SPD – ALICE DAQ/ECS/Trigger Integration Status Report

Slides:



Advertisements
Similar presentations
The Detector Control System – FERO related issues
Advertisements

Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
SPD DCS Status Report Ivan Amos Calì Università degli studi di Bari / CERN 15 th ALICE DCS Workshop.
The Control System for the ATLAS Pixel Detector
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
DAQ for the TPC Sector Test at Test Beam T10 ALICE DAQ Group ALICE TPC Collaboration Meeting Cagliari, Sardinia 16 – 17 May 2004.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
11/12 December 20061Borge S. Nielsen, NBI FMD contribution Second Installation and Commissioning Workshop DAQ and ECS FMD contribution Børge S. Nielsen,
Test Systems Software / FEE Controls Peter Chochula.
Update on DAQ Klaus Schossmaier CERN PH-AID ALICE TPC Meeting 21 April 2006.
1 CTP DCS luminosity monitoring A. Jusko, R. Lietava, J. Urban.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
MSS, ALICE week, 21/9/041 A part of ALICE-DAQ for the Forward Detectors University of Athens Physics Department Annie BELOGIANNI, Paraskevi GANOTI, Filimon.
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
The ALICE Data-Acquisition Software Framework DATE V5 F. Carena, W. Carena, S. Chapeland, R. Divià, I. Makhlyueva, J-C. Marin, K. Schossmaier, C. Soós,
ALICE Computing Model The ALICE raw data flow P. VANDE VYVRE – CERN/PH Computing Model WS – 09 Dec CERN.
P. Chochula ALICE Week Colmar, June 21, 2004 Status of FED developments.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
News on GEM Readout with the SRS, DATE & AMORE
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
CONFIGURATION OF FERO IN ALICE Peter Chochula 7 th DCS Workshop, June 16, 2003.
The ALICE Silicon Pixel Detector Control system and Online Calibration tools Ivan Amos Calì (a,b) On behalf of the SPD Project in.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Yu. Guz 16/04/20081 Radioactive source status R. Dzhelyadin, Yu. Guz IHEP, Protvino.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
SPD DCS Overview & FED Server
Peter Chochula Calibration Workshop, February 23, 2005
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
LHC experiments Requirements and Concepts ALICE
TPC Commissioning: DAQ, ECS aspects
Controlling a large CPU farm using industrial tools
ProtoDUNE Installation Workshop - DAQ
mmDAQ (Muon Atlas MicroMegas Activity – ATLAS R&D)
PCI BASED READ-OUT RECEIVER CARD IN THE ALICE DAQ SYSTEM
ITS combined test seen from DAQ and ECS F.Carena, J-C.Marin
The LHCb Run Control System
RPC Detector Control System
M. Krivda for the ALICE trigger project, University of Birmingham, UK
TPC Detector Control System
RPC Detector Control System: towards the final system
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
Pierluigi Paolucci & Giovanni Polese
R.TIEULENT - ALICE Offline Week
Presentation transcript:

SPD – ALICE DAQ/ECS/Trigger Integration Status Report Ivan Amos Calì Università degli studi di Bari / CERN On Behalf of the ALICE SPD project 2nd ALICE Integration and Commissioning workshop

Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop Outlook Divisional Silicon Facility (DFS) setup SPD readout with DDL, DATE and trigger system Performance studies Software integration Calibration Strategies SPD - ECS Integration Future developments 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop SPD People Involved Electronics integration: M. Krivda, A. Kluge, I.A.Calì Software integration: Henrik Tydesjö, Domenico Elia, I.A.Calì 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Divisional Silicon Facility (DSF) LHCb CERN, Building 186 Entrance Sector test & Sw/Hw precommissioning ALICE 124 m2 CMS Optical bench 2m x 1m Bond Lab Half-barrel assembly Laser FMD? 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop DSF “Control Room” Analysis tool & Interlock, T monitor system 2 FED Servers Cooling Control FED control PS control 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Trigger and DAQ setup at DSF Trigger Crate: 1 LTU board 1 TTCvi board 1 TTCex 1 VME Pc (lnxpool31) Optical splitter 2 LDCs (or 1 GDC + 1 LDC) equipped with 5 D-RORCs (10 DAQ ch.) 20 Routers equipped with 1 Actel-based SIU each 1 fun-in busy board Software: DATE v5.24 ECS v2.8 Linux SLC4 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

SPD - DAQ Hw Integration Common data headers (CDH) produced by routers using trigger information (bunch crossing, orbit number, L2 messages, etc…) CDH checking enabled in DATE and tested with low trigger rate (SEB, misalignment between L2 message and BCNT in MEB mode) SPD Status bits (Block attribute) used to define synchronization and missing triggers between HSs. SOD / EOD information integrated in common data header and tested with ECS Extra data header produced during calibration runs Basic data format checking embedded in the routers System tested extensively in DSF with 10 routers (20 in the experiment) and used to develop performance studies on SPD sectors 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

DAQ readout performance test I SPD average event size with 4 Routers: ~124 Kbytes 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

