Review of Revised SP 150 – Traffic Control Dated February 01, 2017

Slides:



Advertisements
Similar presentations
6F.01 – Types of Devices Support: FHWA policy that work zone devices meet NCHRP Report 350.
Advertisements

Draft Temporary Pedestrian Access Route (TPAR) Guidance
Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
The MMUTCD New Compliance Dates Sign Retroreflectivity
2-10 ODOT Sign Policy and Guidelines for the State Highway System Ch. 6 – Construction and Maintenance Signs Oregon Department of Transportation Traffic-Roadway.
2008 Mid-States Highway–Rail Grade Crossing Safety Conference May 20, 2008 David Peterson.
M.A.S.H.: The New Safety Hardware Crash Testing Criteria
Traffic Control Devices Module 4 1 This training is provided under Susan B. Harwood No. SH F-8. It does not necessarily reflect the views or.
Created by: Victor Lund, PEKen Johnson, PE, PTOE St. Louis CountyMnDOT.
February 26, 2015 | Fredericksburg, VA Work Zone Safety
SW Region Construction Conference February 19 th 2014 Joe Schneider – Work Zone Engineer Traffic Section – SW Region La Crosse Office.
Maintenance of Traffic (MOT)
Overview of 2009 MUTCD. Tom McDonald, PE Safety Circuit Rider Iowa LTAP.
Welcome to Inspecting Maintenance of Traffic Items on Projects
2009 MUTCD (Final Rule) Revisions Incorporated into the 2009 MUTCD Revisions to Chapter 2B – Regulatory Signs, Barricades, and Gates.
Part 3 – Markings. Dotted (not broken) lane lines shall be used for non-continuing lanes:  Lane drops  Auxiliary lanes  Deceleration lanes  Acceleration.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
Work Zone Safety It Starts With YOU!!. 2 BOOK 7 What is NEW??? IMSA TECHNICAL EXPO October, 2014 Dave Edwards.
June 2011 Statewide Traffic Engineers Meeting Interstate Guide Sign Upgrade Projects.
Signs, Signals, Markings & Speed Limits Driver Risk Prevention Curriculum State of New Hampshire Departments of Education and Safety Division of Program.
Driver Safety Fall 2014 Miss Padelsky. Traffic Signs, Signals & Road Markings  Traffic signs, signals & road markings are set up to control the flow.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
MUTCD and Traffic Sign Requirements This information is confidential and may include proprietary and/or trade secret information. It is intended for this.
Temporary Traffic Control Standards Update. Why? Came into this position soon after TC details became TTC standards about 1.5 years ago (2/13/2013) As.
Office of Traffic, Safety, and Operations Application Guidelines Warning Signs Signing Plan Design (At-Grade) June 20, 2012.
October 1, 2014 David Rush Work Zone Safety Program Manager, Traffic Engineering Division 2014 Work Zone Safety Team Reviews.
Office of Traffic, Safety and Technology Chapter 2 Signing Overview Traffic Signs 101 November 20, 2014.
ILLINOIS DEPARTMENT OF TRANSPORTATION Improving Safety For Incident Responders Illinois Department of Transportation Update: June 2010 MODULE 5 INCIDENT.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Revisions to Part 6 – Temporary Traffic Control. Guidance on lengths of short tapers and downstream tapers.
MUTCD Adoption Delays/Status. Manual on Uniform Traffic Control Devices (MUTCD) KRS requires the Cabinet to adopt a manual of standards and specifications.
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
SW Region Construction Conference February 19 th 2015 Jim Romanowski – Work Zone Engineer Traffic Section – SW Region Madison Office.
Revisions to Chapter 2C – Warning Signs and Object Markers
Minimum Sign Retroreflectivity Requirements Updated August 2012 with compliance date revisions.
Road Ranger / TMC Operator Joint Training Module 101 MODULE 10 MODULE 10 Road Ranger Work Zones.
2003 MUTCD Chapter 2A Signs General. 2A.06 Design of Signs  Add to the support statement “General appearance” of sign legends, colors, and sizes shown.
Understanding Work Zones
Donald E. Howe, P.E. Division of Traffic Operations California Department of Transportation Minimum Sign Retroreflectivity Requirements New.
2012 Work Zone Inspection For LTF Nancy Avery, LTF Project Supervisor December 6, 2012.
SIGNS, SIGNALS, AND ROADWAY MARKINGS
REVIEW OF THE PROPOSED SIGNIFICENT REVISIONS TO THE 2011 VIRGINIA WORK AREA PROTECTION MANUAL Fall 2014 Virginia ATSSA Chapter Meeting October 1, 2014.
Ezzeldin Benghuzzi, P.E UPDATE TRAINING Contact Information: Ezzeldin Benghuzzi, P.E ezzeldin. Contact Information:
Design Standards 1 Marshall Douberley 2012 UPDATE TRAINING Contact Information: Marshall Douberley Earl.
Work Zone Safety Virginia Work Area Protection Manual International Municipal Signal Association March 8, 2016 Paul Kelley & Ginger Quinn WZ Safety Coordinators.
Work Zone Safety Guidelines For Maintenance, Construction and Traffic Personnel.
2011 Road School Work Zone Traffic Control Handbook.
Maintenance and Temporary Traffic Control
ALDOT Specifications Update
2009 Manual on Uniform Traffic Control Devices
Chapter 2 General Principals of Traffic Signing
Drive Right Chapter 2 Unit 1
Traffic Control Devices
Signs, Signals, Markings & Speed Limits
Revisions to Part 7 – Traffic Control for School Areas
From Channelization, Islands and Turning Roadways (p ~ p
Georgia Struck By Alliance
Traffic Control Plan Development Course
Acceptance Process for Manufactured Products by Certification:
Traffic Control Plan Development Course
Traffic Operations Division
ALABAMA COURSE OF STUDY #2, #3, #4, #5, #6 AND #7
High Visibility ANSI Standard 107
Minnesota Driver’s Manual – Chapter 3
Flagging This presentation was prepared by Rich Lobdell for High Plains Power. The information herein is not intended to be complete in all aspects.
HERO UNIT Training Module
Example of cones and signs as traffic control at a roadway incident.
Georgia ATSSA Chapter Meeting: MASH Implementation
MODULE 10 Road Ranger Work Zones
Minimum Sign Retroreflectivity Requirements Updated August 2012 with compliance date revisions New Retroreflectivity standards were added to the MUTCD.
Presentation transcript:

