WORKSITE PREP AND THE DECON

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Exterior Window and Door Frames
Common Components of a Traditional Wood Framed Building
1 Construction and Renovation Activities in Healthcare Facilities What construction crews should know, but were afraid to ask!
Classroom Safety. Fire & Life Requirements as per State Education Dept The following list relates to the classrooms and adjacent areas. They are provided.
Presents 2012 Revisions to the NC Energy Code For Residential Building started after March 1, 2012.
Facilities Management and Design Chapter 4 Safety and Security systems.
AMERICAS TOTAL NOISE CONTROL COMPANY Sound pressure is measured in a unit called decibels and is often abbreviated dB. Zero decibels is the lowest sound.
ENERGY CONSERVATION: HOME WRAP, INSULATION, AND STOPPING AIR LEAKS.
Interior Wall and Ceiling Finish
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
BSA Health System, May 2009 Next Slide Previous Slide BSA HEALTH SYSTEM Infection Control during Construction, Renovation, Repairs, and Maintenance All.
Presented By: Kary S. Amin Nova Environmental, Inc.
Presented By: Dean Soultanian Director of Proposal Development & Principal in Charge of PCB Remediation Activities March 30, 2011 Managing PCB Contaminated.
“Do not take anyone’s advice as to how this building should be assembled.”
October Module 4: Contain Dust During Work Overview What is containment? Containing dust for interior activities. Containing dust for exterior.
Farmworker Housing Inspections Unit 3: Conducting the Inspection.
SETUP Chapter 6 Lead Abatement for Workers Course.
ICRA Panel System Installation Instructions
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Chapter 4: Air Leakage Control: Materials and Techniques
The Ariel Assembly Instruction By Laser Dollhouse Designs.
Adriana Galue Wolfgang Custom Finishes HOME ENERGY STATS Biggest energy consumers Space heating – 34% Appliances and lighting – 34% Refrigerator.
Asbestos Abatement Projects Worker Protection - EPA.
Salvage Operations Henderson Truck Company Manual.
9/30/ Module 2 Set-Up Your Workspace to Contain Lead Dust.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
HVACR116 – Trade Skills Mechanical Drawings.
Demonstrating a Home Under Construction Purpose: To use your knowledge of the construction process and production USPs to influence the sales process and.
Part 2: Buildings as a System Lee F. Ball Jr., PhD
6/11/ Module 2 Set-Up Your Workspace to Contain Lead Dust.
Residential Construction Window Installation Guide *Source: (1) Carpentry & Building Construction Feirer & Feirer (2) Sill to Sash; A Professionals Guide.
Insulation and Infiltration
Objective 1.03: Explain ways to adapt housing to meet special needs.
Air Leakage and Water Vapor Control Chapter 6. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson.
1 Energy Efficient Housing. 2 Why construct energy efficient structures? Bottom Line !!! Money It may save up to 60% of the cost to heat/cool the structure.
Flood Recovery. Flood Recovery is physical, emotional and spiritual care of disaster-affected persons.
9/30/ Module 4 Clean-up and Check Your Work.
Affordable housing project
Objective 1.03: Explain ways to adapt housing to meet special needs.
Windows & Doors Chapter 8. Windows Provide natural light, air circulation, and a view for the home and members living in the home Also serve as a point.
HEALTHCARE SYSTEM Infection Control during Construction, Renovation, Repairs, and Maintenance All workers engaged in the construction, renovation, repair,
 Market Survey  Design, supply, delivery and installation of a Clean Room Facility  at the entrance of the LAr detector tank,  used for the storage.
Drafting 2 (Arch) Quiz Review #3 Quiz Review. 1.Dashed lines that follow the counters in a kitchen floor plan most likely represent: A dishwasher Upper.
Components of Construction part 2
Common Components of a Traditional Wood Framed Building
Common Components of a Traditional Wood Framed Building
PROTECTING THE WORKER PROTECTIVE CLOTHING Need for clothing
APPLICATIONS OF TECHNOLOGY
Presented by: NAME HERE
Major Steps In Building a SFR
Objective 6.02 part 2: Recognize components of construction
Do Now #7 What are the dimensions of the footing?
Wood Frame Systems Civil Engineering and Architecture®
Waste Disposal Requirements
Electrical Gas Plumbing Heating & Cooling
Asbestos NESHAP Inspection and Safety Procedures Course Chapter 8
INTD 503- Materials Topic: Partition Walls
F Bathroom and E bedroom wall
GLOVE BAGGING & PLASTICIZING
Common Components of a Traditional Wood Framed Building
EPA Lead Certification Requirements
Safety Hazards for Asbestos Abatement Workers
G kitchen What makes you special!
Wall and Ceiling Construction
Common Components of a Traditional Wood Framed Building
Building standards Mr. Da Silva.
© OnCourse Learning.
Common Components of a Traditional Wood Framed Building
Presentation transcript:

WORKSITE PREP AND THE DECON 05/20/02 WORKSITE PREP AND THE DECON Objective: Understand the proper techniques for preparing the work area and setting up a decontamination unit. SLIDE #1 (Tray 1-27): PREPARING THE WORK AREA AND ESTABLISHING THE DECONTAMINATION UNIT. Objective: Understand the proper techniques for preparing the work area and setting up a decontamination unit. 05/20/02 CPWR

