Shift instructions August 16, 2017 Antoni Aduszkiewicz

Slides:



Advertisements
Similar presentations
Welcome to eDMR This PowerPoint presentation is designed to show eDMR users how to login and begin using the eDMR system.
Advertisements

MHSL - Dolphin Training Class
BePunctual Employee Time & Attendance (T&A) System User Guide.
Using the Web-based Training Tool MyFloridaMarketPlace Revised Date: 12/14/06.
M. Dracos LNGS, 03 August Target Tracker. M. Dracos LNGS, 03 August Rate tests SM1 Sensor (1,3,4) no signal Plane 6 absent Sensor (1,2,7)
© 2008 QUALCOMM Incorporated. External presentation to (audience), prepared by QUALCOMM’s (presenters name) – Month Day, 2008 Hours of Service Driver Training.
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
5. Data Manager 1. Introduction 2. Data Manager Duties 3. Quality Checking 4. Problem Reporting 5. Data Monitoring 6. Histogram Presenter 7. Trend Presenter.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Offline shifter training tutorial L. Betev February 19, 2009.
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
Run Coordination Summary of the May 14, 2004 Run Coordinator Meeting CT-EC2 Run Preparation Meeting May 17, 2004 Slide 1 Peter Loch University of Arizona.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
Reporter Training for High School RIO TM
5 July 2005T. Yasuda, Fermilab D0 Shift Captain Responsibilities Taka Yasuda Fermilab.
5/14/2003Sprint TekNet IP Train the Trainer1 Open TekNet Software If working at a client station, enter the IP address of the server and mark page as a.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
How to complete and submit a Final Report through
Central DQM Shift Tutorial Online/Offline
Run period 2010 Updated on C. Garabatos and C. Lippmann
FINESSE AGENT DESKTOP TRAINING.
Unit & District Tools Phase 1
Journal of Mountain Science (JMS)
Banner HR -Leave Report and Approver Training
Recruiter 2.0 Overview May 1, 2012.
ELPA21 Data Entry Interface (DEI) Overview
Central Online DQM Shift Tutorial March 2017, CMS DQM group
Student SOLE Page – Living Page
Offline shifter training tutorial
ELPA21 Data Entry Interface (DEI) Overview
Access to the experiment
Software Testing With Testopia
On-Line Analysis What the program does
Run period of summer 2012 Zoltán Fodor
Experience between AMORE/Offline and sub-systems
Offline shifter training tutorial
Overview of CLAS12 Calibration
Central DQM Shift Tutorial Online/Offline
Bomgar Remote support software
Test Administrator Interface & Student Interface
K. Grogg, M. Weinberg, M. Grothe
New Mexico Emergency Operations Center (NMEOC) Basic ETeam Training
Dismissal Staff Quick Start Guide
HRS Employee Self Service
ESS - Time & Labour - Employee
Data Entry Interface (DEI) Overview
Optimizing Efficiency + Funding
How To UPLOAD Policies.
How to Create and Start a Test Session
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Lessons learnt from the August trial electronic examinations
Test Administrator Interface & Student Interface
Data Entry Interface (DEI) Overview
Managing Sessions in PearsonAccessnext
How to Manage a Test Session
You must log in using both you address and your Full name before proceeding
Responding to a Rogers Sourcing Event STEP Table of Contents Page
Reporter Training for High School RIOTM
Welcome to WebEx Thanks to the NHS Institute for Innovation & Improvement for their contribution to this document.
Managing Sessions in PearsonAccessnext
Managing Sessions in PearsonAccessnext
Data Entry Interface (DEI) Overview
Welcome to the Second Tutorial
Building a healthy nation is what we do. Sidra Supplier Bid Submission.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Service Access Management Tool Notification Preferences
Reporter Training for High School RIOTM
CSC Shift Training and Operation + B904 Status
Presentation transcript:

Shift instructions August 16, 2017 Antoni Aduszkiewicz University of Warsaw Faculty of Physics

Detailed instructions are printed in the counting house, and can be also found in the TWiki page. This presentation is an overview. Each new shifter is obliged to take one training shift by joining another shifters in their tasks.