Review of Revised SP 150 – Traffic Control Dated February 01, 2017 [ATSSA 2017 ≈GTPC 2017]

James Harry

Unexpected Road Construction Causes Accident Safety THIS WHY WE DO WHAT WE DO. Unexpected Road Construction Causes Accident

Audience Who is it written for: Inspectors Contractors Designer (both GDOT and Consultants) Public

Process Took 18+ months to draft. Over 360 changes Each change was reviewed by Construction Office Reviewed several times by Georgia Highway Contractor Association (GHCA) Not just one person ideas

SP 150: February 01, 2017 Contracts are governed by the SP 150 in that contract. SP 150 February 01, 2017, does not supersede previous versions Many dates within SP 150 Informative dates: MASH dates Termination dates/Sunset dates/ Milestone dates: upgrades

TTC Devices: added When any provisions of this Specification or the Plans do not meet the minimum requirements of the MUTCD, the MUTCD shall control. The 2009 Edition of the MUTCD shall be in effect for the duration of the project. All traffic control devices used during the construction of the project shall meet the Standards utilized in the MUTCD, and shall comply with the requirements of these specifications, Georgia Construction Standards and Details, Project Plans, Design Manuals, and Special Provisions.

TTC Devices: added

WTCS: Modified WTCS can be a subcontractor (not an employee of the Prime Contractor) WTCS will required active certification from NSC, or ATSSA ( no resume needed) WTCS will preform more inspections (monthly on all roadway/ weekly on interstates) New more detail TC-1

MASH Requirement: added In addition, temporary work zone devices, including portable barriers, manufactured after December 31, 2019, must have been successfully tested under 2016 edition of MASH requirements. Such devices manufactured on or before this date, and successfully tested under either NCHRP Report 350 or the 2009 edition of MASH, may continue to be used throughout their normal service lives.

MASH Requirement: added This is only for TTC devices. Other items have other milestones

TTC Devices – QPL: clarified All traffic control devices with applicable Qualified Products List (QPL) categories shall come from the appropriate approved list. 2. Products not on the QPL may be used with an approval letter from the Georgia Department of Transportation Office of Materials. 3. If there are no applicable QPL, the Contractor shall provide proof of MASH/NCHRP 350 certification. The proof may be a letter or written statement from the manufacturer that the product is MASH/NCHRP 350 approved. Decal certifications are not proof of certification and are not required.

