Conductivity Sensor Fabrication

Slides:



Advertisements
Similar presentations
Fabrication of Fishtank Reservoir
Advertisements

Fabrication of Fishtank Platform EAS 199B living with the lab.
Fabrication of Fishtank Platform ENGR 121 living with the lab.
Fish Tank Project Platform Fabrication EAS 199B Portland State University Mechanical and Materials Engineering.
Waterproofing a thermistor ENGR 121 living with the lab © 2013 David Hall.
Fabrication of a Conductivity Sensor EAS 199B – PSU Version living with the lab.
Living with the lab Attaching Arduino to Boe-Bot Chassis © 2012 David Hall.
Assembly of conductivity flow loop living with the lab (in preparation for calibrating conductivity sensor)
Fabrication of a Conductivity Sensor ENGR 121 living with the lab.
Switches & whiskers on the Arduino living with the lab lever arm switches mounted to Arduino © 2012 David Hall.
Using fixed-cell references and built-in functions in Excel living with the lab © 2012 David Hall.
220  470  Gnd5V Currents Through Parallel Resistors 1 living with the lab © 2012 David Hall.
Introduction to Microsoft Excel living with the lab © 2012 David Hall.
Kirchoff’s Current Law (KCL) living with the lab University of Pennsylvania Library and Wikipedia Gustav Kirchoff (left) and Robert Bunsen (right) Bunsen.
Fabrication of Fishtank Reservoir ENGR 121 living with the lab.
Adding a Barrel Jack to a Battery Pack living with the lab © 2012 David Hall.
Building Circuits.
Measuring & Drawing a Barbed Fitting
Pump Fabrication Day Group A will draw their pump
Controlling Servos with the Arduino
Connecting Switches.
Pump Fabrication.
Series and Parallel Resistors
Pump Project Requirements
Pump Efficiency Fluid Energy Out + - Electrical Energy In.
Pump Performance Testing
Introduction to the Arduino
Why Won’t My Arduino Work?
Troubleshooting Your Multimeter
Introduction to SolidWorks
What’s in your kit?.
Pump Project Overview.
Robot Assembly.
How to Use Dial Calipers
Introduction to the Fishtank
Fabrication of Fishtank Reservoir
Conservation of Mass
Conservation of Mass Problem
Freshman Design Expo.
Prototyping with Sheet Metal
Linkages and Mechanisms
Pump Performance Testing
Troubleshooting Your Multimeter
Relays.
using the Arduino to make LEDs flash
Using Photoresistors with an Arduino
Torque and RPM of Gears
Conservation of Mass Problem
Data Types.
Finishing your Project
Using “if” statements.
Controlling the Heater
Conservation of Mass
Design Project Forecast
Digital Input from Switches
Measuring & Drawing a Barbed Fitting
Cash Flow Diagrams <in> <out> $200 $300 $150 $100
Arduino: For Loops.
Non-Concurrent Force Systems
IR Object Detection IR detector IR LED IR light reflected off object
Conservation of Mass Problem
Equilibrium of Non-Concurrent Force Systems
Non-Concurrent Force Systems
Evaluating Design Alternatives
Counting Servo Gear Teeth (FS90R Servos)
Static Equilibrium Problem
Using the Lathe.
Reservoir Loop.
Freshman Design Expo Presentations
Gearmotor Efficiency W table top gearmotor pulley string.
Presentation transcript:

Conductivity Sensor Fabrication

DISCLAIMER & USAGE The content of this presentation is for informational purposes only and is intended for students attending Louisiana Tech University only. The authors of this information do not make any claims as to the validity or accuracy of the information or methods presented. Any procedures demonstrated here are potentially dangerous and could result in damage and injury. Louisiana Tech University, its officers, employees, agents and volunteers, are not liable or responsible for any injuries, illness, damage or losses which may result from your using the materials or ideas, or from your performing the experiments or procedures depicted in this presentation. The Living with the Lab logos should remain attached to each slide, and the work should be attributed to Louisiana Tech University. If you do not agree, then please do not view this content. boosting application-focused learning through student ownership of learning platforms

Raw Materials Ultra High Molecular Weight Polyethylene (UHMWPE) Ultra high molecular weight polyethylene, 0.756 inch diameter bar ($1.74 per foot) Ultra High Molecular Weight Polyethylene (UHMWPE) white = hydrogen red = carbon Chain molecules align more than for lower density polyethylene (packed together more tightly) Type 316 stainless steel rod or wire, approximately 1/16 inch diameter ($0.46 per foot) Also known as poor-man’s teflon SOURCE:

Parts and Materials 1.75” long UHMWPE rod, 3/4" diameter with Q-bit through hole (0.332” diameter hole) spring-back type 316 stainless steel ( 0.064 inch diameter) 22 gage solid wire (40 inches total) crimp-on snap-plug terminal, non-insulated male, 22-18 AWG, .156" plug dia (2 pieces) nylon barbed fitting - 3/16" tube ID, 1/8 NPT male (straight) brass hex nipple, 1/8 NPT male on both ends

Safety Rules Do not operate any machine unless you have completed a hold harmless form been trained to operate the machine been authorized to do so by the instructor or lab monitor When using rotating equipment such as milling machines, drills and lathes, securely tie long hair back to remove the possibility of it falling below your face do not wear loose clothing remove lanyards or jewelry hanging from your neck or wrist remove all items on arms below the elbow (you can roll up your sleeves) When using power tools like milling machines, drills and lathes, clamp the workpiece in a vise or chuck before drilling or cutting never hold or restrain the workpiece with your hand make sure all safety guards are closed before powering up machine never leave a running tool unattended When working in the lab, always wear approved eye protection take common sense precautions & avoid “horse play” keep work area clean & organized never use your own power tools only use lab facilities to complete activities required for ENGR 120, 121 and 122 report damaged equipment, unsafe activities and accidents to the instructor Do not begin any fabrication until you have carefully read the operating and safety instructions on this slide and agree to operate the equipment in a responsible manner. You must sign the safety contract before beginning fabrication.

Create threads in each end using 1/8 NPT Tap

Mark locations for conductivity probes Location for inserting probes Center mark 1/2in

Drill holes for the probes Rest the ends of the work piece on the parallels (different parallels may be used) Use a #53 drill bit (0.059 inch diameter) so the 0.0625 inch SS rod will be press fit into the hole Drill 0.625 inches deep into the bottom wall of the work piece (this is 1/8 of an inch shy of going all the way through) Press the rods into the holes This is a little tricky. Go slow and keep the rod in place with one hand while slowly tightening with the other.

Press terminals onto SS rods using vise (or tap on with a hammer) Crimp terminals onto rods Press terminals onto SS rods using vise (or tap on with a hammer)

Crimp 20 inch piece of 22-gauge wire onto terminals Be sure to strip the ends of the wire before crimping