Updates from SC18 Summer Meeting

Slides:



Advertisements
Similar presentations
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Advertisements

1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
1 API Subcommittee 6 Plenary Meeting Resource Group on Materials Tim Haeberle Chairman – API SC6 Resource Group for Materials 6 February 2014.
Product Lifecycle Management
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2014.
Cover graphic should fill and not exceed the defined grey box. June 27, 2013 Gary Devlin API Subcommittee 18 – Quality Task Group 7: Product Life Cycle.
Cover graphic should fill and not exceed the defined grey box. June 14 th, 2012 Gary Devlin API SC 18 – Quality Product Life Cycle TG7.
Report to API SC18 on Task Group 6, Welding API 2012 Winter Standardization Conference © 2012 Qualified Specialists, Intl. Chairman: Bud Weightman.
API SC18 Liaison report Mike Briggs SURFACE SYSTEMS RAISING PERFORMANCE. TOGETHER TM.
Cover graphic should fill and not exceed the defined grey box. API SC 18 – Quality Product Life Cycle TG7.
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
API Monogram Program Monogram Program Staff – SC Liaison Report
Kent Grebing, API SC 16 Chair
BALLOT July 2009 IFTA Annual Business Meeting.
API 6A 21 st Edition WG Update API Subcommittee SC-6 Plenary Valves and Wellhead Equipment June 19 th 2014.
Update on the API Work Group Activities on Pipe Markings.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi Chair
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
SC18 TG5 Development of a Guidance Document for the implementation of API Specification Q2 Objective Create a guidance document for users of the API Specification.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
SC18:TG8 API Specification Q1 Guidance Document.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
San Francisco, CA. SC8 Liaison Report
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Update of API Standards for Supply Chain Management API Standard 20J – Qualification of Distributors.
Subcommittee 21 - Materials Act as a resource on materials issues affecting multiple subcommittees under the Committee on Standardization of Oilfield Equipment.
API SPEC Q2 FOR AUDITING API MONOGRAM PROGRAM BOARD UPDATE TO SC16 Stacey W. Hagen ExxonMobil Development Company API Monogram Program Board Liaison to.
Supply Chain Management Report for SC 18 January 2013.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: Darren Bane (BHI)
Jürgen Großmann, Fraunhofer FOKUS
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
TG Chair: Mark Brinsden Shell
Task Group API 19SS Sand Screens
Standards Development: An Overview
API RP 17A - Discussion Points
API 16C Choke and Kill Equipment
Specification on float equipment
RAISING PERFORMANCE. TOGETHERTM
WG Technical Editor’s Report
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Summer Standardization Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
IEEE IMT-Advanced Review Process
Specification on float equipment
API 10 F.
IEEE IMT-Advanced Review Process
API SC 10 WG15 Stage Cementing Collars
WG Technical Editor’s Report
SC 18 Liaison Report Winter 2012
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
Float Equipment API Spec 10F
DRAFT ISO 10007:2017 Revision Overview Quality management – Guidelines for configuration management ISO/TC176 TG 01.
CSOEM Materials Advisory Resource Group
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Presentation transcript:

Updates from SC18 Summer Meeting SC17 Liaison Report Updates from SC18 Summer Meeting held in June 2015 Mohsen Shavandi SC17 Liaison January 2016

SC18 Previous Action Items ACTION ITEM 2014-3 (June 2014) – TG3 (API Monogram Program) is to provide proposed language in a document format that can be balloted to SC18 in order to provide guidance on qualification by the identified licensee classifications. ACTION ITEM 2014-4 (June 2014) – API is to ballot the TG3 formatted document to the SC18 membership to develop comments on the content of the TG3 document. ACTION ITEM 2014-5 (June 2014) – TG3 is to return and summarize to SC18 the result of comment ballot input with the intent that SC18 determine the next steps in use of the TG3 information. ACTION ITEM 2014-6 (June 2014) TG6 chair is to format the document to facilitate review of the data for approval by the subcommittee. Document developed and being finalized for ballot M- S-P (June 2015) to close.

SC18 Previous Action Items (Continued) ACTION ITEM 2015-1 (Jan 2015) – TG3 Chair is to develop an SRRR form for the development of a TR for the data from the TG3 activities that will be published for intended use by the MPB and the product subcommittees. SRRR submitted and approved by CSOEM M-S-P (June 2015) to close. ACTION ITEM 2015-2 (Jan 2015) – SC18 Chair is to notify the CSOEM and other SC chair of the upcoming ballot for TG3 document. CSOEM was notified as well as the SC Chairs. M-S-P (June 2015) to close. ACTION ITEM 2015-4 (Jan 2015) – API to Open a Comment Only Ballot for the new TG7 Document. Ballot closed and comments being resolved by TG. M-S-P (June 2015) to close. ACTION ITEM 2015-5 (Jan 2015) – TG6 Chair is to develop an SRRR form for the development of a TR for the data from the TG6 activities. SRRR submitted and approved by CSOEM. M-S-P (June 2015) to close.

