Preparation for CERN test beam

Slides:



Advertisements
Similar presentations
CALICE Summary of 2006 testbeam for the ECAL
Advertisements

LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
13/02/20071 Event selection methods & First look at new PCB test Manqi Ruan Support & Discussing: Roman Advisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua))
Calorimeter1 Understanding the Performance of CMS Calorimeter Seema Sharma,TIFR (On behalf of CMS HCAL)
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
3 Nov 2006News - Paul Dauncey1 The 2006 beam tests have finished! DESY in May, CERN in Jul-Oct Many tens of millions of events and many TBytes of data.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
Cosmic Rays Data Analysis with CMS-ECAL Mattia Fumagalli (Università di Milano Bicocca) CIAO!
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
LCG Meeting, May 14th 2003 V. Daniel Elvira1 G4 (OSCAR_1_4_0) Validation of CMS HCal V. Daniel Elvira Fermilab.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
The 2007 CALICE Test CERN (part II) Erika Garutti, Fabrizio Salvatore.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
Preparation for CERN TB - Erika Garutti1 Preparation for CERN test beam H6 test beam area in Prevessin.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
30/06/08E. Garutti1 CALICE testbeam 2008 FNAL. 30/06/08E. Garutti2 The installation.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
November 15-18, 2002V. Obraztsov - Prague ECFA/DESY Workshop 1 Proposal for TESLA beam test zone at IHEP ( Protvino ) Vladimir Obraztsov Institute for.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
1 CERN 2007 Installation and Run Plan Erika Garutti & Fabrizio Salvatore.
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
First results from SND at VEPP-2000 S. Serednyakov On behalf of SND group VIII International Workshop on e + e - Collisions from Phi to Psi, PHIPSI11,
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
I.Laktineh IPNL. Outline  Technological Prototype Present activities To-do List Complementary R&D  SDHCAL for ILD Simulation Optimization study Integration.
Plan for the KEK beam test in November 2007 and Beyond Satoru Uozumi (Shinshu) Oct-1 Japan-Korea KNU.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
1 GSI, Darmstadt Goethe Universität Frankfurt Ph.D Committee meeting 16 th of August 2011 Grzegorz Kalicy Development and Test of a Prototype for the PANDA.
or getting rid of the give-away particles in a test-beam environment
Beam test of Silicon-Tungsten Calorimeter Prototype
Test Beam Request for the Semi-Digital Hadronic Calorimeter
the CALICE test beam set-up and running experience
HERD Prototype Beam Test
CALICE News The 2007 beam tests have started!
DAMPE Status (T9) Steadily taking data since last Thursday
CMS Preshower: Startup procedures: Reconstruction & calibration
F.Guber, A.Ivashkin INR, Moscow
HCAL Commissioning and Related Activities
CMS ECAL Calibration and Test Beam Results
ScECAL+AHCAL+TCMT Combined Beam FNAL
Installation and Run Plan
Preparation of the CLAS12 First Experiment Status and Time-Line
E. Garutti - Main Meeting
Rick Salcido Northern Illinois University For CALICE Collaboration
Testbeam analysis on module #1
CALICE: Major Items Since September
Michele Faucci Giannelli
LC Calorimeter Testbeam Requirements
Presentation transcript:

Preparation for CERN test beam H6 test beam area in Prevessin

First Draft schedule for CERN 09/03/06 These slides are on: http://www.desy.de/garutti/WeeklyHCALMeeting.ppt

For us this means: Jul 3 - Jul 8 ECAL/HCAL installation at CERN Jul 9 - Jul 26 ECAL/HCAL out of the beam line and restricted access time for LED checks, mapping, pedestal studies Jul 27 - Aug 8 ECAL stand alone (period 1) HCAL will be on! electrons with ECAL in front, first pion showers Aug 9 - Aug 23 parasitic calibration with muon or beam data Aug 24 - Sep 3 HCAL stand alone (period 2 ) suggested run with HCAL+ECAL too general understanding of beam spectra, rates, noise check angular scan procedure Sep 4 - Sep 19 ECAL/HCAL out of the beam line and restricted access Sep 20 - Oct 11 parasitic calibration with muon or beam data Oct 12 - Oct 24 Combined ECAL + HCAL (period 3) high statistics data taking for MC comparison program based on understanding during period 2

Data taking plan (before period 2) Full debug of mapping, noise, LED system Inter-calibration of all channels with LED system MIP calibration with muon from: beam dump / pion beam / cosmics (if rotation possible) Act as “tail catcher” to the ECAL during electron beam run First hadron shower if ECAL wants Goal: be on as much as possible to understand detector behaviour Finish to update to online monitoring plots, documentation, …

Data taking plan (period 2) Define the energy and angle range to scan: (90-Q) From Vasiliy Morgunov: http://www.desy.de/~morgunov/talks_articles/Start_point.ps.gz Constraints: CERN energy (5) 10 – 205 GeV rotation possible with stage Q = 0 – 35 deg

Data taking plan (period 2) Minimum plan: Matrix of combination with ~ 100k ev per point 5 steps in energy 4 steps in angle ECAL + HCAL and HCAL alone electron and pion beam Very conservative, in the reminder: more energies (try 5 GeV if possible), E [GeV] Q [deg] 10 18 25 50 100 e/p 5 15 35 More detained document + plan available soon under: http://polywww.in2p3.fr/~gaycken/Calice/TestBeam/

Data taking speed & beam info The DAQ rate with 500 ev buffering tested for full ECAL+HCAL r/o > 100 Hz (120 Hz achieved, can be improved) CERN beam spill structure: 4 s beam – 12 s spill separation for a 100 Hz DAQ (no buffering): 400 ev / 16 s = 25 Hz with buffering of 1000 events: 1000 ev / 16 s ~ 70 Hz  100k ev in 25 – 60 min

Beam purity Pion beam: for Ep > 10 GeV 97-99% hadrons of which: 10% proton in p+ (these numbers are E >1% antiproton in p- dependent) 1% electrons 1% muons Electron beam: for 40<Ee<120 GeV >97% electrons for Ee < 40 GeV use Cherenkov to separate e/p

Equipment to integrate @ test beam Trigger plates: 2x 3x3 cm2 for beam 2x 10x10 cm2 for muon from dump 2x large muon trigger (1x1 m2) 1x muon trigger after tail catcher 2 x/y drift chambers (3rd chamber optional) 10x10 cm2 area ~200 um resolution Cherenkov counter e/p separation up to 40 GeV All data recorded into DAQ + beam parameters: intensity, energy, magnets status, etc…

Data taking plan (period 3) … will follow from period 2 experience In general foreseen higher statistics & more energy points

Shift Rules and Schedule 3 shifts per day a 3 people need to be covered. shift at DESY is Mandatory before the first shift at CERN  goal: learn how to operate the DAQ and how to judge data quality The shift week at CERN starts on Wed. and ends on Tue. the following week Safety instructions should be attended on the Tue. prior shift starts In order to register and get all bureaucracy done it is advisable to arrive on the Mon. prior shift starts

Details of the shift schedule Still to be organized: clear task sharing for first level analysis and data quality control “shift schedule” for analyzers in DESY and other institutes

Preparation for CERN test beam Documents needed: (If required) Visa for Switzerland and France Medical certificate stating that You are allowed to work in radiation controlled areas. Registered as CERN user and Computer account  pre-filled forms will be made available to hand in before shift starts CERN Dosimeter (requires CERN email address, procedure not yet established) CERN Safety Course (video running every day. CERN access card required) Accommodation: critical! To be taken care in advance  check on CERN hostel service