RPC Barrel HV & LV system Lappeenranta University

Slides:



Advertisements
Similar presentations
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Advertisements

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV.
TRT DCS overview Elzbieta Banas Zbigniew Hajduk Jolanta Olszowska (INP PAS Cracow) ID Week /TRT Operation1.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
LV and HV status of the RPC system RPC detector and trigger group.
Low Voltage LB status RPC detector and trigger group.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
RPC Trigger Electronics Review Subjects: Link System Low Voltage Link System Upgrade Krzysztof Doroba, University of Warsaw Krzysztof Doroba, RPC TRigger.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Cables for the RE4 Upscope in CMS
CLAS12 DAQ & Trigger Status
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
HV & LV status LV system in W+1 and W+2 is OK
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
The IFR Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
23 Barrel chambers and 12 Endcap chambers
HV Imon in 1th MTCC period
RPC Detector Control System
RPC Detector Control System
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Dr. Pierluigi Paolucci - INFN di Napoli
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System: towards the final system
RPC Detector Control System
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction RPC description Requirements
HV & LV status LV system in W+1 and W+2 is OK
RPC Detector Control System
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
RPC HV-LV project Introduction System requirements and description
Pierluigi Paolucci & Giovanni Polese
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Equipment Status ARCS equipment status DAQ equipment status
Dr. Pierluigi Paolucci - INFN di Napoli
23 Barrel chambers and 12 Endcap chambers
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

RPC Barrel HV & LV system Lappeenranta University Pierluigi Paolucci I.N.F.N. of Naples Giovanni Polese Lappeenranta University Giovanni Polese

Hardware delivery status delivered ordered % P5 SY1527 3 100 1 BC 7 9 80 5 HV 47 58 13 LV 60 36 ADC 10 6 MAJISTE MAO Crate 34 27 HV FAN 14 12 Giovanni Polese

HV status Last month a new version of HV boards has been released by CAEN. Hardware and Firmware upgraded to fix all problems noticed during our tests and commissioning. 3 prototypes were tested intensively in 904 and good improvements have been noticed in the current readout. -> Next slide Caen starts the upgrading for all boards when new additional components are delivered. First bulk delivery is foreseen end of November (13 boards). All HV cables usc-uxc ready and tested. All chain tested and worked correctly for almost 3 wheels. Giovanni Polese

Preliminary test results 2 days @10kV Same working T Storing variations more than 0.2 uA Dy old board about 0.4 uA Dy new board about 0.2 uA ->MORE STABLE No steps seen until now and different behavior respect the old one. OLD sn42 NO EFFECT!!! NEW sn76 BOARD TEMP Giovanni Polese

LV system status All boards delivered and tested. Installation ready for 3 wheels. High percentage of problematic boards (30%), mostly noticed for boards of the first production (end 05 – beg 06). All MAO upgraded at the end of August and reinstalled in UXC. Improving in the temperature stability. Installation of the final LV system in progress, all components already in place under our control. Major efforts on the installation on the zero far to allow the use of upper sectors during GREN. Giovanni Polese

Conclusion Most of the hardware delivered, tested and installed in P5. Big improvements noticed in the new HV boards prototype, in production from the beginning of November. Positive tests performed in global operations for HV and LV system. Improving in time performances and in reliability expected with the new CAEN OPC server. Release foreseen for the next weeks. End of the Installation for LV system foreseen for end of the year. HV system ready for the beginning of the next year, major delay due to the upgrade of all boards. Giovanni Polese