Quality Guideline for all Temporary Traffic Devices: new ATSSA, “Quality Guidelines for Temporary Traffic Devices and Features” Incorporated into the SP 150.

Quality Guideline for all Temporary Traffic Devices: new Cover most TTC Devices: Signs, drums, precast concrete barriers, stop/go signs, marking, etc. Three level: Acceptable Marginal Unacceptable

Quality Guideline for all Temporary Traffic Devices: new Number counting / Percentage: 100 drum= 75 acceptable + 25 marginal

Quality Guideline for all Temporary Traffic Devices: new

Retroreflectivity: new A. Signs 1. For all projects let prior to and including April/May 2018, signs can be: a. All rigid fluorescent orange construction warning signs (black on fluorescent orange) shall meet the minimum retroreflectivity and color requirements of ASTM Type VII, VIII, IX or X regardless of the mounting height. . b. Warning signs (W3-1a) for stop conditions that have rumble strips located in the travel lane shall be reflectorized with ASTM Type IX fluorescent yellow sheeting. c. All other signs shall meet the requirements of ASTM Type III or IV except for “Pass With Care” and “Do Not Pass” signs which may be ASTM Type I unless otherwise specified 2. For all projects let May/June 2018 and afterward, all construction warning signs (black on fluorescent orange) shall meet the minimum reflectivity and color requirements of ASTM D4956 Type XI regardless of the mounting height. All other signs reflectorization shall be in accordance with the plans, contract, and “GDOT Signing and Marking Design Guidelines”. 3. Reflective sheeting should meet the requirements of Section 913 and QPL-29.

Retroreflectivity: new Channelization Devices For all projects let prior to and including April/May 2018, channelization devices shall meet the minimum requirements of ASTM Type III or IV high intensity sheeting. For all projects let May/June 2018 and afterward, all channelization devices (white/ fluorescent orange and white/red) shall meet the minimum retroreflectivity requirements of ASTM D4956 Type VI. 3. Reflective sheeting should meet the requirements of Section 913 and QPL-29.

Retroreflectivity: new

Retroreflectivity: new 2) TTC Devices: ASTM D4956 Type VI

TTC Devices: modified Traffic Drums: Vertical Panels: Type VI/ fluorescent orange/6” stripes/No orange band Vertical Panels: Type VI/ Fluorescent orange/6” stripes Can be used for longitudinal channelization in activity zone. No reduction in lane (<10’) req.

TTC Devices: modified Cones: Posts: Prohibited on Interstates/ Daylight use only/Can be use for flagging taper Posts: Square Tube and/or galvanized U-channel No wood posts

TTC Devices: modified Signs: - Construction Signs Type XI (Construction Signs) Rigid (not roll-up signs) Substantially plumbed and leveled Signs shall be visible and legible

TTC Devices

Pavement Marking: modified All Traffic Striping (≤ 45 days): min 4” wide All Temporary Striping (> 45 days): Intermediate surfaces min 5” wide Final surface overlaid/grinded min 5” wide All Temporary Striping on Final Surface: min 4’ wide

Clear Zone: new Clear Zone: 30 ft. GA 4000W (<=> 30 ft.) 6ft. Urban Area (curb and gutter) Equipment/Material/ TTC devices

Highway Work Zone: modified Req “reduce speed limit sign” Additional speed limit signs R2-1 Variable speed limit: VSL sign control the speed/ no R2-1 signs Request that speed limit be restricted to max 55 mph when working.

Shoulder Closure: new Shoulder Closures = Lane Closure Shoulder Closure require Engineer approval Restricted to two miles Shoulder Closures (MUTCD) Advance signing Tapers

Traffic Pacing: modified Increase time to 20 minutes Deleted static sign. / PCMS is required

Flagging Operations: modified Only two organization for certification: American Traffic Safety Association (ATSSA) National Safety Council (NSC) Flaggers require a min. Performance Class 3

Mobile Operations: modified Define a mobile operation by a min. speed of three (3) mph. Less than 3 mph will require a lane closure.

Work Zone Law Enforcement: added Now included in the SP 150 with the following modification: The Engineer may at his discretion increase the maximum number of hours. If no work zone law enforcement pay item is included in the contract, then all work zone law enforcement cost shall be included in Traffic Control – Lump Sum.

QUESTIONS?