General rules Your and your colleagues' safety has the highest priority in all actions: follow the CERN and NA61 safety rules. Keep order in the counting houses. Return instruments/equipment used by you to their proper place. At least one shift-taker should stay in the control room. One shifter from the morning shift and one from the evening shift should participate in the run meeting (starting at 16:15) Write about all activities in the elog Discuss the status with the previous shift; pass information to the next shift!

Instructions to follow https://twiki.cern.ch/twiki/bin/viewauth/NA61/ShiftInstructionsAndChecklists General rules for the shift takers List of tasks for the shift crew Checklists: NA61 shift check sheet TPC currents checklist Magnet checklist

Electronic Logbook Go to DAQ terminal, E-log display workspace At the beginning of the shift create a new entry in Shift logbook Enter comments whenever relevant event occurs with Edit button (beam/no beam from SPS, access/end of access, etc). Never leave e-log in the editing mode. Submit the changes immediately. Ask experts about their current activities. On each terminal computer there is Printscreen- to-elog icon At the end of shift write a short Shift Summary Data taking actions are automatically logged, no need for human logging. Properly fill the electronic ”Run sheet” of RUNCONTROL

Checklists The main shift checklist guides you through the activities

RunControl Use buttons on the top to control DAQ application Make sure the shifter names and run sheet information are correct Check regularly the messages window for errors.

Target inserting/removing Regular target holder Go downstairs, vis-à-vis the gas cage Operated by three valves Follow the instructions printed below the control panel Vertex detector target holder Use an application to insert and remove the target Detailed instructions to be prepared before the run in October Procedure to change the target status Stop the run Move target physically Update information in RunControl Start new run

Data taking Supervision of the data taking is the main shift responsibility. Check often if DAQ application is running correctly Take target removed once per shift, about 10% of the total statistics (target needs to be moved using remote system located downstairs) Take pedestal run each 4–6h. If possible, take pedestals between target in runs. You can take pedestals when there is no beam. Restart run if it has more than 100k events, or it lasts for more than 2h. Make sure that the run information in the RunControl application is correct! If you make a mistake, write it in the elog.

Trigger rates Write selected averaged trigger parameters to the shift checklist each hour If the T2 rate or T2/T1 ratio drops significantly, contact BEAM expert Send a screenshot of the triggers page to elog once per shift Glossary: T2 - interaction trigger T1 - beam trigger

Spill structure If the spill structure becomes not flat for longer time, call CCC Send a screenshot to elog once per shift

SPS page1 Beam symmetry (should be close to 100%) Primary beam intensity SPS operator phones

Beam control If the beam intensity decreases or the beam disappears completely: No beam on the beam TV (without explanation) → complain to 77500 Beam intensity drops in TV → complain to 77500 Spill structure is not flat → complain to 77500 otherwise call BEAM mobile (161331)

Event Browser Is the picture refreshing several seconds? If not: Is DAQ running? Is there beam on the beam TV? Is the number of counts in S1 and T2 triggers stable? Are there tracks in all sectors?

BPD positions Go to: http://na61-qa.cern.ch → online monitor Write the mean BPD position each hour in the main checklist If the position changes by more than 5 mm call BEAM expert

PSD status All 44 modules should be green on both displays (HV and T) If not, follow printed instructions In case of any doubts call PSD mobile: 169114

Java Monitor Check the main page of the Java Monitor each 15 minutes Change of the measurement may signalise a problem If some values stop being updated, this may be due to DCS problem Check all pages each 2 hours

Software control Is DAQ running correctly? Is DCS (Detector Control system) running? Visual control of TPC signals in the Event Browser Do the Beam Position Detectors (BPD) histograms stay in the same place? Are trigger rates stable? Is PSD status OK in all modules?

Hardware control Fill three checklists: Are TPC currents stable (check in spill and outside of spill)? Check magnet currents and cryogenics status Check the gas system status (downstairs) Unusual noise? Water leak?