IECEx Rules, Procedures and Reports Jim Munro Chairman IECEx Panel Assessors
Scope of presentation Rules and procedures IECEx Assessor Guide Standard report forms Technical Guidance/Capability Documents Separation of ExCB and ExTL National accreditation Follow up activities Jim Munro International Compliance Pty Ltd
Rules and Procedures IECEx 02 IECEx Equipment Scheme rules IECEx OD/003 Part 1: Appointment and Surveillance of IECEx appointed Assessors IECEx OD/003 Part 2:Assessment, surveillance assessment and re-assessment of ExCBs and ExTLs – Equipment Scheme IECEx OD 005-1 Quality System requirements for manufacturers –> ISO/IEC 80079-34 IECEx OD/009 Issuing of CoCs, ExTRs and QARs Jim Munro International Compliance Pty Ltd
Rules and Procedures IECEx Document OD 025 Management of assessment and surveillance programs for manufacturers ISO/IEC Guide 65:1996 IECEx Document OD 17 Drawing and documentation guidance ISO/IEC 17025:2005 IECEx Technical Guidance Documents (TGDs) ExTAG decision sheets (DSs) Jim Munro International Compliance Pty Ltd
The IECEx Assessor Guide Jim Munro International Compliance Pty Ltd
Standard Report Forms Single report form now for both ExCB and ExTL – F-003 Site Assessment Report – OD006 Checklist – ISO/IEC Guide 65 – OD007 Checklist – ISO/IEC 17025 – OD018 Jim Munro International Compliance Pty Ltd
TGDs/TCDs Technical Guidance Documents (TGDs) to become Technical Capability Documents (TCDs) Who does what Jim Munro International Compliance Pty Ltd
Separation of ExCB and ExTL’ Separation between testing/ assessment and certification decisions Jim Munro International Compliance Pty Ltd
National Accreditation What is it? ILAC and IAF Scopes of accreditation What a 17025 accreditation might cover Jim Munro International Compliance Pty Ltd
Follow-up activities Resolving issues Annexes A and B of the site assessment report The final reports Review by the Secretariat Jim Munro International Compliance Pty Ltd