Construction Project Management

Slides:



Advertisements
Similar presentations
Construction Project management Prepared by: Muath Saadeh Saadeh Abu-Sa’da Kamel Beshara.
Advertisements

Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
Civil engineering department Graduation project (part 1)
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
An-Najah National University Faculaty Of Engineering Civil Department Construction PROJECT MANAGEMENT CONSTRUCTION PROJECT MANAGEMENT Prepared by: sameh.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
Conceptual Cost Estimating
INTRODUCING THE COST APPROACH Chapter 11. Base cost Builder’s profit Building shell Building size and shape Comparative square-foot method Construction.
Project Management Education
Building Industry Game B.I.G. - Building oror Building/Heavy Associated Schools.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Project Management. The Project Management Institute
Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Square Foot Estimating.
What’s a Project? AD642. Why the Emphasis on Project Management? Copyright 2011 John Wiley & Sons, Inc. 1-2  Many tasks do not fit neatly into business-as-usual.
An-Najah National University Engineering Faculty Civil Engineering Department Submitted in partial fulfillment of construction project management for the.
Project is a sequence of unique, complex and connected activities having one goal or purpose and that must be completed by a specific time, within budget,
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
Construction PROJECT MANAGEMENT Supervisor : E. Barraq Jumaa Prepared by: Ahmad Faqra Amjad Zarour Nidal Haroon.
Construction Project Management “Tubas Governmental Hospital” Prepared by: Asma’a Abu-Aqel Naheel Al-Naser Presented to: Ir: Barraq Jumaa.
CE Estimation & Quantity Surveying UNIT – IV VALUATION Prepared by Prof. S.L. DAVID ANANDARAJ.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Project Management An Introduction to Project Management Supervisor :eng. Baraq Juma’a Prepared by: Khaled Mohammad Sawalha Suha Tarek Awwad
C ONSTRUCTION PROJECT MANAGEMENT Submitted in partial fulfillment of construction project management for the bachelor degree in civil engineering Fuad.
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Construction Project Management Prepared By: Omar Al-Taher Supervised By: Dr Baraq Jum’aa.
PROJECT PLANNING AND SCHEDULLING
P ROJECT M ANAGEMENT. Case study Assumptions Methodology Discussion.
What is the “Project”? A temporary endeavor undertaken to create a unique product or service.
7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
What is project management?
+ Life is a Project… Allen P. Jones, PMP, MSPM. + Overview 1. Project Management Terms 2. Five Project Process Groups 3. Ten Project Management Knowledge.
Basic Project Management Process Basic Project Management Process Larry Creel July 11, 2003.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
I-15 North Phase 4 Preliminary DRAFT CRA Results July 2014
Project Planning and Implementation
Light Rail Transit Project
7.3 Determine Budget The process of aggregating the estimated costs of individual activities or work packages in order to establish an authorised cost.
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Construction Project management
{Beir Ziet Secondary Boys School }
TOPIC-8A- PROJECT TIME CONTROL
Construction Project Management
An-Najah National University
An-Najah National University
Construction Project Management
What is the best method for constructing schools in Palestine ?
Construction Project Management
Construction Project management
Awarding Criterion for late tender: the lowest bid- why?
Project Management Basics
TOPIC-7- PROJECT CASH FLOW
ARCH 435 PROJECT MANAGEMENT
Introduction DEFINATION :-
Resource Planning, Cost Estimation and Budgeting
TCU-PROJECT: 7TH Semester Course
The emphasis of Construction Management and Preconstruction Services in the AEC industry Preconstruction Services Construction Management.
ERE653 Final Project Saratoga State Parks Comfort Stations December 2, 2008 Kalpesh Parikh Process The bid and schedule for this project were created utilizing.
ENGINEERING MANAGEMENT (GE 404)
Construction Project Management
An-Najah National University Faculty Of Engineering civil Department
Muskat Secondary School Project
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Advancd Measurement and Contract Administration
Presentation transcript:

Construction Project Management Presentation of Construction Project Management Prepared By : Shareef Makhool , Abed Alsalam Kmail Ghadeer Jarooshi

What is the “Project”? A project is a temporary endeavor undertaken to create a unique product or service. Temporary : the project has an end date. Unique : the project's result is different from the results of other functions of the organization

What is the Project Management? is the process of combining systems, techniques, and knowledge to complete a project within established goals of time, budget, and scope.

Who is the project Manager? The person responsible for accomplishing the project objectives. is often a client representative and has to determine and implement the exact needs of the client .

Management Functions 1 Planning 2 Organizing 3 Leading 4 Controlling

Management Skills Conceptual Skills Human Skills Technical Skills

Construction Process Phases Preconstruction phase Procurement phase Construction Close out

Our Graduation Project

Aneen Secondary Girls School Project Overview Project Title: Aneen Secondary Girls School Location: Aneen village It is located to the west of Jenin city

This Project consists of main building Project Overview This Project consists of main building and external yards with boundary walls on the land with total area of 500 m2 The main building is consisting of two floors with total area 540 meter square.

The project was divided in several units. Assumptions The project was divided in several units. Working days are all days except Friday . The electrical and mechanical works will be done by sub contractors. Fixing the value (NIS) .

The structural method that used is : finishing the structural Construction Method The structural method that used is : finishing the structural part for the ground floor and then starting on the above floor structural work , and in the same time starting with finishing works for the previous floor.

Work Breakdown Structure

Bill of Quantity Preparation Calculations were made depending on Drawings to find the quantities and tabulating it.

The activity list entered in the (Primavera) program and it’s dependency also were managed on this program. The dependency of the activities were constructed according to our method of construction.

Activities Durations The activity duration depends on the productivity of labors and machines. At this project the productivity taken from site engineers and contractors

the pricing for each element of unit was different from each other the costing process based upon past experience for the contractor and some of labors. the pricing for each element of unit was different from each other some units were priced according to the area, others were priced according to number of units.

The profit percentage is 8% The over head percentage is 10% Results Cost Results Total cost of project calculated using Primavera project is (630440 NIS) The profit percentage is 8% The over head percentage is 10% The actual cost of project was (656847 NIS)

actual work in the project was 310 calendar days. Duration Results The total duration of the project as planed in this case study is 242 calendar days(208 working days). actual work in the project was 310 calendar days.

Justification of delay Problem one In excavation work: they found that a rock layer below the clay one and they had to extend the time to excavate the rocks layers Problem two variation order: for the boundary wall and preparing the asphalt work for the external yard

Weather Risks 25working days (30 calendar days) added to the end of project depending on rainy days and the beginning and finishing of the activities affected by rainfall.

S-Curve cost control of this project made By using (S-Curve). For this project the S-Curve is done by plotting cumulative cost with time as shown.

S-curve