at beam-left (large-angle) side of SHMS Use penetrations into SHMS electronics hut Try to fit in one rack a patch panel for 1200 connectors ( regular BNC) To do: Do we need more HV mainframes (can fit up to 240 channels in one caen mainframe) Where do we plan to have the HV mainframes – in CH or electronics hut? Work this plan out in more detail to see if everything fits Get buy-in from Thia & Steve