University of California, Los Angeles Endcap Muon Purdue

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 1 TMB, RAT, and ALCT Status Report Jay Hauser University of California Los Angeles ALCT/Mezzanine.
TMB and RAT Status Report Endcap Muon OSU April 16, 2004 Yangheng Zheng University of California, Los Angeles  TMB Status  RAT Status.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
Martin von der Mey, EMU at CMU, October ALCT and TMB Status Martin von der Mey University of California Los Angeles ALCT production statusALCT production.
Endcap Muon meeting: FNAL, Oct , 2004 J. Hauser UCLA 1 TMB and RAT Status Report Jay Hauser University of California Los Angeles.
TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
15 Sept 2009G. Rakness (UCLA)1 Paper progress On the Analysis Review Committee for the paper: “Performance of the CMS Cathode Strip Chambers with Cosmic.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Gregory PawloskiAugust 22, 2002 MPC Testing Progress.
Status of the CSC Track-Finder Darin Acosta University of Florida.
CMX Production Status Presented to the L1Calo Meeting on Monday 22-Sept-2014 by Dan Edmunds for the CMX Group.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CSC Endcap Muon Sorter Mezzanine Board Rice University July 4, 2014.
UCLA Group Meeting May 01, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari May 01, 2014.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
Andrew Peck 1 CSC OTMB Firmware Meeting February 21, 2014 ALCT/TMB/RAT Test Stand at CERN Setting up complete duplicate of the ALCT-TMB-RAT test stand.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
University of Wisconsin
Initial check-out of Pulsar prototypes
Update on CSC Endcap Muon Port Card
VME Bus error A possible error condition for TMB whose firmware has been “misloaded” is to cause Bus Error on VME crate controller (VCC) at power up… Under.
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
University of California Los Angeles
Muon Track-Finder Trigger
“Golden” Local Run: Trigger rate = 28Hz
CCB to OH Tests at Rice M.Matveev Rice University May 12, 2016.
University of California Los Angeles
ALCT Production, Cable Tests, and TMB Status
University of California Los Angeles
University of California Los Angeles
Regional Cal. Trigger Milestone: Major Production Complete
CSC Trigger Update Specific issues:
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
John Lane Martin Postranecky, Matthew Warren
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
TMB, RAT, and ALCT Status Report
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
University of California Los Angeles
University of California Los Angeles
TMB and RAT Status Report
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
University of California Los Angeles
VCC Hardware Production Status
SP Main FPGA & DT transition card design status
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
CSC Electronics Problem Report CSCE I&C
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

University of California, Los Angeles Endcap Muon meeting @ Purdue TMB-RAT Status Report CSC/ME1/1 Meeting Oct. 6 2006 Yangheng Zheng University of California, Los Angeles Outline: Mezzanine cards, TMBs, RATs production details Firmware/Software updates Endcap Muon meeting @ Purdue 6-Oct-2006

TMB-RAT pair (version 2006) RAT Board Receives ALCT And RPC data CFEB Input Connectors Xilinx XC2V4000 Mezzanine board Endcap Muon meeting @ Purdue 6-Oct-2006

Bench Testing Software ~ 15K lines of code Mezzanine card test Hard resets test Connection test: CFEB connectors on TMB ALCT-RPC connectors on RAT DMB, MPC, CCB and VME connections on backplane (done by loopback backplane) TMB-RAT connections through backplane Delay chips test Other test (LEDs, EPROMs etc…) Endcap Muon meeting @ Purdue 6-Oct-2006

Mezzanine Cards Status TMB Virtex-2 mezzanine cards: In 2004 – 2005, 542 mezz. cards assembled. 520/542 work fine without extensive rework 22 sent out for re-balling, only 7 recovered. New: 40 additional mezz. cards had been assembled in July, 2006. All passed the test.  Plan: assemble 10 more mezz. cards with reballed Virtex-2 chips. Endcap Muon meeting @ Purdue 6-Oct-2006

Endcap Muon meeting @ Purdue TMB Production Status 468 TMB’s in final system plan 15% spares: 540 in total Deliveries 520 shipped to CERN (495 tested: 3 found with problems) 10 shipped to Rice 3 shipped to Florida In UCLA electronics lab: 2 ready for shipping 19 need to be repaired Endcap Muon meeting @ Purdue 6-Oct-2006

Endcap Muon meeting @ Purdue RAT Production Status 468 RAT’s in final system Plan 15% spare: 540 in total Deliveries: Currently 540 shipped to CERN (495 tested: no problems found so far) 3 shipped to Florida In UCLA: 7 RAT boards need to be repaired Endcap Muon meeting @ Purdue 6-Oct-2006

TMB-RAT testing experience TMB: ~280 boards pass the test without extensive debugging. (error rate: ~50%) RAT: ~440 boards pass the test without extensive debugging. (error rate: ~20%) Mezzanines: Error rate 4% (compare to ALCT mezz. boards : ~30% error rate) Good assembly house made big difference for BGA project. Typical errors: soldering bridge/cold soldering (>90%) Bad chips/components (~10%) Mechanical errors (~1%) Endcap Muon meeting @ Purdue 6-Oct-2006

TMB Firmware/Software Updates Done by Greg with the help of Martin and others at CERN Software for programming eproms via VME controller/backplane TMB, CCB, DMB, MPC XML configuration for variable parameters RAT, ALCT via TMB with JTAG Firmware/Software update for small “Configuration” Eproms on TMB (done) Read in after hard reset reloads the firmware. TMB downloads its own registers using FPGA control of on-board VME circuitry. TMB downloads ALCT registers using JTAG Endcap Muon meeting @ Purdue 6-Oct-2006

Firmware/Software Updates (cont.) TMB+RAT+ALCT configuration (Greg): All (relevant) parameters now in xml file… Corresponding registers read from TMB, decoded into “user-friendly” format Configuration for TMB, RAT, and ALCT now takes following path: Parameters in xml file compared with configuration data in 2 proms on TMB prom 0 = TMB configuration parameters prom 1 = ALCT+RAT configuration parameters If different, proms programmed and verified Upon hard reset, TMB firmware loads TMB, ALCT, and RAT configuration parameters from user proms New software/firmware are being checked on slice test ME+1a To be implemented during MTCC phase 2 Endcap Muon meeting @ Purdue 6-Oct-2006

Board-maintaining/repairing Crew Engineer: Y. Shi (UCLA physics department) Students Special thanks to the following students who worked for the UCLA TMB-RAT project. Daniel Maronde, Paul Cubre, Jennifer Goodman, Alfonso Vergara, Mike Lee, Aaron Senter, Donald Chang Amber Bechtel Rina Kakimi Endcap Muon meeting @ Purdue 6-Oct-2006