PREPARING THE WORK AREA Worksite Prep and the Decon 05/20/02 PREPARING THE WORK AREA Objectives of work area preparation Sequence and methods for work area preparation SLIDE #2 (Tray 1-28): PREPARING THE WORK AREA. • Objectives of work area preparation • Sequence and methods for work area preparation 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #3 (Tray 1-29): Posted asbestos warning poster. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #4 (Tray 1-30): A worker unrolling 6 mil poly. (Question: Should this worker be dressed out?) 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #5 (Tray 1-31): Duct tape. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #6 (Tray 1-32): A can of spray glue. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #7 (Tray 1-33): A blocked exterior exit with a posted asbestos warning poster. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #8 (Tray 1-34): A classroom where critical barrier 6 mil poly has been applied along with some 6 mil floor poly. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #9 (Tray 1-35): A shop where heavy machinery is kept in place and covered with critical barrier 6 mil poly. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #10 (Tray 1-36): A HVAC vent covered with critical barrier poly. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #11 (Tray 1-37): The first layer of 6 mil floor poly being put down. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #12 (Tray 1-38): A second layer of 6 mil floor poly being seamed with spray glue to the first layer of poly. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #13 (Tray 1-39): The second floor layer of 6 mil poly but is being seamed with duct tape. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #14 (Tray 1-40): The first layer of 6-mil wall poly be applied, used tape tabs. (Question: What else can be used to anchor this poly? and What factor(s) affect our choice of anchors?) 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #15 (Tray 1-41): 6 mil wall poly being anchored with nail blocks. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #16 (Tray 1-42): The bottom of second layer of wall poly draping over second layer of floor poly. (6 mil) 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #17 (Tray 1-43): A fully plasticized room. (Question: What do you think of this job? – note lights at top, for one.) 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #18 (Tray 1-44): A light fixture covered with poly. (Question: Is this what you would have done? And What about the small window?) 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #19 (Tray 1-45): 6 mil poly critical barrier on space heater. (Question: What about the other items in this room?) 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #20 (Tray 1-46): Drop- or suspended- ceiling light panels which have been removed from the regulated area. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #21 (Tray 1-47): Interior fixtures removed from the regulated area prior to abatement. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #22 (Tray 1-48): Stairs covered with 6 mil poly. (Question: How would you keep it from sliding?) 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #23 (Tray 1-49): Frames being set to either barrier off part of the building or to make doors which will minimize asbestos migration in the regulated area. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #24 (Tray 1-50): A power source which needs to be locked and tagged out. 05/20/02 CPWR

ESTABLISHING THE DECONTAMINATION UNIT. Worksite Prep and the Decon 05/20/02 ESTABLISHING THE DECONTAMINATION UNIT. Functions of a Decontamination Unit Basic Construction of a Decontamination Unit Procedures for Entering and Exiting Work Area through the Decontamination Unit SLIDE #25 (Tray 1-51): ESTABLISHING THE DECONTAMINATION UNIT. • Functions of a decontamination unit • Basic construction of a decontamination unit • Procedures for entering and exiting work area through the decontamination unit 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #26 (Tray 1-52): Abatement workers constructing a solid - walled decon unit. (Question: Would you use particle board or something else?) 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #28 (Tray 1-53): A completed decon unit with water filtration/pump (EPA minimum 5 micron filter) for the mandatory shower. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #28 (Tray 1-54): A PVC pipe decon with air locks. (Question: What about the open end on the clean room entry side?) 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #29 (Tray 1-55): A containment, possibly a decon or waste load-out, in a hallway. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #30 (Tray 1-56): Escape directional arrow place on decon wall. (Question: How high, or low, should some of these be placed?) 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #31 (Tray 1-57): A portable decon trailer and shower. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #32 (Tray 1-58): A portable shower stall waiting to be installed. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #33 Tray 1-59): A water filtration unit for shower. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #34 (Tray 1-60): Exterior picture of decon shower recirculating pump. 05/20/02 CPWR

NEGATIVE AIR FILTRATION SYSTEMS Worksite Prep and the Decon 05/20/02 NEGATIVE AIR FILTRATION SYSTEMS Principles and procedures for setting up a negative air filtration system on an abatement project Use and limitations of negative air filtration units SLIDE #35 (Tray 1-61): NEGATIVE AIR FILTRATION SYSTEMS. • Principles and procedures for setting up a negative air filtration system on an abatement project • Use and limitations of negative air filtration units 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #35 (Tray 1-61): NEGATIVE AIR FILTRATION SYSTEMS. • Principles and procedures for setting up a negative air filtration system on an abatement project • Use and limitations of negative air filtration units SLIDE #36 (Tray 1-62): NAM with all the bells and whistles, but no slinky. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #37 (Tray 1-63): Frontal picture of NAM showing the three stages of air filtration: (1) gross pre-filter; (2) finer pre-filter; (3) HEPA filter. 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #38 (Tray 1-64): Operating NAM in regulated area. Law requires that it make a minimum of 4 air exchanges per hour. (Question: Why is the NAM wrapped in poly? and what do think of the housekeeping?) 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #39 (Tray 1-65): An external placement of NAM. (Question: Is there a moveable slinky inside or is the end of the slinky fixed at the building entry? Question: Do we have to concerned with the extra distance the air has to travel? [need greater capacity to pull over longer distances]) 05/20/02 CPWR

Worksite Prep and the Decon 05/20/02 SLIDE #40 (Tray 1-66): NAM from previous slide, showing connection of slinky at its entry point of the regulated area. 05/20/02 CPWR