PS wire scanner failures

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

PS wirescanner calibration Student Meeting 10/03/2014 Carolina Bianchini BE-BI-BL.
Supervisor: Jonathan Emery Labview control BWS Calibration Bench.
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
Module CC3002 Post Implementation Issues Lecture for Week 6 AY 2013 Spring.
David Cussans/Scott Mandry, NIKHEF, October 2008 TLU v0.2.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
WS Calibration (PSB) Student Meeting 11/08/2014 Carolina Bianchini BE-BI-BL.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Systems Management Server 2.0: Backup and Recovery Overview SMS Recovery Web Site location: Updated.
Overview of performance and limitations of current scanners and technical choices for a new wirescanner CERN wire-scanner development review
Time Management.  Time management is concerned with OS facilities and services which measure real time, and is essential to the operation of timesharing.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
Nov 28, 2013 Power Converters Availability for post-LS1 LHC TE-EPC-CCE.
8/12/2000Guy Crockford BI days New application software for SPS wire scanner controls G.Crockford SL/OP.
Status of Tev IPMs September 3, 2008 Andreas Jansson.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
BWS PS and SPS problem report J. Emery
Flex v5.3 Release Presentation June CONFIDENTIAL2 Release v5.3 – April 2008 Notable Features Manage master PCB with multiple assembly variations.
TELL1 command line tools Guido Haefeli EPFL, Lausanne Tutorial for TELL1 users : 25.February
PSB semgrid - wire scanners measurements Emittance working group meeting 13/10/2015 Emiliano Piselli BE-BI-BL.
Time Management.  Time management is concerned with OS facilities and services which measure real time.  These services include:  Keeping track of.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
BWS E. Piselli – J. Emery On behalf of the BWS working group people.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
HOW TO FIX MSVCR100. DLL IS MISSING ERROR? missing-error.
Mar 26, 2014 FGClite Power Control TE-EPC-CCE.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
HCAL upgrade FPGA FW: tasks and issues 12 May2016 Tullio Grassi, Univ. of Maryland.
Operational BWS usage statistics and open issues 2 nd Operational BWS meeting 01/12/2015 E. Piselli – A. Cudny.
Straw readout status Run 2016 Cover FW SRB FW.
Software for Testing the New Injector BLM Electronics
Beam Wire Scanner (BWS) serial link requirements and architecture
ATLAS Pre-Production ROD Status SCT Version
Update on BISW EYETS activities
LBDS TSU & AS-I failure report (Sept. 2016)
Status and Plans for InCA
Brief Status SPS Prototype PSB Prototype Installed in LS1
Alberto Valero 17 de Diciembre de 2007
UNICOS-CPC PLC Baseline improvement proposals
LIU Wire Scanner Milestones June 2017
CINEMA System Engineering
Evolution and future of the Access safety and control systems
Update on the VFC 8th June 2016 The VFC fan club.
New developments and inventory
SLS Timing Master Timo Korhonen, PSI.
Injectors BLM system: PS Ring installation at EYETS
BI seminar agenda “Project context and Introduction to the collaboration with the HES-SO”, 10 min, Jonathan Emery, CERN “A Generic and Modular Protocol.
Working plan for 2017 Acquisition and Control Electronics
RF interlocks for higher intensities (LMC 15 June)
EC Activities Status for the LIU
BE-BI Software for LINAC4
Status of the Beam Phase and Intensity Monitor for LHCb
MD2036: UFO dynamics studies and UFO fast detection
Possible causes for SPS ZS2 misalignment
LHC wire scanners status
PS operational beams 15 September 2017
swingo XP Firmware, Service Tool & Error Codes
The Ohio State University
Summary of Week 11: 14 – 21 March
CSC Trigger Primitives Test Beam Studies
Regression Testing.
Programme for Friday 9 July
CIS MS Windows Operating System
Configuration of BLETC Module System Parameters Validation
LIU BWS Firmware status
Status of the BI Work Package in the LIU-PSB frame
The Automation of the Sequencing of Accelerator Cycles and Events at Fermilab Stanley Johnson Fermilab Accelerator Operations.
Monday 5 July Morning: Continued with the Physics fill, 7b x 7b, 1e11/bunch Stable beams from 2:30 am to 13:30 : 11 hours.
Presentation transcript:

PS wire scanner failures MSGW 27/03/2015 Jonathan Emery - Emiliano Piselli BE-BI-BL

History 6 wire-scanner breakages since start-up in 2014 (2 PSB & 4 PS). All linked to incorrect re-initialisation of the wire to its home position Same hardware used without issues in 2012 Software modifications made during LS1 to add new functionalities revealed what are now known to be serious flaws in the wire-scanner firmware 3 distinct issues identified Missing triggers ~2% of all requested scans are not triggered 50% of cases result in wire remaining in IN position (other 50% - wire remains OUT) Recovery from IN position If electronics loses track of wire position erratic wire movement can be provoked Cause of latest breakage even with manual retraction New procedure now in place to deal with re-start after such an event No security on maximum initial drive voltage Injector Wire-scanner Status Report IEFC R. Jones 6th March 2015

Beam wire scanner firmware Motion control board with 3 on-boards FPGA Operational versions untouched since 2009 (No problem until now… ????) 4 different Firmware version to match all the types of scanners @ CERN: type: PSB-PS, type LINEAR (SPS and LHC), 2 types rotational in SPS Intensive use has shown its limitations, impossible to be fixed by software. Firmware release was mandatory in order to: 1) Have a safe InitHW sequence (return from IN position). 2) Add an extra safety to avoid the ‘reset home problem’. 3) Mitigate 1% of lost hardware triggers. 4) Return the scanner at home from every position. 5) Correct acquisition counter to avoid lost data. (software patch on-going to mitigate it)

Deployment history PS and PSB version - Deployed successfully during March 19th stop to fix 1) to 4) - Software patch on-going for 5) LHC version - Deployed successfully during March 19th stop with fix for 1) to 5) - Software address mapping changes on-going SPS versions - 2 scanners types (RL and RS) still to be released - Software address mapping to change - Deployment could take place by April 13th 2015, if no other WS tasks and if access possible. (BA4 and BA5 access are needed) 1) Have a safe InitHW sequence (return from IN position). 2) Add an extra safety to avoid the ‘reset home problem’. 3) Mitigate 1% of lost hardware triggers. 4) Return the scanner at home from every position. 5) Correct acquisition counter to avoid lost data. (software patch on-going to mitigate it) 1) Have a safe InitHW sequence (return from IN position). 2) Add an extra safety to avoid the ‘reset home problem’. 3) Mitigate 1% of lost hardware triggers. 4) Return the scanner at home from every position. 5) Correct acquisition counter to avoid lost data. (software patch on-going to mitigate it) 1) Have a safe InitHW sequence (return from IN position). 2) Add an extra safety to avoid the ‘reset home problem’. 3) Mitigate 1% of lost hardware triggers. 4) Return the scanner at home from every position. 5) Correct acquisition counter to avoid lost data. (software patch on-going to mitigate it)

Conclusions We have worked hard to get the firmware release and the lab tests done as early as possible All the PSB and PS are actually heavily used and they all seem to work properly…right GUIDO???? We have learned something…good lesson for the new wire scanner… We are available as much as possible in order to ensure good operation of the wire scanners! Carolina Bianchini

PS wire scanners failures People involved: G. Baud, B. Dehning, J. Emery, A. Guerrero, L. Jensen, R. Jones, E. Piselli, G. Sterbini Thanks for your attention! 6