Update on SC18 Task Group 3 [Attachment 11] Task Group 3 (TG3) – Task Group on Recommendations for Improvements to the API Monogram Program Charge: To review issues and develop recommendations for improvements to the API Monogram program i. NWI 3002 – [NWI Language Summary: Have a study conducted and recommendations made on the appropriate licensee classifications which organizations should be qualified per a given specification, e.g., assembler, steel manufacturer, etc.] Three action items (2014-3, 2014-4, 2014-5) remain open. M-S-P- Extend comment ballet period for Technical Report TG3 from 6 weeks to 8 weeks. Products within API Standards 20D, 20G, 20H & 20J are not monogrammable and are not within the scope of this report

Update on SC18 Task Group 3 (Continued) Organizations that should not be considered for Monogram Distributor Designer Remanufacturer/Repairer Plating/Coating Provider Licensees under each of the following Categories shall have in-house equipment, and personnel and shall perform the required processes needed to produce the products under the scope of the license: Mill Processor Assembler Tester Machiner

Update on SC18 Task Group 5 [ Attachment 12] Task Group 5 (TG5) – Quality Management System for the Service Sector Charge: Develop language for potential revisions of Spec Q2, beta- test site assessments for various drilling services and to create a document in order to facilitate the use of the new Spec Q2 (1st Edition). ACTION ITEM 2015-6 (June 2015) To have the voting Q2 members review the current sections of API Spec Q2 being evaluated for the Technical Report and provide feedback and input if other sections need to be included by the end of September to chair of TG5. ACTION ITEM 2015-7 (June 2015) SC18 Chair to coordinate sending a request to IADC requesting participation of their membership on SC18 TG5. Q1.

Update on SC18 Task Group 6 [Attachment 13] Task Group 6 (TG6) – Welding Requirements in the API Product Specifications (Bud Weightman) Charge: To review all API product specifications and recommended practices and to cross-functionally identify requirements for welding, brazing and soldering; the purpose is to identify criteria to be recommended for use where these processes are required. Document (TR) proposed for ballot in July.

Update on SC18 Task Group 7 [Attachment 14] Task Group 7 (TG7) – Product Life Cycle (Mike Briggs) Charge: To create a life-cycle management system document that provides the means of identifying the continued compliance of product to its original and/or current manufacturing and design requirements and the ability to demonstrate product compliance to original and/or current product standards and industry/product- specific technical and regulatory requirements throughout the product lifecycle Status: Draft Document was circulated on a comment ballot to SC18 and notification was sent to SC chairs requesting comments as well. There were 216 comments in total on the comment ballot and the TG has 125 comments remaining to be resolved. One are that has come up in the comments and is being heavily debated by the TG is if a Q2 QMS is required or if a Q1 QMS would be adequate.

Update on SC18 Task Group 8 [Attachment 15] Task Group 8 (TG8) Spec Q1 Guidance Document – (Bo Creek) Charge: To create a document in order to facilitate the use of the new Spec Q1, 9th Edition and to work with API Staff to determine the need for beta-site assessments and/or mock audits based on the new Spec Q1, 9th Edition. API Technical Report 18TR1, Guidance on Changes to API Q1, Ninth Edition, First Edition, published on June 5, 2015. Work accepted and Task Group is disbanded. M-S-P

Update on SC18 Task Group 9 [Attachment 16] Task Group 9 (TG9) – New task group (Jim Hood) Charge: To review the BSEE FIT-QC Report on connector bolt failures to determine if the current requirements of API Spec Q1- Quality Management System Requirements for Manufacturing Organizations for the Petroleum and Natural Gas Industry 9th, June 2013 has the provisions needed to ensure that system control features are in place, and clearly stated, to eliminate these type of failures in the future. First TG meeting delayed. Meeting planned for after summer meeting.

Monogram Program Report from SC18 Liaison to the API Monogram Program Board (MPB) – [Attachment 17] SC18 TG 3 output is in process. MPB recommends commenting on this document. If API product standard is silent on manufacturing requirements, SC18 TG3 document will be used by Monogram Program once published. If API product standard contains manufacturing requirements, they will be used by Monogram Program in lieu of SC18 TG3 document. NOTE: An API SC could write manufacturing requirements document for entire SC and release as addendum for all documents under their purview. Monogram Program Status/Update (API Certifications Staff) A summary report was provided by Aaron Duke [Attachment 18]

New Business Items M-S-P – To reactivate Task Group 2. Raouf Naguib will chair M-S-P – To charge TG2 to review FDIS ISO 9001:2015 for possible changes needed to API Spec Q1 and to report back to SC18 on the gap analysis. Motion to charge TG5 to review FDIS ISO 9001:2015 for possible changes needed to APIQ2 and to report the gap analysis to SC18 – Motion failed.