DAQ readout performance test II SPD average event size with 4 Routers: ~124 Kbytes 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop Software Integration DDL index defined for SPD (0..19) and mapping embedded in the AliROOT Aliroot and MOOD versions of raw data decoding and displaying (.date file based). Data format checks implemented. Calibration automatic procedures defined and final implementation ongoing 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop Calibration Scenario 1 RO Electronics Optical VME Ethernet (DIM) DCS Standalone emulate Alice Trigger and DAQ system Run number provided by Experiment Control System (ECS) for synchronization DCS network General purpose network Config. DB Data & Ctl Online Analysis Tool (ROOT based) FED Servers (x2) FED Servers (x2) FED Servers (x2) FED Servers (x2) Data To Permanent Data Storage (PDS) DCS FXS Comm.& Status PVSS Archives Condition DB PVSS FED control 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Calibration Scenario 2 RO Electronics ALICE DAQ Config. DB DAQ FXS Optical VME Ethernet (DIM) RO Electronics ALICE DAQ Data Local Data Collector (LDC) Analysis Scripts0 Monitoring Programs (MOOD & Calib. Data Displ) DAQ network DCS network Control Config. DB DAQ FXS To Permanent Data Storage (PDS) FED Servers (x2) FED Servers (x2) FED Servers (x2) FED Servers (x2) Extra data header produced inside the routers to delivery information to the analysis scripts DCS emulate Alice trigger system Comm.& Status Condition DB PVSS FED control 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop ECS Integration SPD FSM top node integrated in the ECS States and action recognized by ECS and DCS Calibration structure and sequence tested A series of calibration runs have been developed using SPD sectors 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop Outlook Trigger status bit integration ongoing SPD defined trigger information header ongoing Implementation of calibration procedures in the detector algorithm framework Parameters definition for automatic Data Quality Monitor New Top Node FSM to be implemented (No meajur changes to be applied) Connection from DAQ FXS and DCS configuration Db to be implemented 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Detector installation & commissioning Check location of DDL SIUs and optical patch panels Detector installation: When ? Will the detector DAQ contact be present during commissioning ? DAQ & ECS needed during commissioning Operation from upstairs starting on ? 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop Summary Electronics integration concluded and performance test demonstrated adherence with requirements ECS for SPD fully operative (New DCS top node?) Calibration sequences defined and a prototype of the analysis script released Data quality monitor and data display under development 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop BACKUP 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop SPD FSM Top Node set_mode {mode} OFF Startup{mode} STANDBY {mode} go_physic READY PHYSIC standby_physic shutdown cal_mode: Minimum TH Scan (DCS_ONLY_MIN_TH_SCAN) (DAQ_MIN_TH_SCAN) Mean TH Scan (DCS_ONLY_MEAN_TH_SCAN) (DAQ_MEAN_TH_SCAN) Uniformity Matrix Scan (DCS_ONLY_UNIFORMITY_SCAN) (DAQ_UNIFORMITY_SCAN) Noisy pixels (DCS_ONLY_NOISY_PIX_SCAN) (DAQ_NOISY_PIX_SCAN) go_calibration{cal_mode, run_n} CALIBRATION {cal_mode} Standby_calibration mode: PHYSICS CALIBRATION MCM_ONLY BEAM_TUNING run_n is the run number provided by the ECS in case of DCS_ONLY calibration runs 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

SPD Calibration Scenarios DCS Standalone: No trigger from trigger system No Data to DAQ DAQ active: Minimum TH, Mean TH, Uniformity Scan: Data pushed to DAQ Noisy pixels N trigger sent to detector (N = parameter) 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop Calibration Sequence DCS Standalone: ECS sends commands to DCS FSM and waits for the DCS state READY_CALIBRATION ECS starts a dummy DAQ run passing a run n to the DCS FSM ECS waits for the state STANDBY_CALIBRATION of the DCS FSM DAQ active: ECS start a DAQ run When DCS FSM returns to state STANDBY_CALIBRATION, the ECS stops the DAQ run The LDC scripts are started 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Calibration Data structure LDC analysis scripts parameters: run n, scan type Detector configuration information retrieved by extra calibration header Files produced in ROOT format 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop DDL performance test I 1 Routers   Sub-event recoded rate Byte recorded rate (MByte) event size max. min. 392 3248 2691 1.72 1.68 10624 3113 2590 26.6 22.3 20856 3021 2512 52.6 43.7 31108 3072 2553 77.6 69.6 41328 3004 2475 103.4 85.2 51568 2515 2400 126.4 121 61808 2207 2187 134.2 111 92504 1741 1435 162 135 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

DDL performance test II 2 Routers   Sub-event recoded rate Byte recorded rate (MByte) event size max. min. 716 3439 2861 2.46 2.45 62108 2860 213 177 123548 2606 2167 308 257 184940 1741 322 269 3 Routers   Sub-event recoded rate Byte recorded rate (MByte) event size max. min. 1040 3439 2860 2,7 2,3 93128 2863 320 288 185424 2610 2175 463 386 277376 1745 1412 484 432 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

DDL performance test III 4 Routers   Sub-event recoded rate Byte recorded rate (MByte) event size max. min. 1364 3444 2862 4,7 3,7 124148 2860 426 355 247028 2620 2167 621 615 369812 1755 1459 646 538 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop SPD FSM Hierarchy SPD DCS Sect0-9 HSect0-1 HS0-5 Infra Power HV LV Cooling FED Interlock Legend: FED (HSn) Cooling (Sect n) HSnPower Device U CU LV (HSn) 0-1 HV (HSn) LU 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop

Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop Common data header ALICE-INT-2002-010 V 5.0 11/12/2006 Ivan Amos Calì - 2nd ALICE Integration & Commissioning workshop